You are on page 1of 17

ELCINA Electronics Manufacturing Cluster, Bhiwadi

Project Presentation - January 2021

An initiative of members of Electronic Industries Association of India…

ELCINA 1
ELCINA Electronics Manufacturing Cluster, Bhiwadi
… at a Glance
 Name of the Promoter (SPV): ELCINA Electronics Manufacturing Cluster
Private Limited
 Location of EMC: Plot No. SPL-1, IA Salarpur, Bhiwadi,
Rajasthan
 Area of EMC: Total area: 100.70 acres
Area for Phase I: 50.34 acres (Project to
be implemented in 2 phases of 50 acres
each)
 EMC Scheme Assistance: The Grant-in-Aid of Rs. 20.24 Crore from
MeitY, Govt. of India under the EMC
Scheme
 Plotted Area for Units (Phase-I) : 30.62 acres (Industrial Plots : 30)
 Plots Allotted to Units (Phase-I): 28.42 acres (Industrial Plots : 27)
 Estimated Project Cost (Phase-I): Rs. 46.09 Crores (excluding land cost)
 Proposed Investments by Units : Rs. 800 Crores (approx) in Phase- I
Rs. 800 Crores (Estimated) in Phase- II
 Indicative Employment (Phase-I): Direct employment: 5- 6,000
Indirect employment: 10-12,000
© All rights reserved ELCINA Electronics Manufacturing Cluster Pvt Ltd 2
ELCINA Electronics Manufacturing Cluster at Bhiwadi,
Rajasthan - Advantages

Attractive State & Proximity


Connectivity Central Incentives to Supply Chain

Area
100 Acres Western Dedicated 100% Stamp Duty Located in NCR
Phase- I (50 Acres) Freight Corridor (WDFC) exemption on land region– thus ensuring
Phase-II (50 Acres) which connects Dadri registration, Investment easy access to the
LOCATION near Delhi to JNPT Nhava Subsidy & Employment huge domestic
Sheva port, Navi Mumbai Generation Subsidy etc.
• SPL-1, Industrial by the Government of market – Near Delhi
passes through Bhiwadi
Area Salarpur, and runs alongside the Rajasthan under its RIPS- Capital Region
Bhiwadi, Rajasthan 2019 Scheme
Cluster plot. The project
will be completed by Dec (please refer to slide no.– Close proximity to
• 8 Km from NH-48
2021. 8) Manufacturing Hubs/
Delhi-Jaipur
Highway Industrial Areas in
Nearest rail head Attractive Central Govt. Manesar, Bawal,
Distance from Railway 26 km loading/ unloading point Incentives under SPECS
Station (Rewari)
Scheme Neemrana etc.
(ICD) – about 20 kms.
Distance from IGI Airport 63 Km away. (please refer to slide no.–
Distance from Town 5 Km
10)

ELCINA 3
ELCINA Electronics Manufacturing Cluster at Bhiwadi,
Rajasthan - Advantages

Supportive
Easy Availability of Shared Common
Business
Human Services
Environment
Resources
Area
100 Acres
Phase- I (50 Acres) Ample availability of Skill Development Centre
Phase-II (50 Acres)
Rajasthan SWCS - a skilled manpower due to run by Electronic Sectors
single window close proximity to
LOCATION
Skill Council of India
clearance system for Manufacturing Hubs & (ESSCI)- land allotted
• SPL-1, Industrial
the industry. Technical Institutions
Area Salarpur, Centre of Excellence (CoE)
Bhiwadi, Rajasthan
Technical Institutes -
Ease of Doing MSME Technology
Centre, Bhiwadi College Centralised Sewage
• 8 Km from NH-48 Business under
of Polytechnic etc. Treatment Plant (STP),
Delhi-Jaipur Rajasthan MSME
Fire Fighting and Water
Highway Act-2019 Leading companies in the Distribution Systems to
Distance from Railway 26 km
(please refer to slide vicinity are Micromax, reduce capital investment
Station (Rewari) no.– 10) Honda, KEI, Markem
Distance from IGI Airport 63 Km Imaje, Orient Cables, Hostel Facility for
Fiem Lighting, Jaquar Employees (proposed)
Distance from Town 5 Km
Lighting etc.

ELCINA 4
Member Units & Activity Status
S.No. Organisation Product Profile Manufacturing Status
1 Aisan Fiem Automotives India Pvt. Ltd. Electronic Fuel Injection Systems & IC Connectors for Two and Operational since October 2019
Three Wheelers
2 BGSB Concrete Solutions Pvt. Ltd. Servicing of Electronic Parts of Construction Equipment/ Machines Likely to be operational in Apr-
2021
3 Deki Electronics Ltd. Film Capacitors, Electrolytic Capacitors, Ceramic Capacitors Yet to Start
4 Duggar Power Products Pvt. Ltd. Stabilizers, Transformers, Solar Lanterns Yet to Start
5 E-Pack Durables Solutions Pvt Ltd Air Conditioner & its parts Under Construction
6 ESSCI Skill Training in ESDM sector Yet to Start

7 Elin Electronics Ltd. LED lighting, Consumer Appliances Yet to Start


8 Fusion Polymers Industries Low Voltage Cable Yet to Start
9 Jai Kartar Digitech Pvt. Ltd. DVD Players, HDMI Players, Multimedia speakers, LED TV Yet to Start
10 M/s K C Jain Potentiometers, Presets & Switches Yet to Start
11 Kraft Box Packaging Products Yet to Start
12 Masayoshi Control LLP Electronic Components Yet to Start
13 Mercury Heatex Pvt. Ltd. Heat Exchangers for Air Conditioners & Consumer Durables Commenced operation in Q1 ‘21
14 Mrideep Consultants & Agents Parts of Capacitors, Dispensing Machines Yet to Start
15 Motras Scientific Instruments Pvt. Ltd. Scientific Instruments Yet to Start
16 Sahasra Electronics Pvt. Ltd. LED assembly for lighting Yet to Start
17 Sahasra Semiconductors Pvt Ltd Semiconductor ATMP Under Construction
18 Speedofer Components Pvt Ltd Ferrite Core for transformers Yet to Start
19 UKB Electronics Pvt. Ltd. Wires, Cables, Power Cords, Chargers & Adapters Yet to Start
20 Value4tronics LLP Film Capacitors (Power Electronics) Yet to Start

ELCINA 5
Site Master Plan (100 acres)

PHASE- I
Operational
Area: 50.34 Acres

PHASE-II
Proposed
Area: 49.66 Acres

Phase-I
ELCINA 6
Govt. Approvals/NoC
Approval Status

Approval of MASTER PLAN of 50.34 Acres (PHASE –I) Received on 19.12.2017

CGWA NOC for GROUND WATER Extraction (PHASE –I) Received on 24.08.2016

Renewal of CTE from State Pollution Control Board Valid upto 28.02.2022
(PHASE –I & II : Full 100 Acres)

Registration of LEASE-DEED with RIICO (PHASE –I) Executed on 29.11.2018

NoC from FIRE DEPARTMENT (PHASE –I) Received on 10.07.2020

Energisation Certificate from Rajasthan Electricity Dept. (PHASE-I) Received on 16.01.2021

ELCINA 7
RIPS-2019
Financial Benefits to Manufacturing Enterprises
S. No. Particulars Subsidy Exemption

Investment Subsidy of 75% of State


1 Investment tax due and deposited, for seven
years
Reimbursement of 50% of
Employment employer’s contribution towards
2
Generation employees EPF and ESI, for seven
years
3 Electricity Duty 100% for 7 years
100% on purchase / lease/Sub-lease
4 Stamp Duty of land and construction or
improvement on such land
Additional Benefits to Manufacturing Enterprises in Thrust Sectors: ESDM, DMIC Area etc.
5% Interest Subsidy on term loan taken for making an investment in plant
1 Interest Subsidy & machinery, for a period of five years subject to a maximum of Rs 25 Lacs
per year
Capital Subsidy equivalent to 25% of investment on the plant &
2 Capital Subsidy
machinery, subject to a maximum of rupees fifty lakh.

ELCINA 8
Ease of Doing Business under Rajasthan MSME Act 2019

New MSMEs in Rajasthan now require no approvals, no inspections for first 3


years

• As per Rajasthan MSME Act 2019, new MSME's now won't need prior State
government approvals to start operation in the state.

• For availing this benefit, the entrepreneurs will have to register on the web
portal of Raj Udyog Mitra - https://rajudyogmitra.rajasthan.gov.in to express
their intent to set up a new enterprise in Rajasthan through a "Self
Declaration" form.

• The portal will issue an Acknowledgement Certificate upon registration and


based on this certificate the company may start the operation in the plant.

ELCINA 9
Scheme for Promotion of Manufacturing of Electronic Components
and Semiconductors (SPECS) by MeitY (Govt. of India)
The Scheme for Promotion of Manufacturing of Electronic Components and Semiconductors (SPECS) aims to
strengthen the manufacturing ecosystem for electronic components and semiconductors. The scheme will help
to meet domestic demand, increase value addition and promote employment opportunities in this sector.
Incentives of up to INR 3,285 crore available under the Scheme over a period of 8 years

INCENTIVE
Incentive of 25% on Capital Expenditure pertaining to plant, machinery, equipment, associated
utilities and technology, including Research & Development on reimbursement basis

TARGET SEGMENTS
Electronic Components, Semiconductors, Specialized Sub-Assemblies and Capital Goods for these
items

ELIGIBILITY
Applicable to Investments in New Units as well as Expansion of Existing Units

TENURE OF THE SCHEME


SPECS will be open for applications for 3 years. Investments made within 5 years from the date of
acknowledgement will be eligible for receiving incentive
ELCINA 10
Actual Site Pictures

Main Gate House & Security Booth …


Actual Site Pictures
Contd
..

AFI Factory

21 meters Entry Road……


AISAN FIEM AUTOMOTIVES INDIA PVT LTD-FACTORY
Actual Site Pictures
Contd..
M/s Mercury Heatex Pvt. Ltd.

Factory Operational…

M/s BGSB Concrete Solutions


Pvt. Ltd.

factory under construction….


Actual Site Pictures Contd..

Water Storage Tank, Fire Pump House & Sewage Treatment Plant work....
Actual Site Pictures Contd..
GSS Area..

Landscaping &
Horticulture

Electrical Infra & Landscaping….


ELCINA Electronics
Manufacturing Cluster
Bhiwadi

Thank You!

ELCINA