Label Elevation

(m)

J-1 118.9
J-2 128.0
J-3 129.5
J-4 131.1
J-5 137.2
J-6 135.6
J-7 128.0
J-8 126.5
J-9 128.0
J-10 128.0

ID Label
30 J-1
31 J-2
32 J-3
33 J-4
34 J-5
35 J-6
36 J-7
37 J-8
38 J-9
39 J-10
Demand Hydraulic Pressure (mm Pressure (mm H2O)
(L/s) Grade (m) H2O)
ANTES DESPUÉS
7.6 169.2 50,201 50,201 50,390
4.7 167.83 39,753 39,753 39,948
2.2 167.75 38,169 38,169 38,341
3.2 167.69 36,517 36,517 36,673
0.0 167.65 30,390 30,390 30,520
9.8 167.63 31,968 31,968 32,129
4.1 167.87 39,794 39,794 39,990
0.0 168.15 41,568 41,568 41,764
3.5 167.96 39,877 39,877 40,096
1.3 167.89 39,813 39,813 40,023

Elevation (Demand (L/s)Hydraulic GradPressure (mm H2O)


118.9 6.1 169.39 50,390
128 3.8 168.03 39,948
129.5 1.8 167.92 38,341
131.1 2.6 167.85 36,673
137.2 0 167.78 30,520
135.6 7.8 167.79 32,129
128 3.3 168.07 39,990
126.5 0 168.35 41,764
128 2.8 168.18 40,096
128 1 168.1 40,023
Label Start Node Stop Node Length (User Diameter Material
Defined) (m) (mm)
SUCTION CRYSTAL LAKE PMP-1 7.6 610 Galvanized iron
DISCHARGE PMP-1 J-1 67.1 533 Galvanized iron
P-1 J-1 J-2 381 152 Galvanized iron
P-2 J-2 J-3 254.5 152 Galvanized iron
P-3 J-3 J-4 167.6 203 Galvanized iron
P-4 J-4 J-2 307.8 152 Galvanized iron
P-5 J-4 J-5 129.5 203 Galvanized iron
P-6 J-5 SOUTH TANK 301.8 203 Galvanized iron
P-7 J-5 J-6 640.1 203 Galvanized iron
P-8 J-6 EAST TANK 170.7 152 Galvanized iron
P-9 J-3 J-6 227.1 203 Galvanized iron
P-10 J-6 J-7 335.3 254 Galvanized iron
P-11 J-3 J-8 405.4 203 Galvanized iron
P-12 J-8 J-1 271.3 254 Galvanized iron
P-13 J-8 J-7 251.5 254 Galvanized iron
P-14 J-7 J-10 137.2 152 Galvanized iron
P-15 J-10 J-9 210.3 152 Galvanized iron
P-16 J-9 J-8 152.4 152 Galvanized iron
Minor
Hazen- Has Headloss Has User
Loss Flow (L/s) Velocity
Williams Check Gradient Defined
Coefficien (m/s)
C Valve? (m/m) Length?
t (Local)
130 0 0 56.6 0.19 0 1
130 0 0 56.6 0.25 0 1
120 0 0 11.3 0.62 0.004 1
120 0 0 3.2 0.17 0 1
110 0 0 6.1 0.19 0 1
110 0 0 -3.4 0.19 0 1
120 0 0 6.3 0.2 0 1
125 0 0 4.8 0.15 0 1
100 0 0 1.5 0.05 0 1
100 0 0 15.4 0.85 0.009 1
100 0 0 6.9 0.21 0.001 1
110 0 0 -16.8 0.33 0.001 1
120 0 0 -12.1 0.37 0.001 1
100 0 0 -37.8 0.75 0.004 1
100 0 0 19.2 0.38 0.001 1
100 0 0 -1.7 0.09 0 1
120 0 0 -3 0.16 0 1
120 0 0 -6.5 0.36 0.001 1
Elevation (Base) Elevation Elevation (Initial) Elevation
Label
(m) (Minimum) (m) (m) (Maximum) (m)
SOUTH TANK 0 163.1 167.6 173.7
EAST TANK 0 160 166.1 172.2
Volume
Diameter Flow (Out Hydraulic
(Inactive)
(m) net) (L/s) Grade (m)
(ML)
0 15.0 -4.8 167.6
0 10.9 -15.4 166.1
Label Elevation Flow (Out Hydraulic
(m) net) (L/s) Grade (m)
CRYSTAL LAKE 97.5 56.6 97.5
Hydraulic Hydraulic
Flow
Elevation Pump Status Grade Grade Pump
Label (Total)
(m) Definition (Initial) (Suction) (Discharg Head (m)
(L/s)
(m) e) (m)
PMP-1 100 BOMBA On 97.5 169.21 56.6 71.71
EAST TANK - CONTROL SOUTH TANK -
Time CON CONTROL CON Time
(hours) ALMACENAMIENTO - ALMACENAMIENTO - (hours)
Hydraulic Grade (m) Hydraulic Grade (m)
0 166.1 167.6 0
1 166.73 167.8 1
2 167.27 168.01 2
3 167.75 168.23 3
4 168.16 168.45 4
5 168.51 168.67 5
6 168.82 168.89 6
7 168.95 168.95 7
8 169.02 169.02 8
9 169.09 169.09 9
10 169.15 169.15 10
11 169.2 169.2 11
12 169.25 169.25 12
13 169.39 169.38 13
14 169.51 169.49 14
15 169.61 169.6 15
16 169.7 169.69 16
17 169.79 169.78 17
18 169.86 169.86 18
19 169.98 169.97 19
20 170.08 170.06 20
21 170.16 170.15 21
22 170.24 170.24 22
23 170.31 170.31 23
24 170.37 170.37 24

Time
(hours)

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
INGRESO DE DATOS Y CÁLC

J-2 - CONTROL CON J-1 - CONTROL CON J-9 - CONTROL CON J-8 - CONTROL CON
ALMACENAMIENTO ALMACENAMIENTO ALMACENAMIENTO ALMACENAMIENTO
- Hydraulic Grade - Hydraulic Grade - Hydraulic Grade - Hydraulic Grade
(m) (m) (m) (m)
168.03 169.39 168.18 168.35
168.24 169.54 168.39 168.55
168.46 169.69 168.6 168.76
168.67 169.84 168.81 168.96
168.88 169.98 169.01 169.16
169.08 170.12 169.21 169.34
168.97 169.94 169.04 169.21
169.04 169.99 169.11 169.27
169.1 170.04 169.17 169.33
169.16 170.08 169.23 169.39
169.22 170.11 169.28 169.44
169.27 170.15 169.33 169.48
169.42 170.3 169.5 169.64
169.53 170.37 169.6 169.74
169.62 170.43 169.69 169.82
169.71 170.49 169.78 169.91
169.8 170.55 169.86 169.98
169.87 170.6 169.93 170.05
169.99 170.7 170.05 170.17
170.08 170.76 170.14 170.25
170.17 170.82 170.22 170.33
170.24 170.87 170.29 170.4
170.31 170.91 170.36 170.46
170.37 170.95 170.42 170.51
170.47 171.04 170.52 170.61

J-3 - CONTROL CON J-6 - CONTROL CON J-5 - CONTROL CON J-4 - CONTROL CON
ALMACENAMIENTO ALMACENAMIENTO ALMACENAMIENTO ALMACENAMIENTO
- Hydraulic Grade - Hydraulic Grade - Hydraulic Grade - Hydraulic Grade
(m) (m) (m) (m)
167.92 167.79 167.78 167.85
168.14 168.04 168 168.07
168.37 168.28 168.23 168.3
168.59 168.52 168.46 168.52
168.81 168.75 168.68 168.74
169.02 168.97 168.9 168.95
168.95 168.91 168.91 168.92
169.02 168.98 168.97 168.98
169.08 169.05 169.04 169.05
169.14 169.11 169.11 169.11
169.2 169.17 169.17 169.17
169.25 169.22 169.22 169.22
169.39 169.35 169.33 169.35
169.5 169.46 169.44 169.46
169.6 169.57 169.55 169.56
169.69 169.66 169.65 169.66
169.77 169.74 169.73 169.74
169.85 169.82 169.81 169.82
169.97 169.94 169.92 169.93
170.06 170.03 170.02 170.03
170.15 170.12 170.11 170.12
170.22 170.2 170.19 170.2
170.29 170.27 170.26 170.27
170.36 170.34 170.33 170.34
170.45 170.43 170.42 170.43
INGRESO DE DATOS Y CÁLCULOS

Time PMP-1 - CONTROL CON


(hours) ALMACENAMIENTO - Flow (Total) (L/s)
0 55.0
1 53.6
2 52.2
3 50.7
4 49.3
5 47.8
6 49.7
7 49.2
8 48.7
9 48.3
10 47.9
11 47.5
12 45.9
13 45.0
14 44.3
15 43.6
16 42.9
17 42.3
18 41.0
19 40.2
20 39.4
21 38.7
22 38.1
23 37.5

24 36.2
DATOS
Q (m3/s) 120 0.12
β (horas) 8 0.33
T (°C) 20
C (fierro) 120

DIÁMETRO ECONÓMICO

𝐷=𝐾√𝑄

K 1.2 Asumido
D (m) 0.416

𝐷=√(4&𝛽)×𝐾√𝑄
D (m) 0.32 Valor corregido, fórmula empírica de Marquardt
D (pulg) 12.44
12 0.30
14 0.36
𝑉=4𝑄/(𝜋𝐷^2 )
Velocidad

V (m/s) 1.64 Tubería de impulsión

V (m/s) 1.21 Tubería de succión

Altura dinámica de elevación 62 m


Selección de la Bomba

P 7.5 HP
5.6 Kw

Tiempo de parada

Hm 62 m
L 1500 m
Hm/L 0.04
C 1
K 1
T 5.06 seg

Celeridad (a)
K 0.5
D 0.30
e 0.001
a 698.81

Longitud crítica Lc

Lc 1766.58

Comparando L con Lc

L<Lc Impulsión corta

2*L/a 4.29

T>2*L/a Cierre lento

Michaud ΔH 99.47 m