The Default PPAP is Level 3, unless otherwise element specified by the AM General Supplier Quality Representative.
1) Initial submission
2) Engineering Change(s)
4) Correction of Discrepancy
9) Change of ownership
13) For all current and future supplied product, internal PPAP's shall be conducted annually and
made available upon request
Please reference the AM General Supplier Quality Manual for additional information. This can be procured from the AM
General Homepage under the Supply Chain Management, Military Programs section.
Authorized Person
Name
Title
Phone Number
Fax Number
Email
Material Information
Part Name
Part Number
Revision
Drawing Number
Drawing Change Level
Dated (MM/DD/YYYY)
Purchase Order No.
Tool Order No.
Scheduling Agreement
Checking Aid / Test Equip. No.
Change Level / Dated (MM/DD/YYYY)
Weight (kg)
Additional Engineering Changes
Dated (MM/DD/YYYY)
Customer Information
Customer Name / Division
Buyer
Application
Supplier Quality Engineer
Parts Reviewed and Applied Question Answers: Indicate Y, N, or N/A - Inculde Comments for All Red Shaded Answers
Part Number Revision Part Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Comments
1 PART NUMBER REV PART NAME
2
3
4
5
6
7
8
9
10
11
12
13
14
15
-1
ALL PPAP SUBMISSIONS must be submitted electronically to the following email address: submission.data@amgeneral.com
Supplier Name Purchase Order No.
Supplier Code Reason for Request
S/R/O = Submit or Retain or Omit. Level 4 - Element omissions occur only as specified in writing by the AMG SQE Level 4. (Copy of
original document (e-mail or hand written) specifying Levels 1, 2, 4, or 5 must be submitted with Warrant) For all and future supplied
product, internal PPAP's shall be conducted annually and made available upon request.
Submission Level
PPAP Submission Requirements and Detail Description 1 2 3 4 5
0a) Supplier Team Feasibility Commitment - N/A S S S S
0b) PPAP Submissions Requirements as specified by SQE. (This document, e-mail, hand written) N/A S S S S
1) Design Records (Bubble Print all features, notes, and specifications) R S S S/R R
2) Engineering or Supplier Change Request (AMG Process Change Notification) - if applicable R S S S/R R
4) Design Failure Modes Effects Analysis (DFMEA) - supplier design responsible R R S S/R/O R
8) Measurement System Analysis (MSA) - Measurement equipment must be supported with MSA. R R S S/R R
10) Material/ Performance Test Results. PRINT NOTES: Material, Surface Finish, Labeling, Performance,
Paint Process, Coating, Welding Documentation IE WPS/PQRs/Welder Certs, Plating, Heat Treat, etc. R S S S/R R
And all Certificates of Conformance Related to Special Processes.
11) Initial Process Studies - Must be provided for all print, specification, AMG SQE deemed critical
characteristics, and internal supplier deemed critical characteristics. (Additional process studies may be R R S S/R R
requested based upon 6 pc. dimensional layout results standard deviation and distribution.)
12) Qualified Laboratory Documentation. (Internal and or 3rd Party required for all tests conducted.) R R S S/R R
14) PPAP Sample Product- PTR Production Trial Run parts/ upon request prior to production order R S S S/R R
15) Master Sample (Submit/Retain Photo Documentation of PPAP layout part(s) Retain Part. R R R S/R R
17) Records of Compliance with Customer Specific Requirements. If applicable (CQI, Capacity, Etc.) R R S S/R R
Bulk Materials Refer to AIAG PPAP 4th ed. Table 4.1 and Appendix F
PPAP Submission Package is to have each Element Sub-Divided by Element cover sheet. For areas that are not applicable, include
a sheet for the Element with N/A. Example: For non-design responsible suppliers, the element sub-divider would indicate:
"DFMEA N/A" **NOTE-Use ALT+Enter to go to a new line in the box below. Just using the Enter key will exit the box.**
Does this part contain any restricted or reportable substances? Yes No N/A
Are plastic parts identified with appropriate ISO marking codes? Yes No N/A
Level 5 - Warrant with product samples and complete supporting data reviewed at supplier's manufacturing location.
Submission Results
The Results For: dimensional measurements material and functional tests appearance criteria statistical process package
These results meet all design requirements: Yes No (if No- Explanation Required)
Declaration
I affirm that the samples represented by this warrant are representative of our parts which were made by a process that meets all AM General specific requirements,
drawings, specifications and meet all PPAP 4th Edition Requirements. I also certify that documented evidence of such compliance is on file and available for review.
I further affirm these samples are made from specified materials on regular production tooling with no operations other than the regular production process produced
at a rate of pcs/hr. I have clearly written any exceptions from this declaration below.
Explanation / Comments
Title Email
REASON FOR REQUEST **NOTE-Use ALT+Enter to go to a new line in the box below. Just using the Enter key will exit the box.**
Issue
(DIM, APP, Sub-Supplier, Process, Tooling, Capacity, Start-up, …) Action Plan Completion Date
WHERE APPLICABLE, ARE INTERIM ISSUES ADDRESSED ON THE EARLY PRODUCTION PRE-LAUNCH
CONTROL PLAN? (e.g. 100% inspection, rework, temporary operations) Please explain below.
Title Email
DFMEA - (Format for example only; Supplier created templates may be used) Action Results
Occurrence
Occurrence
Detection
Detection
Severity
Severity
Potential Potential
Potential Failure Current Recommended Responsibility & Target
RPN
RPN
Item/Process Step Effect(s) Of Cause(s) Of Action Taken
Mode Controls Action Completion Date
Failure Failure
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Loss of secondary function (vehicle Frequent failures associated with Product verification/validation after design freeze and
2 per thousand
operable, but comfort/convenience 6 similar designs or in design
1 in 500
6 prior to launch with degradation testing (Subsystem or Low 6
Loss or functions inoperable) simulation and testing. system testing after durability test, e.g. function check).
Degradation of
Secondary
Function Product validation (reliability testing, development or
Degradation of secondary function (vehicle Occasional failures associated
.5 per thousand validation tests) prior to design freeze using pass/fail
operable, but comfort/convenience 5 Moderate with similar designs or in design
1 in 2,000
5 testing (e.g. acceptance criteria for performance,
Moderate 5
functions at reduced level of performance) simulation and testing.
function checks, etc.)
Appearance or Audible Noise, vehicle Isolated failures associated with Product validation (reliability testing, development or
.1 per thousand Prior to Design
operable, item does not conform and 4 similar designs or in design
1 in 2,000
4 Freeze
validation tests) prior to design freeze using test to Moderately High 4
noticed by most customers (> 75%). simulation and testing. failure (e.g. until leaks, yields, cracks, etc.)
Legend:
Operation Transportation Inspection Delay Storage
10 Operation
20 Transportation
30 Inspection
40 Delay
50 Storage
PFMEA - (Format for example only; Supplier created templates may be used) Action Results
Occurrence
Occurrence
Detection
Detection
Severity
Severity
Potential Potential Responsibility &
Potential Failure Current Recommended
RPN
RPN
Item/Process Step Effect(s) Of Cause(s) Of Target Completion Action Taken
Mode Controls Action
Failure Failure Date
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Loss or Degradation
of Primary Function
A portion of the production run may Failure Mode detection in-station by operator through
Degradation of primary function (vehicle
Significant have to be scrapped. Deviation from 10 per thousand Problem Detection at visual/tactile/audible means or post-processing through
operable, but at reduced level of
disruption primary process including decreased
7 1 in 100
7 Source use of attribute gauging (go/no go, manual torque
Very Low 7
performance)
line speed or added manpower. check/clicker wrench, etc.)
Appearance or Audible Noise, vehicle 100% of production run may have to be Failure Mode detection post-processing by automated
.1 per thousand Problem Detection
operable, item does not conform and reworked in station before it is 4 1 in 10,000
4 Post Processing
controls that will detect discrepant part and lock part to Moderately High 4
noticed by most customers (> 75%). processed. prevent further processing.
Moderate
disruption
Failure Mode detection in-station by automated
Appearance or Audible Noise, vehicle A portion of the production run may
.01 per thousand Problem Detection at controls that will detect discrepant part and prevent
Annoyance operable, item does not conform and have to be reworked in-station before it 3 1 in 100,000 3 Source automatically lock part in station to prevent further
High 3
noticed by many customers (50%). is processed.
processing.
Low
Appearance or Audible Noise, vehicle
Error Detection Error (Cause) detection in-station by automated
operable, item does not conform and Slight inconvenience to process, ≤ .001 per thousand
noticed by discriminating customers (<
Minor disruption
operation, or operator.
2 1 in 1,000,000
2 and/or Problem controls that will detect error and prevent discrepant Very High 2
Prevention part from being made.
25%).
Supplier Name Supplier Code Other Approval/Date (If Req'd.) Other Approval/Date (If Req'd.)
CHARACTERISTICS METHODS
PROCESS MACHINE,
PART/ SPECIAL
NAME/ DEVICE REACTION
PROCESS CHAR. SAMPLE
OPERATION JIG, TOOLS PLAN
NUMBER CLASS PRODUCT / PROCESS EVALUATION / CONTROL
DESCRIPTION FOR MFG. NO. PRODUCT PROCESS
SPECIFICATION / MEASUREMENT SIZE FREQ. METHOD
TOLERANCE TECHNIQUE
Variable Analysis
Anova Method is only acceptable method.
- Select a minimum of 10 parts.
- Select a minimum of 3 operators.
Results
-Number of distinct categories shall be 5 or greater.
-For Powertrain and like type components Total Gage R&R shall be less than 10%.
-For all other components Total Gage R&R shall be less than 20%.
-Please consult your SQE for any variable results over these limits.
Results
-Kappa coefficient between operators must exceed 0.70, greater than 0.80 preferred.
-Kappa coefficient operator to standard must exceed 0.70, greatet than 0.80 preferred.
PART
APPRAISER A NAME:
1 2 3 4 5 6 7 8 9 10 AVERAGE
TRIAL
1
2
GAGE
GAGE R
R&&R
R SUMMARY
SUMMARY
3 MEASUREMENT UNIT ANALYSIS
XBARp N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A # PARTS
APPRAISER B 0 APPRAISER C
M (FOR EV(K1) = # OF TRIALS)(FOR AV(K2) = # APPR AND G=1)(FOR PV(K3) = # OF PARTS AND G=1)
APPRAISER A
12.000 UCL-R #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! OP1? 0 d2 2 3 4 5 6 7 8 9 10
12.000 12.000
10.000 LCL-R #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
R - OP1
#DIV/0! #DIV/0!
10.000
#DIV/0! #DIV/0! OP2? 0 1 1.410 1.910 2.240 2.480 2.670 2.830 2.960 3.080 3.180
RBARBAR #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
UCL-R #DIV/0! #DIV/0! #DIV/0! #DIV/0! OP3? 0 R 2- OP2 10.000
1.280 1.810 2.150 2.400 2.600 2.770 2.910 3.020 R -3.130
OP3
8.000 8.000 UCL-R UCL-R
XBARBAR #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
LCL-R #DIV/0! #DIV/0! #DIV/0! #DIV/0! # OPER 0 3 8.000
1.230 1.770 2.120 2.380 2.580 2.750 2.890 3.010 3.110
6.000 6.000 #DIV/0! LCL-R LCL-R
UCL-XBAR #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
RBARB #DIV/0! #DIV/0! #DIV/0! # TRIALS (M) 0 4 6.000
1.210 1.750 2.110 2.370 2.570 2.740 2.880 3.000 3.100
4.000 RBARB RBARB
LCL-XBAR #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
AR
#DIV/0! #DIV/0!
4.000 #DIV/0!
#DIV/0! #DIV/0! (G) 0.000 G 5 4.000
1.190 1.740 2.100 2.360 2.560 2.730 2.870 2.990 AR3.100
AR
2.000 2.000 2.000
d2A(EV)= 0.000 d2(EV)= 0.000 6 1.180 1.730 2.090 2.350 2.560 2.730 2.870 2.990 3.100
0.000 0.000d2(PV)= 0.000 d2(AV)= 0.000 0.000
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10
All calculations are based upon predicting 5.15 sigma (99% of the area under the normal distribution curve).
AV - If a negative value is calculated under the square root sign, the appraiser variation (AV) defaults to zero (0).
DATA TABLE
Reference
PART A-1 A-2 A-3 B-1 B-2 B-3 C-1 C-2 C-3 Reference Value Code
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Risk Analysis
A * B Crosstabulation
B
Total
0 1
0 Count 0 0 0
Expected Count
A
1 Count 0 0 0
Expected Count
Count 0 0 0
Total
Expected Count
B * C Crosstabulation
C
Total
0 1
0 Count 0 0 0
Expected Count
B
1 Count 0 0 0
Expected Count
Count 0 0 0
Total
Expected Count
A * C Crosstabulation
C
Total
0 1
0 Count 0 0 0
Expected Count
A
1 Count 0 0 0
Expected Count
Count 0 0 0
Total
Expected Count
Kappa A B C
A -
B -
C -
DETERMINATION
AxB
AxC
BxC
*Traceable to NIST Blanket statements of conformance are unacceptable for any test results.
*Traceable to NIST Blanket statements of conformance are unacceptable for any test results.
*Traceable to NIST Blanket statements of conformance are unacceptable for any test results.
Supplier required to provide marked up drawing to identify all "PRINT NOTES" verified.
Document Painting Method / Industry Standard used to prepare these components.
Method # / Finishing Requirement on Drawing:
Cleaning Standard Utilized:
Pretreat Standard Utilized:
SPECIFICATION / LIMITS GAGE QTY. SUPPLIER TEST RESULTS (DATA)
Characteristic Standard OK NOT OK
MIN MAX TYPE TESTED Piece 1 Piece 2 Piece 3
Prime Coat:
Blast Profile
Thickness*
Thickness (including blast profile)*
Permeability
Adhesion
Oven Cure Time (if used)
Ambient Cure Time (if used)
Salt Spray
Top Coat:
Thickness (over primer)*
Total Thickness (reference)*
Permeability
Adhesion
Ambient Cure Time (if used)
Oven Cure Time (if used)
* Rejection will not be made based on coating thickness in excess of the maximum alone, but on a subsequent performance failure per MIL-DTL 53072 Sec 4.2.3.3.
APPEARANCE EVALUATION
Coating Spec (if Applicable) Attribute Frequency SPECIFICATIONS
Color Match
TopCoat Gloss
Crosshatch Adhesion
Solvent Resistence
Pencil Hardness
Film Thickness (Powder) Refer to Applicable QACs and or Specification on print/PO (Contact Buyer)
Film Thickness (Liquid)
Production Adhesion Test
Orange Peel
Salt Spray Creepage
Edge Coverage
COLOR EVALUATION
Color Lot Part # SPECIFICATIONS
Prime Coat:
Blast Profile*
Oven Cure Time (if used)
Ambient Cure Time (if used)
Salt Spray
Top Coat:
Oven Cure Time (if used)
* Rejection will not be made based on coating thickness in excess of the maximum alone, but on a subsequent performance failure per MIL-DTL 53072 Sec 4.2.3.3.
DATE:
Submit documents with weld sample cut and etch photos (preferred) from each type of weld to
submission.data@amgeneral.com
WPS/PQR PROCEDURE #
I have read and understand all AM General and welding specification requirements of the part number(s) listed
above and have completed a review of the blue prints, welding symbols and specifications listed. Signature below
of the manufacturers representative is our guarantee that parts will be produced as qualified and no changes will
be made to these procedures without prior approval of AM General.
Record Number:
Contents:
Title Sheet
Summary Sheet
Summary Sheet
Record Number:
Joint Reference Material Reference Machine Make Machine Type Machine Size
MATERIAL COMPOSITION
Reference Designation C Mn Si S P Cr Mo
JOB DESCRIPTION:
PART NUMBERS:
PACKAGING INSTRUCTIONS:
Dnslope Time:
Post Heat Time:
Post Heat Time:
Quence Time:
Temper Time:
Temper Heat:
DATE:
Supplier required to provide marked up drawing to identify all "PRINT NOTES" verified.
Document Plating Method / Industry Standard used to prepare these components.
Tolerance (-):
Supplier Nam
Part Number: Characteristic:
PPC Number: Incident: 0 CPK: #DIV/0!
Nominal: 0 Incident Date: 12/30/1899
Tolerance(+) 0 Prepared By: 0
Tolerance(-) 0 Date Completed: PPK: #DIV/0!
1.0000 1.0000
0.8000 0.8000
0.6000 0.6000
0.4000 0.4000
0.2000 0.2000
0.0000 0.0000
1 2 3 4 5 6 1 2 3 4 5 6
Supplier is required to identify all AM General Owned Tools & Fixtures and document with Photo in PPAP workbook