EQUIPMENT NUMBER E-2215A /B P-EDMS DOCUMENT NO. : KS-CPP-EXE-MMHE-202-PRO-PID-1343
EQUIPMENT NAME REGENERATION GAS COOLER CONTRACTOR DOCUMENT NO. : 077711-1100-PID-0021-1343
SIZE (IDxL) (mm) HOLD x HOLD
A DUTY (kW) 1. SAMPLING CONNECTION TO BE INSTALLED AT 5 OR 7 O'CLOCK ORIENTATION. A
7800
SHELL TUBE 2. ADEQUATE PIPE SUPPORT FOR TWO-PHASE FLOW AND INTERMITTENT SLUG.
DESIGN PRESS. (MAX/MIN) (barg) 96.0 45.0
DESIGN TEMP. (MAX/MIN) (°C) 315 150
OPERATING PRESS. (IN/OUT) (barg) 75.0/- 5.0/-
OPERATING TEMP. (IN/OUT) (°C) 140.0/50.0 35.0/55.0
MATERIAL KCS WITH SS LINING (SHELL) / DUPLEX (TUBE)
HOLD 1 TO HP FLARE
1:200
-VH22XXX-1C615KA-N 100565 VH
B KSCPP-B-1848 B

TUBE RUPTURE TUBE RUPTURE


HOLDS:

1:200

1:200
SET @ 45.0 barg (HOLD) SET @ 45.0 barg (HOLD)
SIZE : HOLD 1 SIZE : HOLD 1
1. PSV SIZE AND INLET/OUTLET LINE SIZE.
22 22
PSV PSV 2. CONTROL VALVE SIZE AND ITS BYPASS LINE SIZE.
3. HEAT EXCHANGER TYPE AND CONFIGURATION.
MIN. MIN.
4. INSULATION REQUIREMENT ON PIPING AND EQUIPMENT TO BE FINALIZED.
1C615KA 1C615KA
3C605KA 3C605KA
C ILO ILO 1C615KA C
FB FB 3C605KA
NC

600 mm
22-SP

MIN.
ILC
ILO 20 FB
20 FB
V NC 50
FROM VALVE SKID SPENT V NC ILC
REGEN GAS RETURN NC FB
HEADER DRAIN POT ILO
50-PG22XXX-9S609KA-N FB
110737 KSCPP-B-1319
D D

FROM REGENERATION
GAS BLOWERS, K-2211A/B
200-PG22538-9S601KA-N HOLD 1
100736 KSCPP-B-1345 50-CWR22903-3C605KA-N MIN. SIS

22
N 9S601KA TG TYPE
H 9S609KA 22
E SDV E
TO COOLING
MIN. (HOLD) mm

MEDIUM RETURN
250-CWR22902-3C605KA-N 250-CWR22XXX-1C605KA-N 110327 CWR
KSCPP-B-1881
FROM REGENERATION GAS
CROSS EXCHANGERS N NC
MIN.

25
E-2213A/B H 3C605KA 1C605KA
300-PG22523-9S609KA-H D
100733 KSCPP-B-1341

F V V F

RS
RS
NC NC

N4 N1 N6 N8
E-2215A
-VT22XXX-3C605KA-N H
-VT22XXX-9S609KA-H
N7 N9 N2 N3

G G
NC NC
D D

22 H 22 H
PDIA PDIA

V V

NC NC
H H

N7 N5 N1 N4
CAD PRODUCED DRAWING - NO MANUAL REVISION ALLOWED
E-2215B
-VT227401-3C605KA-N H
-VT227400-9S609KA-H
N3 N2 N6 N8

NC NC
RS

RS

I 22 H YongKai, Teh KeongYih JagjitKaur I


TICA
HarnekSingh
D D
2019.11.06 Seck
NG NYA YAU
2019.11.06
2019.11.06 18:05:46 +08'00' 18:06:38 21:43:38 2019.11.07
+08'00' +08'00' 10:18:22 +08'00'

A ISSUED FOR REVIEW 06.11.19 NNY TYK/SKY JK


TO MERCURY ADSORBENT
BED FEED GAS PREHEATER, DRAWN CHECKED APPROVED APPROVED
E-2301 REV DESCRIPTION DATE
300-PG22525-9S609KA-H
KSCPP-B-1361 110152 CONTRACTOR PCSB
TWO-PHASE FLOW
NOTE 2 CONTRACT NO. CHO/2018/DKS/1001 CHECKED TYK/SKY

JOB NO. DATE 06.11.19


250-CWR22901-3C605KA-N

J DRAWN BY NNY APPROVED JK J


22 HH
PZA DATE 06.11.19 DATE 06.11.19
NOTE 1
22-SP SCALE N.T.S CONTRACTOR PCSB
PROJECT TITLE:
22
TCV
22
TI PROVISION OF ENGINEERING, PROCUREMENT,
FROM COOLING
MEDIUM SUPPLY
SC CONSTRUCTION, INSTALLATION & COMMISSIONING (EPCIC) OF
110326 CWS 250-CWS22XXX-1C605KA-N
KASAWARI GAS DEVELOPMENT PROJECT
DRAWING TITLE:

K
KSCPP-B-1881
HOLD 2 PIPING AND INSTRUMENTATION DIAGRAM K
25 NC 25 NC
SYSTEM 22
D D
200 HOLD 2 REGENERATION GAS COOLER
NC
CONTRACTOR: CONSULTANT: CAD FILE NAME :
1C605KA 3C605KA
05-KSCPP-B-1343-1of1-A.pdf
AREA: LOCATION:
L L
TO HAZARDOUS
OPEN DRAIN
05 KSCPP
1:100

1:100
50-DH22XXX-1N105KA-N 110727 DH DISCIPLINE DRAWING NO. SHEET NO. REVISION NO
KSCPP-B-1871 THE ORIGINAL AND ALL COPIES OF THE DRAWING TOGETHER WITH
THE COPYRIGHT THEREOF ARE THE SOLE PROPERTY OF PCSB
B 1343 1OF1 A