Professional Documents
Culture Documents
Question 01 : Prepare a FAST Diagram for the project that you are currently involved with.
Outline the key functions and discuss in short about the management implication of the same.
Ans:
How Why
63 km
construction
Construction of
Road
3.2 km stretch
express way that
can double up as Cuts travel time
Reduce the Construction of Protect Public
a runway for the between Agra
traveling time Toll Road System Interest
IAF during and Lucknow
between Lucknow
emergency from 6 hours to
and Agra
situations just 3.5 hours
Develop IAF
Runway
Transport and
People & Goods
The FAST is systematic diagramming technique that logically identifies and visually displays the
necessary to accommodate design purpose. The development of a FAST diagram is a creative
thought process which supports communication between team members.
The development of a FAST diagram helps teams to:
Develop a shared understanding of the project
Identify missing functions.
Page 1 of 2
NICMAR
Define, simplify, and clarify the problem.
Organize and understand the relationships between functions.
Identify the basic function of the project, process or product.
Improve communication and consensus.
Stimulate creativity.
The Function Analysis System Technique (FAST) diagram is usually prepared in a workshop
setting and led by someone with experience in preparing FAST diagrams. Input for the diagram
is received from workshop participants.
Page 2 of 2