You are on page 1of 1

BUILDING PERMIT PLANS AND ENGINEERING REQUIREMENTS:

 Structural Analysis (6 Copies,20 Pages/Copy) (Structural Engineer)


 Auto CAD Structural Plan (8 Copies ,13 Pages/Copy)
 Bill of Materials (6 Copies ,30 pages/Copy)
 Electrical Load Analysis (Prof. Electrial Engineer)
 Safety and Health (6 Copies,1 Page/Copy)
 Construction Specification (6 Copies,1 Page,Copy)

 Building Permit Engr's Professional Fees:


 Civil Engineer Sign and Seal (6 Copies, 10 Pages/Copy)
 Master Plumber Sign and Seal (6 Copies, 3 Pages/Copy)
 Prof. Electrical Engineer Sign and Seal (6 Copies , 2 Pages / Copy)
 Govt. Taxes/Fees:

 Zoning Fee
 Zoning Notary Fee
 Fire Permit
 Fire Permit (Other Fees Fixed)
 Barangay Permit
 Purok Clearance
 Cedula
 SPA (Building Permit Processing Consent)
 Tax Declaration Real Property
 Real Property Tax Clearance
 Transfer Certificate of Title (Original)
 Engineers Fees

BUILDING PERMIT:

 1 Structural Plan ( Sign and Sealed by)


o a civil Engineer
o b Professional Electrical Engineer
o c Master Plumber
 2 Structural Analysis (FRom Structural Engineer)
 3 Bill of Materials
 4 Rest is your More Files from Title and Real Property Tax

You might also like