NOTES
P-EDMS DOCUMENT NO. : KS-CPP-EXE-MMHE-503-PRO-PID-1906
CONTRACTOR DOCUMENT NO. : 077711-1000-DW-1931-0004
B
A 1. REFER DELUGE NOZZLE ARRANGEMENT KS-GEN-EXE-MMHE-503-HSE-RPT-0008 FOR BASIS OF NOZZLE QUANTITY A
AND ARRANGEMENT.
2. PIPING TO CONFIRM ACTUAL DELUGE ROUTING.
3. TAPPING TO EACH EQUIPMENT TO BE TAKEN FROM TOP OF PIPE, 12 O'CLOCK POSITION.
4. PIPING ROUTING/ISOMETRIC TO ENSURE SYMMETRY OF PIPING TO AVOID UNEQUAL DISTRIBUTION.
5. BLIND FLANGE FOR FUTURE EQUIPMENT.

B NOZZLE TYPE
B B
MEDIUM VELOCITY, K = 32

FUTURE NOZZLES

C C
INLET PIG RECEIVER INLET PIG RECEIVER INLET PIG RECEIVER
R-2903 R-2902 R-2901
(FUTURE) (FUTURE) (FUTURE)
40-FW53235-1P701-N
50-FW53234-1P701-N

CONDENSATE EXPORT PUMP 50-FW53249-1P701-N NOTE 5


NOTE 5
P-3301 A
NOTE 5

80-FW53246-1P701-N

80-FW53245-1P701-N

80-FW53247-1P701-N
40-FW53236-1P701-N
D EXPORT PIG LAUNCER D
L-2901
CONDENSATE EXPORT PUMP
P-3301 B

FROM DELUGE VALVE 250-FW53203-1P701-N

100-FW53261-1P701-N
(FIRE ZONE 8 & 9)
150
110488 KSCPP-B-1904
NO POCKET

DN40 DN40
E E
40-FW53230-1P701-N

40 40

80 80

DIESEL DISTRIBUTION PUMP


P-6702 A/B DN40 DN40
80-FW53263-1P701-N
50 50
80-FW53262-1P701-N
200-FW53229-1P701-N

F DN50 50-FW53259-1P701-N DN40 DN40 F

DN80
CHEMICAL INJECTION PACKAGE CONDENSATE COALESCER

80-FW53258-1P701-N
A-6820 S-3002 A

DN80
40-FW53241-1P701-N DN50
(FUTURE) CONDENSATE FILTER CONDENSATE FILTER
50-FW53260-1P701-N S-3001B S-3001A
NOTE 5 CONDENSATE BOOSTER PUMP
P-3001 A CONDESATE/WATER SEPARATOR
V-3001 CONDENSATE COALESCER
100-FW53252-1P701-N
50-FW53256-1P701-N

80-FW53240-1P701-N
80-FW53253-1P701-N

40-FW53254-1P701-N 40-FW53242-1P701-N S-3002 B


G G

DIESEL TRANSFER PUMP CONDENSATE BOOSTER PUMP


P-6701 A/B P-3001 B

150 100

80-FW53251-1P701-N
TO BRIDGE WATER DELUGE
DN50 DN40 50-FW53250-1P701-N 80-FW53248-1P701-N
111278 KSBL1-B-1201
50-FW53257-1P701-N
150-FW53243-1P701-N

H 40-FW53238-1P701-N H
DIESEL FILTER/COALESCER
80-FW53237-1P701-N

DN50 DN40 PACKAGE DN50


A-6710
LP FLARE KO/CLOSED CAD PRODUCED DRAWING - NO MANUAL REVISION ALLOWED
DRAIN PUMP DN40
DN100

P-6202 A CONDENSATE METERING SKID


DN50 A-3210
DN50
40-FW53239-1P701-N
REGENERATION GAS
SEPARATOR
V-2212 Hansraj Rahul Chanda Kumar
JagjitKaur
HarnekSingh

LP FLARE KO/CLOSED
WanNorAzianFaizan WanNik
Singh
2020.06.12 17:39:44 +08'00'
2020.06.12 16:55:07 +08'00' 2020.06.12

I DRAIN PUMP
18:46:36 +08'00'
I
DN50 B ISSUED FOR APPROVAL 12.06.20 HR/NAR WNAF JK
DN100

P-6202 B
A ISSUED FOR REVIEW 08.11.19 BER/NAR WNAF JK

DRAWN CHECKED APPROVED APPROVED


DN50 REV DESCRIPTION DATE
CONTRACTOR PCSB

CONTRACT NO. CHO/2018/DKS/1001 CHECKED WNAF


INLET SEPARATOR DN100 JOB NO. DATE 08.11.19
V-2001
J DRAWN BY BER/NAR APPROVED JK J
DATE 08.11.19 DATE 08.11.19
CELLAR DECK
SCALE N.T.S CONTRACTOR PCSB
PROJECT TITLE:

40-FW53264-1P701-N PROVISION OF ENGINEERING, PROCUREMENT,


CONSTRUCTION, INSTALLATION & COMMISSIONING (EPCIC) OF
KASAWARI GAS DEVELOPMENT PROJECT
DRAWING TITLE:

K
40-FW53266-1P701-N
PIPING AND INSTRUMENTATION DIAGRAM K
SYSTEM 53
40-FW53265-1P701-N

LP FLARE KO/CLOSED DRAIN BOOSTER PUMP


P-6203 A FIXED FIREWATER SYSTEM - DELUGE DISTRIBUTION CELLAR
40-FW53267-1P701-N
DECK / SUMP DECK
CONTRACTOR: CONSULTANT: CAD FILE NAME :

LP FLARE KO/CLOSED DRAIN BOOSTER PUMP 05-KSCPP-B-1906-1of1-B.pid


P-6203 B
AREA: LOCATION:
L L
SUMP DECK 05 KSCPP
DISCIPLINE DRAWING NO. SHEET NO. REVISION NO
THE ORIGINAL AND ALL COPIES OF THE DRAWING TOGETHER WITH
THE COPYRIGHT THEREOF ARE THE SOLE PROPERTY OF PCSB
B 1906 1 OF 1 B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like