JOINT VENTURE "VIETSOVPETRO"
MIETSOVPETRO.
PROJECT EXTENSION OF GAS COMPRESSION CAPACITY AT BLOCK
09-17
TECHNICAL REQUIREMENT
FOR SUPPLY FUEL GAS SYSTEM
(Rev. 1)TECHNICAL REQUIREMENT aed ui
FOR SUPPLY FUEL GAS SYSTEM.
Page | 2of11
VIETSOVPETRO.
CONTENT
1. General.
1.1, Introduction...
12. Definitions
13. ‘The purpose of the document
1.4, Relevant documents ...csssseseseen
2. Technical requirements.
2.1. General requirements...
2.2, Applicabe codes and standar
2.3. Scope of Supply...
24, Scope of Work...
2,5, Detailed technical requirements...
Datasheet requirements
Experience of packager:
Fabrication requirements
Inspection and testing requirements
Painting, preservation and shipment requirements,
Delivery time.
Pe A ARE HW
Origin of country.
10, Year of manufacture.
11, Guarantee.
12, Certificate.
13. Documentation.
14, Support.
15, Attachment documents list.
3
3
3
4
4
4
4
5
5
5
5
a
6
6
6
1
PH
He
Be
1
8
8VIETSOVPETRO
TECHNICAL REQUIREMENT Rev. No 1
FOR SUPPLY FUEL GAS SYSTEM
Page | 3of 11
1
General
1.1. Introduction
1.2, Defi
‘The gas compression platform MKS was built in 1996. It is located next the oil
production platform MSP4 at White Tiger Oil Field of the Block 09-1, approximately
145 km South-East of Vung Tau City, offshore of the Socialist Republic of Vietnam.
‘The MKS and MSP4 platforms are connected via linking bridge. There are 04 high
pressure gas compression modules (BM100, BM200, BM300, BM400) operating on the
MKS platform with 315 MSCMD each.
In order to increase gas compression capacity at block 09-1 Vietsovpetro is developing
the project “Extension of gas compression capacity at block 09-1. Install Train A on
MKS”. Project scope of work includes:
Y Installation a new high pressure ges compression module Train A with capacity 1.7
MMSCMD on the MKS platform;
Y Modification of structure, process and utility systems on the MKS and MSP4
platforms to support for installation and operation of the Train A.
Before installation of Train A on the MKS platform, two existing gas compression
modules (BM300 and BM400) shall be removed. Removing of these two existing gas
compression modules is not in scope of the project “Extension of gas compression
capacity at block 09-1. Install Train A on MKS”.
Picture 1 - Location of MKS platform at White Tiger Oil Field
ions
PROJECT Extension of Gas Compression Capacity at Block 09-1
COMPANY The party which initiates the project and ultimately pays
for its design, fabrication, erection and owns the facilities,
UMRev. No 1
TECHNICAL REQUIREMENT
FOR SUPPLY FUEL GAS SYSTEM
Page | sof tl
Mewovecreo
Here the COMPANY is Vietsovpetro J.V. (Referred to as
VSP)
The party which participates in one set of bidding
BIDDER documents either as independent or joint bidder and will
sign contract with COMPANY.
The party which carries out design, procurement,
PACKAGER fabrication, assembled and completed commissioning for
13.
14,
21.
Poel gas system
The party who may be employed by the PACKAGER to
sub-PACKAGER | assist in performing part of the work /service for the
PACKAGER.
Independent International Cerlification agency like DNV
Germanischer Lloyd, BV, ABS, Lloyds Register approved
Third Party by COMPANY shall be employed by PACKAGER to
Inspector (TPT) perform design appraisals and manufacturing surveillance
activities at PACKAGER’s work with respect to the
subject work/supply on behalf of the COMPANY.
‘The purpose of the document
This Document specifies the main requirements and principle rules for the overall
design, supply, procurement, fabrication, errection, painting, inspection, testing and
delivery, pre-commissioning, commissioning of the Fuel Gas system to be built on MKS
platform, Extension of Gas Compression Capacity at Block 09-1 Project.
Relevant documents
Relevant documents are including the documents in "Section 15. Attachment documents
list ".
Technical requirements
General requirements
BIDDER shall be responsible for the design, supply, manufacture, inspection, testing,
painting, shipment and delivery of Fuel Gas system in accordance with technical
requirements as specified in this document, applicable codes and standards and attached
documents.
Other general requirements as specified at Section 2.0 General Requirements and
Section 3.1.4, General Requirement Specification for Fuel Gas Package (doc. No.
MKS-112-TS-TX1-SP-01).
The maximum available dimension of Fuel Gas system is 4,Sm(L) x 3,5m(W) x
4,5m(H).
In case of any conflict or inconsistence between any requirements of the Technical
requirement, Specification, Datasheet, codes, standards and other documents, the more
stringent requirement shall be aplly as below:VIETSOVPETRO
TECHNICAL REQUIREMENT fey Nea Hee
FOR SUPPLY FUEL GAS SYSTEM
Page | Soft
22,
2.3.
2.4.
2.5.
= Technical requirement;
- Datasheet for fuel gas package (doc. No. MKS-112-TS-TX1-DS-04);
= Specification for Fuel Gas package (doc. No. MKS-112-TS-TX1-SP-01);
= Other document in ITB (Invitation To Bid).
However, the BIDDER shall be responsible to inform or issue the official technical
correspondence to COMPANY/VIETSOVPETRO for approval.
Applicabe codes and standard
Applicabe codes and standard shall be complied with the codes and standards as
specified at the attached technical documents and other relevant international standards.
Scope of Supply
BIDDER to supply the Fuel Gas system and all necessary equipment, accessories as
specificied in section 3.1.1_Scope of Supply of the Specification for Fuel Gas package
(doc. No. MKS-112-TS-TX1-SP-01).
Exclusion: Special tools for operation, removal, installation and maintenance purpose.
Scope of Work
BIDDER shall be resposible to perform all the works as specified in section 3.1.2 _
Scope of work of the Specification for Fuel Gas package (doc. No. MKS-112-TS-TX1-
SP-01).
Detailed technical requirements
‘The Fuel gas system shall comply with the minimum requirements as specified at the
Specification for Fuel Gas Package (doc, No. MKS-112-TS-TX1-SP-01) and Datasheet
for Fuel Gas package (doc. MKS-112-TS-TX1-DS-04) as follow:
a. Technical requirement for design and manufacture is specified in section 3.2.
Design and Manufacturing requirements of Specification for Fuel Gas Package
(doc. No. MKS-112-TS-TX1-SP-01) and Datasheet for Fuel Gas package (doc.
MKS-112-TS-TX1-DS-0-
b, Technical requirement for Mechanical refer to section 3.3. Mechanical
Requirements of Specification for Fuel Gas Package (doc. No. MKS-112-TS-
‘TX1-SP-01) and Datasheet for Fuel Gas package (doc. MKS-112-TS-TX1-DS-
04);
c. Technical requirement for Layout refer to section 3.4. Layout Requirements of
Specification for Fuel Gas Package (doc. No. MKS-112-TS-TX1-SP-01);
d, Technical requirement for electrical refer to section 3.5 Electrical Requirements
and 3.12 Utility Bleotrical Requirements of Specification for Fuel Gas Package
(doc. No. MKS-112-TS-TX1-SP-01);
€. Technical requirement for Instrumentation refer to section 3.6. Instrumentation
of Specification for Fuel Gas Package (doc. No. MKS-112-TS-TX1-SP-01) and
Datasheet for Fuel Gas package (doc. MKS-112-TS-TX1-DS-04);
f, Technical requirement for piping refer to section 3.7. Piping Requirements of
Specification for Fuel Gas Package (doc. No. MKS-112-TS-TX1-SP-01);
“VVIETSOVPETRO
TECHNICAL REQUIREMENT eee '
FOR SUPPLY FUEL GAS SYSTEM
Page | Gof tt
g. Technical requirement for Structure refer to section 3.8, Structural Requirements
of Specification for Fuel Gas Package (doc, No, MKS-112-TS-TX1-SP-01);
h. Technical requirement for lifting refer to section 3.9. Lifting Requirement of
Specification for Fuel Gas Package (doc. No. MKS-112-TS-TX1-SP-01). In
addition, BIDDER shall be responsible for supplying the spreader bars /ifting
bar and accessories such as sling & shackle, etc., in accordance with technical
requirements.
i, Technical requirement for Transportation refer to section 3.10, Transportation
Requirement of Specification for Fuel Ges Package (doc. No, MKS-112-TS-
TX1-SP-01);
j. Technical requirement for Noise and Vibration refer to section 3.11. Noise and
Vibration of Specification for Fuel Gas package (doc. No. MKS-112-TS-TX1-
SP-01) and section Equipment noise datasheet of Datasheet for Fuel gas package
(doc, MKS-112-TS-TX1-DS-04);
k, Technical requirement for Utilities (Instrument air, Nitrogen, electrical utilities,
v.v.) refer to section 3.12. Utilities of Specification for Fuel Gas package (doc.
No. MKS-112-TS-TX1-SP-01).
Datasheet requirements
Datasheet for component and Fuel gas system shall comply the requirements as
specified at the Datasheet for Fuel gas package, doc. MKS-112-TS-TX1-DS-04,
Experience of packager
PACKAGER must have at least 05 years of engineering and packaging of process
equipment skids for offshore oil & gas application. In addition, PACKAGER has
carried out successfully at least 01 similar contract of Fuel gas skid or not less than 02
contracts of engineering and packaging of the process equipment skid for offshore
Oil & Gas application, including at least the following stages: design, supply,
manufacture, testing, commissioning, and start-up in the last 5 years by the end of
2017.
In the Bid proposal, BIDDER shall provide necessary documentation of the performed
contract (shall include as a minimum: contract number, scope of supply, scope of work,
certificates, acceptance protocols for completed commissioning, etc.)
Fabrication requirements
Fabrication and assembly of Fuel gas system shall comply with the requirements as
specified at Section 4, Fabrication Requirements of Specification for Fuel Gas Package
(doc No, MKS-112-TS-TX1- SP-01).
Inspection and testing requirements
BIDDER/ PACKAGER shall have resposibility to perform testing & inspection,
Factory Acceptance Test, Site Acceptance Test and sufficient certificates of the Fuel gas
system as specified at section 5, Inspection and Testing Requirements of Specification
for Fuel Gas Package (Doc No. MKS-112-TS-TX1-SP-01),
“AMIETSOVPETRO
‘TECHNICAL REQUIREMENT edhe 7
FOR SUPPLY FUEL GAS SYSTEM
Page | 7of tt
8
10.
uu.
‘The COMPANY reserves the right to perform or nominate a representative to observe,
witness a Factory Acceptance Test (FAT) and inspect at the PACKAGER’s shop to
verify overall system functionality prior to the Fuel gas system being shipped to
COMPANY 's yard.
Painting, preservation and shipment requirements
BIDDER/ PACKAGER shall have responsibility to perform Painting, preservation and
shipment of the Fuel gas system as specified at section 6. Painting, preservation and
shipment of Specification for Fuel Gas package (doc, No. MKS-1 12-TS-TX1-SP-01),
Delivery time
Fuel gas package shall be delivered at Vietsovpetro Port, No.67, 30/4 Road, Thang Nhat
Ward, Vung Tau City, S.R Viet Nam not later than twenty-two (22) weeks from the date
of signing contract date (the shipping time is included).
BIDDER shall submit a detail schedule to complete the scope of work within 01 week
after Contract signed. This schedule shall specify the manufacture duration, delivery
uration, all key milestones and update every week.
Origin of country
BIDDER/ PACKAGER must indicate the manufacturer’s name and country of origin
for main equipment and components of the Fuel gas system in the Technical Proposal.
There is no restriction of origin of country for Fuel gas system and its equipment.
However, the following origins of countries are recommended:
No. Description Recommended Original Countries list
1 | Fuel Gas Super heater EU-G7
Fuel Gas Filter - Separator EU-G7/Korea/ Australia’ ASEAN
2 [= Internal part of Fuel Gas | BU-G7
Filter - Separator (baffle type;
filter elements; vortex breaker)
3. | Actuated Valves EU-G7/ Korea/ Australia/ Malaysia/ Singapore
Year of manufacture
All components of the Fuel gas system must be brand new, un-used and manufactured
in 2017 or later.
Guarantee
BIDDER shall be responsible to guarantee for the complete Fuel gas system for a period
of (12) months from completion Site Acceptance Test (SAT) at COMPANY’s offshore
site or eighteen (18) months from the date of delivery (whichever comes first).
Detail of guarantee requirements are specified at Section 10. GUARANTEE of the
Specification for Fuel Gas package (doc. No. MKS-112-TS-TX1-SP-01).
aNMietsovecteo.
‘TECHNICAL REQUIREMENT
FOR SUPPLY FUEL GAS SYSTEM
Rev. No
Page
Bof lt
2.
13.
Certificate
BIDDER/ PACKAGER shall confirm and provide certificates of Fuel Gas system and
main components prior to shipment including but not limit to the following:
No. | Components Certificate
1 | Fuel Gas System
= Certificate of Confor
DNV-GL, BV): 01 original;
~ Certificates of Origin issued or authenticated by Chamber of
Commerce of Manufacture’s country or Exporter’s country: 01
original, (not applicable for Vietnam’s manufacturer);
~ Manufacturer's Certificate of Quality/Quantity: 01 original;
~ Manufacturer's Testing/ Inspection report certified by Third
party (ABS, Lloyd, DNV-GL, BY Register): 01 original;
sued by Third party (ABS, Lloyd,
~ Certificate of Warranty issued by BIDDER: Oloriginal;
~ Other certificate (if any): 01 original/ copy.
= Cerlificates of Orig
2 | Filter—Separator | °OPY
by manufacturer: 01 copy.
ssued or authenticated by Chamber of
Commerce of Manufacture’s country or Exporter’s country: 01
~ Manufacturer's Certificate of Quality/ Quantity: 01 copy;
~ Test certificate (Material test/ Mill test/ Inspection test) issued
Fuel Gas Super td
heater
01 copy
~ EwIP Certificate: O1eopy.
= Cerlificates of Origin issued or authenticated by Chamber of
Commerce of Manufacture’s country or Exporter’s country: 01
~ Manufacturer's Certificate of Quality/ Quantity: 01 copy;
- Test certificate (Inspection test report) issued by manufacturer:
Panel copy;
- ExlIP Certificate: Oleopy.
~ Certificates of Origin issued or authenticated by Chamber of
4 | Local Control Commerce of Manufacture’s country or Exporter’s country: 01
copy;
- Certificates of Origin issued or authenticated by Chamber of
5 | Actuated Valves Commerce of Manufacture’s country or Exporter’s country: 01
copys
~ Certificates of Origin issued or authenticated by Chamber of
6 | Manual Valve Commerce of Manufacture’s country or Exporter’s country: 01
Documentation
As specified at section 7, Documentation of Specification for Fuel Gas package (doc.
No. MKS-112-TS-TX1-SP-01).
BIDDER/ PACKAGER shall submit and send all drawings/technical documents to
COMPANY for review/approval before fabrication and assembly. List of document for
review/approval shail be finalized during project execution stage.
ONTECHNICAL REQUIREMENT Rev.No 1
FOR SUPPLY FUEL GAS SYSTEM
Page | 90ft1
VIETSOVPETRO.
Engineering/ Design documentation of BIDDER/ PACKAGER shall be reviewed and
approved by PACKAGER’s TPI (ABS, Lloyd, DNV-GL, BV) before approved by
VIETSOVPETRO.
Within five (05) working days after receipt of BIDDER/ PACKAGER’s technical
documentations, COMPANY shall send comments to BIDDER/ PACKAGER. Within
five (05) working days after receiving comments from COMPANY, the BIDDER/
PACKAGER CONTRACTOR shall actively discuss and/ or arrange meetings with
COMPANY to solve COMPANY’s comments; get agreement with COMPANY for
closing those comments, revise documents and issuing final documents for approval
(Final issue).
BIDDER shall be responsible for providing all documentation in accordance with the
BIDDER Data Requirements List (BDRL) approved by the COMPANY: Designed
documentations, AS BUILT Drawings and Documentation as per Contractor's standard,
including O&M Manuals, Certification Dossiers and Vendor Data Book.
During bidding stage, BIDDER shall submit the following documents:
No. Document name Remark
Capacity and experiences profile of the PACKAGER
Requirements; The BIDDER must send the necessary
documents: Contract (including minimum information: contract
number, scope of supply, scope of work, schedule of contract, etc.)
certificates, acceptance protocols for completed commissioning,
etc, to demonstrate the capacity and experiences of the
PACKAGER to meet at least two of the following requirements
I - PACKAGER must have at least 05 years of designing,
engineering and manufacturing package process.
~ PACKAGER has carried out at least 01 similar contract of
Fuel gas skid or not less than 02 contracts of supplying and
manufacturing complete process equipment skid for
offshore Oil&Gas application, including at least the
following stages: design, supply, manufacture, testing,
commissioning, and start-up in the last 5 years by the end
of 2017.
1 | Certificate of quality management system of the PACKAGER
(1SO 9001 or equivalent)
{M_| Technical documents
1 | Project execution plan
2. | Process description
3. | Inspection and Test Plan (ITP)
4 | Piping and Instruments Diagrams
5. | Calculation dossier/ process study report‘TECHNICAL REQUIREMENT panel :
FOR SUPPLY FUEL GAS SYSTEM
P f
VIETSOVPETRO- bi ee
6 | Equipment list
7 | Noise data sheet and Weight data sheet
8 | Catalogues for equipment and instrumentation
9 | Filled equipment datasheet
jo | General trangement drawings - Included tabulation of all
customer Interfaces, foundation, layout and loading plan
11 | Instrument/Electrical index
12 | Instrument/Electrical data sheets.
13 | SPIR - List of spare parts for commissioning and start-up
Prepare to plan for assistance COMPANY during co-coordination,
14 | taining, instalation, pre-commissioning, commissioning and
start-up. The BIDDER/ PACKAGER shall provide details of
estimated time/ number of personnel to complete the work.
15. | List of spare parts for 2 years operation ~ OPTIONAL
16 | Commitment letters from PACKAGER for BIDDER.
17. | Manufacturer list for main equipment and instrument
18 | Training program for operation and maintenance (OPTIONAL)
Technical documents /list of other documents must be submitted
together with the Technical Proposal according to the
19 | requirements of the Invitation for Bid, Specification for the Fuel
gas package, datasheet for Fuel gas package and other
attachments.
20 | Operation and maintance manuals, trouble shooting
Note:
* Main equipments of Fuel gas system included: Fuel Gas Super heater, Filter
~ Separator, Actuated Valves.
= BIDDER to submit the technical proposal shall include all necessary
information and documents as specified in the technical requirements and
technical! evaluation of Invitation for Bid.
14, Support
BIDDER/ PACKAGER shall provide qualified personnel in order to assist COMPANY
during pre-commissioning, commissioning and start-up at onshore and offshore site.
The cost for this service shall be fixed, lumpsum and paid by BIDDER/ PACKAGER.
15, Attachment documents list
ATTACHMENT DOCUMENTS LIST
oNRev. No 1
‘TECHNICAL REQUIREMENT
FOR SUPPLY FUEL GAS SYSTEM
—- Poge | of tt
St] type Doe. Ne. Descripsion
H MKS-112-TS-TXI-SP-O1__| Specification For Fuel Gas Skid
2 MKS-112-TS-TX1-DS-04 __| Datasheet For Fuel Gas Skid
3 MKS-112-TS-ME4-SP-02 __| Specification For Pressure Vessels
4 MKS-112-TS-ME4-SP-03 ___| Specification For Package Equipment
7 ines Spesienion For Elesical Requirmeat For
6 MKG-112-TS-IA2-SP-03 ‘General instrument Specification
7 MKS-112-TS-TPI-SP-O1 Piping Material Class Specification
8 MKS-112-TS-TP1-SP-02 Specification For Manual Valves
9 | Specification | \qKS-119-TS-TP1-SP-03 Specification For Piping Special Items
i matesees Specification For Piping And Equipment
10 MKS-112-TS-TP1-SP.04 Tecan
ik MAE TS TPS Os Spesifeaton a ing Fabrication, Installation,
2 wescraeinasnoe [Sree Fa, Suave Bewova Ve
13 MKS-112-TS-1A2-SP.05 Specification For Control Valve
i MKS-112-GEN-AZT-SCH-O1_| Basic Painting Schedules
15 MKS-112-GEN-AZT-SP-01__| Specification For Painting
16 MKS-112-TS-1A2-DS-10___| Datasheets For Junction Boxes
7 Tacume: MKS-112-TS-IA2-DW-I1_| Instrument Typical Hook-Up Drawings
eigen | MKS-112-TS-TPI-GEN-01 _| Pipe Support Standard
19 T
20 Layout [
21
2 [MKS-112-1S-TX1-DB-01__| Process Design Basis
23 | Simulation [MKS-112-TS-TXI-RPT-01__| Process Simulation Report
24 MKS-112-TS-TXI-HMB.01_| Heat And Material Balance
25 MKS-112-TS-TXI-PFD-01__ | Overall Process Flow Diagram
26 | P&ID | MKS-112-TS-TXI-PID-01__| PID - Symbols And Legends
27 MKS-112-TS-TX1-PID-I2 __| PID - Fuel Gas System