07:00 AM
08:00 AM
09:00 AM
10:00 AM
11:00 AM
00:00 AM
01:00 AM
02:00 AM
03:00 AM
04:00 AM
05:00 AM
06:00 AM
07:00 AM
08:00 AM
09:00 AM
10:00 AM
11:00 AM
00:00 AM
01:00 AM
02:00 AM
03:00 AM
04:00 AM
05:00 AM
06:00 AM
07:00 AM
08:00 AM
09:00 AM
10:00 AM
11:00 AM
00:00 AM
01:00 AM
02:00 AM
03:00 AM
04:00 AM
05:00 AM
06:00 AM
07:00 AM
08:00 AM
09:00 AM
10:00 AM
11:00 AM
00:00 AM
01:00 AM
02:00 AM
03:00 AM
04:00 AM
05:00 AM
06:00 AM
07:00 AM
08:00 AM
09:00 AM
10:00 AM
11:00 AM
00:00 AM
01:00 AM
02:00 AM
03:00 AM
04:00 AM
05:00 AM
06:00 AM
12:00 PM
01:00 PM
02:00 PM
03:00 PM
04:00 PM
05:00 PM
06:00 PM
07:00 PM
08:00 PM
09:00 PM
10:00 PM
11:00 PM
12:00 PM
01:00 PM
02:00 PM
03:00 PM
04:00 PM
05:00 PM
06:00 PM
07:00 PM
08:00 PM
09:00 PM
10:00 PM
11:00 PM
12:00 PM
01:00 PM
02:00 PM
03:00 PM
04:00 PM
05:00 PM
06:00 PM
07:00 PM
08:00 PM
09:00 PM
10:00 PM
11:00 PM
12:00 PM
01:00 PM
02:00 PM
03:00 PM
04:00 PM
05:00 PM
06:00 PM
07:00 PM
08:00 PM
09:00 PM
10:00 PM
11:00 PM
12:00 PM
01:00 PM
02:00 PM
03:00 PM
04:00 PM
05:00 PM
06:00 PM
07:00 PM
08:00 PM
09:00 PM
10:00 PM
11:00 PM
HORAS
MOLIENDA
CAMBIO DE LINERS CHUTE DESCARGA APRON
FEEDER, CAMBIO DE RODILLOS DE CARGA Y
LANCEO
FEEDER L2 FEA0009 RETORNO A CONDICIÓN EN FEEDER CENTRALES,
LEVANTAMIENTO DE OBSERVACIONES FEA10
E&I Instacion de TILTS Switchs
CAMBIO DE LINERS CHUTE DESCARGA APRON FEEDER, CAMBIO
LANCEO DE RODILLOS DE CARGA Y RETORNO A CONDICIÓN EN FEEDER
FEEDER L1 FEA0006 CENTRALES
E&I Instacion de TILTS Switchs
FAJA #7 CAMBIO DE POLINES, RASPADORES, SKIRTING.
FAJA #6 CAMBIO DE POLINES, RASPADORES, SKIRTING.
CAMBIO DE MALLAS DEL TROMMEL
24.NOV ‐ 07:00 AM
CAMBIO DE TRUNNION LINER (PLACA Y LIFTER) 25.NOV ‐ 09:00 AM
INICIO MANTENIMIENTO
LINEA MOLIENDA 2
REFORZAMIENTO DE DEFLECTORES FIN DE TRABAJOS L2
SAG#2 CAMBIO DE LINERS CHUTE DESCARGA GRUESOS Y
CENTRADOR
CAMBIO DE ZARANDA
E&I Insp Elec Slip Ring‐Brushes Ringmotor
CAMBIO DE TROMMEL
CAMBIO DE TRUNNION LINER (PLACA Y LIFTER)
25.NOV ‐ 11:00 AM REFORZAMIENTO DE DEFLECTORES 26.NOV ‐ 08:00 PM
SAG#1 INICIO MANTENIMIENTO FIN DE TRABAJOS L1
CAMBIO DE LINERS CHUTE DESCARGA GRUESOS Y CENTRADOR
LINEA MOLIENDA 1
CAMBIO DE ZARANDA
E&I Insp Elec Slip Ring‐Brushes Ringmotor
CAMBIO DE LINER CHUTE TRANSFERENCIA, CAMBIO
DE LINERS CHUTE DESCARGA Y CANALETA
DESCARGA, MANTENIMIENTO CODO DESCARGA DE
CHIPS, CAMBIO DE SPOOL DESCARGA BOMBAS
L
BOLAS #2 WARMAN
CAMBIO REFUERZOS MLB2, INSTALACIÓN DE
STRAIN GAGE
E&I Insp Elec Slip Ring‐Brushes Ringmotor
CAMBIO DE LINER CHUTE TRANSFERENCIA, CAMBIO DE
LINERS CHUTE DESCARGA Y CANALETA DESCARGA,
MANTENIMIENTO CODO DESCARGA DE CHIPS, CAMBIO DE
BOLAS #1 L SPOOL DESCARGA BOMBAS WARMAN, CAMBIO DE
PORTARODAMIENTO PPS0002
E&I Insp Elec Slip Ring‐Brushes Ringmotor
Cambio RTD en MLB‐001 Trunnion
26 Hrs PARADA POR
MANTENIMIENTO MOLIENDA
LINEA #2
33 Hrs PARADA POR MANTENIMIENTO MOLIENDA
LINEA #1
12 Hrs PARADA
PEBBLES
PEBBLES
MANTTO CHUTE
FAJA #10 TRANSFERENCIA
L CAMBIO DE POLINES Y
Y #11 15.NOV‐ 07:00 AM
BASTIDORES 15.NOV ‐ 07:00 PM
MANTENIMIENTO PLANTA FIN DE TRABAJOS PEBBLES
REPARAC.
CHUTE
PANTALON
CALIBRACION
FAJA #15 L CAMBIO
DE BALANZA
POLINES Y
RASPADORES
, SKIRTING
CAMBIO DE POLINES,
RASPADORES, SKIRTING,
FAJA #18 MANTENIMIENTO CHUTE
DESCARGA
CAMBIO DE POLINES,
CAMBIO DE POLINES, RASPADORES,
RASPADORES, SKIRTING,
FAJA #17 MANTENIMIENTO CHUTE
SKIRTING, MANTENIMIENTO CHUTE
DESCARGA
DESCARGA
FLOTACIÓN
CELDAS DE FLOTACIÓN LINEA MANTTO.CELDAS FLOT. FILAS 1 Y 2
L
#1 Y #2 INSP.‐ CAMBIO COMP. INTERNOS A CONDICION
CELDAS DE FLOTACIÓN LINEA MANT.CELDAS FLOT. FILAS 3 Y 4
L
#3 Y #4 INSP.‐ CAMBIO COMP. INTERNOS A CONDICION
ESPESADORES Y FILTROS
INSPECCION RASTRAS, COLUMNA CENTRAL & BLADES
DESCARGA LIMPIEZA LLENADO Y FORMACION DE CAMA
ESPESADOR RELAVES 026 CAMBIO ‐ REGULACION DE PADS
12 HRAS 12 HRAS 24 HRAS
INSP. SIST TRANSMISION, LUBRICACION
CAMBIO DE
VALVULA PINCH DE 12" MANGA
FILTROS VÁLV. PINCH
12"