Project : FPSO ALMIRANTE

Project Number : 17056


CDR
P.O. Nr. Seq. Rev.
Code

SBM Document Number : 001 . 17056 . 000028 - AK 008 - 01


SBM CDR Description : Equipment Index & Data Sheets
IS CDR Code FC Applicable For This Order ? : NO (This Manual includes - Maintenance Manual / Schedule)

This document is part of VDB : VDB2


Supplier : Air Liquide
Address : Advanced Technology US LLC
9811 Kate Freeway Suite 100
77024, Houston, US

Package Description : PME - CO2 Removal Package


Vendor P.O. Reference : 001.17056.000028
Vendor Document Number : NG20088-M-2700
Vendor Document Revision : 01
Document Title : Equipment Datasheet - CO2 Membrane 1st Stage
Preheater

Total Pages (incl. front page) : 5


Applicable Tag Number(s) :
772-HEST-0201

Notes :

v 8-2
FPSO
EQUIPMENT DATASHEET - CO2 MEMBRANE 1ST STAGE PREHEATER

001.17056.0000028-AK008 01 PAGE: 2 of 5

Status / Date No. of


Written by Checked by Approved by
Revision (DD-MMM-YYYY) Pages
00 20/Apr/2021 5 RSO CCK MAG

01 18/May/2021 5 RSO CCK MAG

Last Issue
REASON FOR REVISION
Revised Section

00 Issued For Review

01 Detail information is updated as marked in Page 3, 4 and 5.


FPSO ALMIRANTE TAMANDARE
CO2 REMOVAL PACKAGE EQUIPMENT DATA SHEET
CO2 REMOVAL 1ST STAGE PREHEATER

Document No: 001.17056.000028-AK008-00 Area TS024 Date: 18-May-2021


Tag No.: 772-HEST-0201 No. Req. 1 x 100% By: CCK
Operation: CO2 Removal Package Project: FPSO ALMIRANTE TAMANDARE Reviewed: RSO
Services: CO2 Removal 1st Stage Preheater Job No.: NG20088 Approved: MAG
Revision: 01 Page: 3 of 5 Rev
01 01
1 Size(idxL): 500 x 5471 mm TEMA Type: H-BEM Connected in 1 parallel 1 series
2 Surf/Unit(Eff.): 01 78.295 m
2 Shells/unit: 1 Surf/shell (eff.): 01 78.295 m
2

3 PERFORMANCE OF ONE UNIT Maximum Duty Case (Case 6) (NOTE 15)


4 Fluid allocation Shell Side Tube Side
5 Inlet Outlet Inlet Outlet
6 Fluid name
7 Fluid quantity, Total kg/h
8 Vapor kg/h
9 Liquid kg/h
10 Steam kg/h
11 Water kg/h
12 Noncondensable kg/h
13 Temperature C
3
Refer to Process datasheet
14 Density(vapor/liquid) kg/m
CO2 Removal 1st Stage Preheater,
15 Viscosity(vapor/liquid) cP
16 Specific heat(vapor/liquid) kJ/kg.°C 001.17056.000028-AK004-00
17 Thermal conductivity(vapor/liquid) W/m.°C
18 Latent heat kJ/kg
19 Pressure kPa(g)
20 Velocity m/s
21 Pressure drop, allow./calc. kPa
2
22 Fouling resist. (min) m .°C/W
23 Average Film coefficient 01 2
W/(m .°C) 01
24 Heat exchanged 2451 kW MTD : 50.7 C corrected
25 CONSTRUCTION OF ONE UNIT
26 Tube No.: 01 325 OD : 19.05 mm NOZZLES-Number, Size and Rating
27 Tube Wall Thickness: 1.65 mm avg. wall 01 01 SHELL SIDE TUBE SIDE
28 Tube Pitch: 23.813 mm Tube Pattern: 30 Inlet: 300# 600#
29 Tube Length: 01 4.2 m Type: plain / finned / other Outlet: 300# 600#
30 Tube to tubesheet joint : 01 Strength welded 01 Intermediate: - -
31 Shell diameter, mm: (ID/OD) : 500 / 522.22 Vent: - 600#
32 Cross-baffle type: 01 Single-Seg. Drain: - 600#
33 Baffle spacing-c/c,mm: 575.1 No. of x-passes: 01 7 Pr. Relief: 300# -
34 Baffle Cut: 30 % Perpend. Design press. (kPag): 4000/FV 7000/FV
o
35 Tube support type: None Design temp. Min/Max ( C): -29 / 160 -29 / 160
36 Longitudinal baffle seal type: None No. of passes/shell : 1 1
37 Bypass seal type: Seal strips Corrosion allow. mm: 3 3 (Note 17)
38 Impinge protection: Y/N Typ: Rec.Plate Explosion Blast Load kPag 100 (Note 15)
39 Saddle Height 800 mm Surface Preparation(Note 4) Inside N/A Outsite SA 2.5
40 Radiography 100 % Protective coating (Note 4) Inside N/A Outsite System-16
41 MATERIALS OF CONSTRUCTION
42 Shell: SA516-70N Tubes: SA789 TP316L GASKETS
43 Shell cover: SA516-70N Shell side: Spiral Wound (VTA)
44 Channel or bonnet: SA516-70N + 3mm CA Tube side: Spiral Wound (VTA)
45 Channel cover: - Floating head: -
46 Floating head cover/bolts: - Spare gaskets reqd.: Yes
47 External bolts SA 193 B7M/SA 194 Gr2HM (Xylar/Xylan 1424) External Attachments SA516-70N
48 Tubesheet: Fixed: 01 SA105N + 3mm CA(BOTH SIDES) Test ring reqd.: No
49 Baffles: Cross: SS316L Longitudinal: - Insul.-shell: 100 mm
50 Tube support material: - Insul.-chn.: 100 mm
51 Expansion joint type: - Exp. Jnt. mat'l: -
52 Pressure design code: 01 ASME Sec.VIII Div. 1 Latest Ed. Stamp: 01 Yes TEMA Class: 01 R
53 Classification : BV Class Local Regulation : NR-13 Sour Service : Y
54 Weight/Shell, kg: Empty wt.: 2,700 01 Operating wt.: 3,124 01 Test wt.: 3,684 01
FPSO ALMIRANTE TAMANDARE
CO2 REMOVAL PACKAGE
CO2 REMOVAL 1ST STAGE PREHEATER

Document No: 001.17056.000028-AK008-00 Area TS024 Date: 18-May-2021


Tag No.: 772-HEST-0201 No. Req. 1 x 100% By: CCK
Operation: CO2 Removal Package Project FPSO ALMIRANTE TAMANDARE Reviewed: RSO
Services: CO2 Removal 1st Stage Preheater Job No. NG20088 Approved: MAG
Revision: 01 Page: 4 of 5 REV
HEAT EXCHANGER MECHANICAL DATASHEET
NOZZLE CONNECTION SCHEDULE
1 NOZZLE QTY SIZE(mm) RATING FACE TYPE SERVICE REMARKS
2 N1 1 10" 600# RF WN GAS INLET
3 N2 1 01 10" 600# RF WN GAS OUTLET
4 N3 1 4" 300# RF WN HM INLET
5 N4 1 4" 300# RF WN HM OUTLET
6 N5 1 6" 300# RF WN PSE CONNECTION (SIZE ON HOLD)
7 N6 1 6" 300# RF WN PSE CONNECTION 01 (SIZE ON HOLD)
8 N7 1 2" 600# RF LWN SHELL VENT 01
9 N8 1 2" 600# RF LWN SHELL DRAIN 01
10 N9 1 2" 600# RF LWN CHANNEL VENT 01
11 N10 1 2" 600# RF LWN CHANNEL DRAIN 01
12
13 S.N. Dimensions Length(mm)
14 1 "A" 4,200 01
15 2 "B" 500
16 3 "C" 310
17 4 "D" 215
18 5 "E" 300
19 6 "F" 2,500
20 7 "G" 800
21 8 "H" 350
22 9 "I" 350
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
FPSO ALMIRANTE TAMANDARE
CO2 REMOVAL PACKAGE
EQUIPMENT DATA SHEET - CO2 REMOVAL 1ST STAGE PREHEATER

Document No: 001.17056.000028-AK008-00 Area(Module) TS024 Date: 18-May-2021


Tag No.: 772-HEST-0201 No. Req. 1 x 100% By: CCK
Operation: CO2 Removal Package Project FPSO ALMIRANTE TAMANDARE Reviewed: RSO
Services: CO2 Removal 1st Stage Preheater Job No. NG20088 Approved: MAG
Revision: 01 Page: 5 of 5 REV
SHELL-AND-TUBE HEAT EXCHANGER DATA SHEET
NOTES AND HOLDS
1 NOTES:
2 1. Weight information will be updated when detail design is completed. 01
3 2. Heat exchanger shall comply with all the specification listed below. 01
4 - PECEMETS999006, MECHANICAL SHELL AND TUBE HEAT EXCHANGERS SPECIFICATION.
5 - PECEMCPF006008A1 - CORROSION PROTECTION COATINGS DATA SHEETS
6 - PESDPMPF999001A1 - FPSO GENERAL CONDITION DATA SPECIFICATION
7 - PESDPMPF999007A1 - FPSO GENERAL, PACKAGE, EQUIPMENT, BULK AND SERVICES SPECIFICATION
8 - SWSDSWPF999002V1 - FPSO MAIN BRAZILIAN REGULATORY REQUIREMENTS SPECIFICATION
9 - SWSDSWPF999003V1 - FPSO MAIN NR-13 REQUIREMENTS SPECIFICATION
10 3. Material of wetted parts shall meet ISO 15156 / NACE MR0175 Part 1, 2 & 3 requirements.
11 4. Coating of heat exchanger shall comply to PECEMCPF006005. 01

12 5. Heat exchangers shall comply with NR13 - Caldeiras e Vasos de Pressão (Boilers and Pressure Vessels) regulatory standard from Brazilian Labor.
13 6. Heat exchangers shall be certified by BV according to Class rules.
14 7. All pressure containing joints of heat exchangers shall be full radiographed.
15 8. All process nozzle shall be able to withstand the loads as per PESDMETS999009-002, MECHANICAL UNFIRED PRESSURE VESSEL SPECIFICATION table 6.3.7-1.
16 9. Heat exchangers shall be designed for the specifed motion and acceleration as per PESDPMPF999001A1, GENERAL CONDITION & DATA RevA1.
17 10. Pressure retaining parts, load bearing parts and pressure vessel attachments shall be supplied with an EN 10204 3.1 certificate as a minimum. All other parts shall be supplied with
18 01 2.2 certificate.
19 11. Localized stresses and deformations in the vessel wall due to concentrated loads caused by external and/or internal structural attachment, piping reactions, etc. shall be evaluated with
20 WRC 107/297 or FEA methods. The acceptance criteria shall be in accordance with ASME codes.
21 12. Refer to Process Datasheet 001.17056.000028-AK004-00 for information required for thermal design.
22 Heat exchanger shall be designedconsidering the following design cases:
23 - Case 6 - Max Duty Case
24 - Case 11 - Max Flow Case
25 - Case 12 - Min Duty, Min Flow Case
26 13. Full MP or LP on all welded load carrying attachments, like lifting lugs and pipe/platform supports 01 01
27 14. The heat exchanger sketch on page 4 is only a general representative of the equipment. For details, please refer to the latest General Arrangement Drawing.
28 15. Blast load condition is as below.
01
29 - Over pressure : 1 barg
30 - Drag pressure : 0.33barg, duration is on hold. 01

31 16. For the internals detail check drawing number 001.17056.000028-AD003 Detail Drawings - CO2 Membrane 1st Stage Preheater
32 17. 3mm CA except SS316L(UNS S31603) tubes.
33 18. Quantity of nameplates are minimum two(NR13 and Project nameplate). Additional nameplate shall be agreed via submission of detail drawigs. 01
34 19. Design to include 2" vent and drain nozzles on both shell and tube-sides.
35 20. The maximum carbon content of welded components in carbon and carbon manganese steels shall be limited to 0.22%. The maximum carbon equivalent (Ceq) shall be 0.43% based on
36 product analysis and on the formula:
01
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62

You might also like