DC HIGH GROUT 210


General Purpose, High Strength, Non -shrink cementitious grout

subject to approval by DC Technical


DESCRIPTION Services Department.
DC HIGH GROUT 210 is a ready to use product
in powder form, which requires only the on-
PACKAGING
site addition of water to produce a non-shrink
DC HIGH GROUT 210 is supplied in 25 kg
grout of predictable performance.
moisture- resistant plastic bags.

APPLICATIONS
STANDARDS
DC HIGH GROUT 210 is formulated for use at
 Complies with CRD-C 621
any consistency from fluid to damp-pack, and
may be used with confidence for bedding,  ASTM C1107-14
grouting and precision bearing operations such  QCS Section 5 Part 16
as:
 Gas or steam turbines APPLICATION PROCEDURE
 Generators PREPARATION
 Presses The surface onto which the grout is to be
 Crane rails applied should be scabbled to remove laitance
 Milling machines and expose aggregate. Do not use bush
 Precast elements hammers or similar preparation equipment
 Anchor bolts that can crush the aggregate but leave it in
 Suitable for use in bridge bearing place. The surface must be free of oil, dust,
applications dirt, paint, curing compounds, etc. Soak area to
be grouted with water for 24 hours prior to
ADVANTAGES grouting to minimize localized absorption and
 Non-shrink. to assist in the free flow of the grout. Surfaces
should be damp but free of standing water.
 Adjustable consistency.
 Proven and predictable performance. Particular attention should be paid to bolt
 Excellent workability retention even at holes to ensure that these are water-free. Use
high ambient temperatures. oil free compressed air to blow out bolt holes
 High bond strength to steel and concrete. and pockets as necessary.
 Early strength development even at fluid
Base plate, bolts, etc. must be clean and free of
consistency.
oil, grease and paint etc. Set and align
 Good fatigue and impact resistance.
equipment. If shims are to be removed after
 Micro silica content enhances strength and
the grout has set; lightly grease them for easy
durability.
removal.
 Impermeable.
 Can be extended by the addition of 5-13 Ensure formwork is secure and watertight to
mm clean washed aggregate when large prevent movement and leaking during the
volume void filling is required – DC placing and curing of the grout. The area
AGGREGATES supplied in 20 kg bags, should be free of excessive vibration. Shut

Page 1 of 4 TECHNICAL DATA SHEET - DC HIGH GROUT 210


ENHANCES YOUR BUILDING EFFORT

down adjacent machinery until the grout has the grout continuously. Maintain a constant
hardened. hydrostatic head, preferably of at least 15cm.

In hot weather, base plates and foundations On the side where the grout has been poured,
must be shaded from direct sunlight. Bags of allow 10cm clearance between the side of the
grout should be stored in the shade prior to form and the base plate of the machine.
use.
On the opposite side allow 5-10 cm clearance
In cold weather, the temperature of base between the formwork and the base plate.
plates and foundations should be raised to
DC HIGH GROUTS are suitable for use with
>10°C.
most types of pumping equipment.
MIXING DC HIGH GROUT 210 when bulked with
In hot weather use cool water to bring the aggregate as above should be placed and
mixed grout temperature to <30°C. compacted by light rodding and tapping of
In cold weather use warm water to raise the formwork faces only.
mixed grout temperature to >10°C. Mechanical vibration should NOT be utilized.
Damp down the inside of the grout mixer with Immediately after DC HIGH GROUT 210 grout
water prior to mixing the initial batch of DC is placed, cover all exposed grout with clean
HIGH GROUT 210. Ensure the mixer is damp damp hessian, and keep moist until grout is
but free of standing water. Add the pre- firm enough to accept a curing membrane.
measured quantity of water. Slowly add the DC
HIGH GROUT 210, mixing continuously. Mix for Should the grout shoulders require finishing
at least five minutes until a smooth, uniform, work, this should be carried out prior to
lump free consistency is achieved. application of the curing membrane. We
recommend the use of a curing membrane
AGGREGATES BULKING from our DC-CURE range.
When aggregate "bulking" is required addition
rate for the 5-13 mm aggregate should be SHOULDERS
confirmed by site trials. Typically, the addition Due to differences in temperature between
rate would bebetween 10-15 kgs of clean dry the grout under the base plate, and exposed
aggregate per 25 kg bag of DC HIGH GROUT 2. shoulders that are subject to more rapid
temperature changes, debonding and / or
Add the aggregates to the mixing water in the cracking can occur. Avoid shoulders wherever
concrete mixer and then slowly add the DC possible.
HIGH GROUT 210 powder and mix for 5
minutes until a lump free uniform consistency If shoulders are required, they should be firmly
is achieved - Ideally the slump should be 75- anchored with reinforcing to the substrate to
200mm depending upon application prevent debonding.
requirements.
TYPICAL WATER REQUIREMENTS –
PLACING TABLE 1
Lengths of metal strapping laid in the Application Grouting Machinery
formwork prior to placing may be necessary to Consistency Fluid
assist grout flow over large areas and in Flow Cone * 20-30
compacting and eliminating air pockets. Pour Mix Water Minimum 3.5
liters/25 kg Maximum 4

Page 2 of 4 TECHNICAL DATA SHEET - DC HIGH GROUT 210


ENHANCES YOUR BUILDING EFFORT

* ASTM C939 (formerly CRD-C 79) strength, is approximately 22,000 N/mm² at 28


days.
TYPICAL PROPERTIES FATIGUE RESISTANCE
STRENGTH DEVELOPMENT Cube samples, produced with DC HIGH GROUT
The strength of grout is dependent on many 210 and cured for a month, underwent fatigue
factors which include mixing, water addition, tests of 2,000,000 pulsing stresses ranging
curing, temperature and humidity. The table between 20 and 50N/mm² at a frequency of
below gives typical average strengths of DC 500 cycles/min. Tested specimens were
HIGH GROUT 210 at 25°C, when mixed with 3.5 undamaged and their compressive strength
liters (flowable) per 25 kg bag. was higher than that of similar specimens that
were not subjected to fatigue tests.
For compressive strength 50 mm cubes and
flexural strength 40 x 40 x 160 mm prisms were BOND TO CONCRETE
used. Typical direct tensile “pull off” testing indicates
Compressive Flexural a bond to concrete in the region of 2-4 MPA.
Strength Strength
WORKABILITY
Time Flow N/mm² Flow N/mm²
Tests at the fluid consistency performed
1 day 20 4
3 days 35 6 according to ASTM C939, show compliance
7 days 45 8 with the requirements of CRD-C 621-82.
28 days >60 >9
CAPILLARY PORES AND PERMEABILITY
Wet density: approx. 2220 kg/m³
Even under a pressure of 20 atm, water does
BLEED WATER not penetrate DC HIGH GROUT 2 specimens.
No bleed water is apparent (ASTM C-232) at The permeability factor is calculated to be
recommended water addition rates. therefore lower than 1.10-12 cm/sec.

EXPANSION RESISTANCE TO CHEMICAL ATTACK


Tests were made following both ASTM C-827/ Thanks to its water-tightness, DC HIGH GROUT
827M, on the use of expansive cements and 210 is protected against environmental
Corps of Engineers Standard for grout. Tests aggressive agents in solution.
made as prescribed by ASTM C-827/827M
RESISTANCE TO LOW TEMPERATURE
show an expansion value of about 0.05 %. Tests
After 300 freezing and thawing cycles, the
in conformity with Corps of Engineers show an
modulus of elasticity decreases only 5%. This
expansion value of 0.3% that is lower than the
indicates that DC HIGH GROUT 210 is highly
maximum value (0.4%) fixed by the same
resistant to the disrupting action of frost.
standards. Moreover, DC HIGH GROUT 210
expansion occurs both in the plastic and in the
early hardened state. However, the expansion STORAGE
action of DC HIGH GROUT 210 exhausts mainly Store out of direct sunlight, clear of the ground
during the first 12 hours of curing. on pallets protected from rainfall. Avoid
excessive compaction. Storage life is
MODULUS OF ELASTICITY approximately 12 months when stored as
The static modulus of elasticity, measured by above in original sealed bags.
applying a load corresponding to 1/3 of the
Failure to comply with the recommended
storage conditions may result in premature

Page 3 of 4 TECHNICAL DATA SHEET - DC HIGH GROUT 210


ENHANCES YOUR BUILDING EFFORT

deterioration of the product or packaging. For It is essential that a mechanically powered


specific storage advice consult DC's Technical grout mixer is used to obtain the optimum
Services Department. properties

PRECAUTIONS YIELD/CONSUMPTION
The temperature of both the grout and 13.5 liters/25kg bag at 3.5 liters water addition
elements coming into contact with the grout rate. 74 x 25kg bags / m³
should be in the range of +10°C to +35°C. Do
not use water in an amount or at a WARNING
temperature that will produce a consistency As with other products containing Portland
more than fluid or cause mixed grout to bleed cement, the cementitious material in DC HIGH
or segregate. GROUT 2 grout may cause irritation. Avoid
DC HIGH GROUT 210 should be laid at a contact with eyes and prolonged irritation. In
minimum thickness of 25mm and to a case of contact with eyes, immediately flush
maximum depth of 100mm. with plenty of water for at least 15 minutes.
Call a physician. In case of contact with skin,
To simulate on-site conditions, it is necessary wash skin thoroughly.
to restrain cubes for the first 24 hours
immediately after casting. QUALITY AND CARE
DO NOT OVERWORK AND AVOID USING All products originating from DC-Qatar facility
MECHANICAL VIBRATION. are manufactured under a management
system independently certified to conform to
UNDER NO CIRCUMSTANCES SHOULD DC HIGH the requirements of the quality,
GROUT 2 BE RETEMPERED BY THE LATER environmental and occupational health &
ADDITION OF WATER. safety standards ISO 9001.

* Properties listed are based on laboratory-controlled tests.

DCL/QA/v1/06_21
STATEMENT OF RESPONSIBILITY
The technical information and application advice given in this DC publication are based on the present state of our best
scientific and practical knowledge. As the information herein is of a general nature, no assumption can be made as to a
product's suitability for a particular use or application and no warranty as to its accuracy, reliability or completeness either
expressed or implied is given other than those required by law. The user is responsible for checking the suitability of products
for their intended use.

NOTE
Field service where provided does not constitute supervisory responsibility. Suggestions made by DC either orally or in
writing may be followed, modified or rejected by the owner, engineer or contractor since they, and not DC, are responsible
for carrying out procedures appropriate to a specific application.