You are on page 1of 1

1

4
A B C D
1000 2000 3000
A

A
1

1200
2
9M POLE

9M POLE
9M POLE

9M POLE

+13.50M 4600
W.T (G+3)
3
B

B
STAIR
3900

CASE LOAD AT SUPPORTS (WORKING LOAD)

BASE PLATE VERTICAL HORIZONTAL


LOCATION LOAD IN (KN) LOAD IN (KN)
4
1100
DOWNWARD UPWARD

BP1 75.30 62.96 1.23


4200
OD BED
2800

BP2 49.38 48.14 16.04


C

C
5 FINAL E-NODE HT. PROVIDED=9M

FINAL AGL OBTAINED=13.50+0.5+9=23.0M


3200

2500


1400

DG SET
6
1. ALL DIMENSIONS ARE IN MM.
1900


9M POLE
9M POLE



7 
5. EXISTING NO OF FLOORS:G+3(13.50M).
D



LATITUDE - 13.0596
LONGITUDE - 80.24026

CLIENT: PREPARED BY PROJECT: SITE NAME & ADDRES : C1


PROPOSED 9M - H FRAM ROOF TOP POLES SITE GOWARTHAN - MANAGER,
NEW NO : 31, I-TN-CHNN-ENB-2819
(AS PER ENHANCED NEW DESIGN FOR 200 kmph)
OLD NO : 8/1,
DEIVANAYAGAM ST, ARAVINDHAN
DETAILS: 8056953500
NUNGAMBAKKAM,
SITE LAYOUT CHENNAI - 34,
REVISIONS PH.NO:9841053809.