You are on page 1of 1

Technical information for install new cable from air dryer LCP (G4-902 PLC) to DCS (Control room)

1. Refer ITB drawing:


Drawing title: Instrument overall cable block diagram
Drawing no: GPKIA-GPK2-FEL3-MIE-1111-INC-CBB-0001-R & M

2. Scope of Supply:
2.1 New 12C fibre optic cable S4-0001 from GPP4 new air dryer LCP to control building DCS
system.
Estimated length: 150 meter
Proposed Vendor: Draka or Hi Essence

3. Proposed underground cable routing:

4. Cable from new GPP4 air dryer shelter, (G4-902 PLC) to Control building (GPP4-DCS-IT1-IT2)

5. Proposed cable technical data, refer to attachment: