Load Details
Included Loads
Fy
(kN)
Fx Fz Mx Mz
NODE NO. Downwards is
(kN) (kN) (kNm) (kNm)
negative Upwards is
positive
file:///D:/Shreejay%20Projects/Staad%20Projects/Elevated%20Circular%20Water%20Tan... 4/21/2021
Mat Foundation Design Page 2 of 12
Fy
(kN)
Fx Fz Mx Mz
NODE NO. Downwards is
(kN) (kN) (kNm) (kNm)
negative Upwards is
positive
Fy
(kN)
Fx Fz Mx Mz
NODE NO. Downwards is
(kN) (kN) (kNm) (kNm)
negative Upwards is
positive
Fy
(kN)
Fx Fz Mx Mz
NODE NO. Downwards is
(kN) (kN) (kNm) (kNm)
negative Upwards is
positive
Load Combinations
file:///D:/Shreejay%20Projects/Staad%20Projects/Elevated%20Circular%20Water%20Tan... 4/21/2021
Mat Foundation Design Page 3 of 12
file:///D:/Shreejay%20Projects/Staad%20Projects/Elevated%20Circular%20Water%20Tan... 4/21/2021
Mat Foundation Design Page 4 of 12
file:///D:/Shreejay%20Projects/Staad%20Projects/Elevated%20Circular%20Water%20Tan... 4/21/2021
Mat Foundation Design Page 5 of 12
file:///D:/Shreejay%20Projects/Staad%20Projects/Elevated%20Circular%20Water%20Tan... 4/21/2021
Mat Foundation Design Page 6 of 12
Thickness
Region Material Unit Weight
(m)
Outer 0.50 Concrete 24.00 kN/m3
Soil Details
Mat Geometry
file:///D:/Shreejay%20Projects/Staad%20Projects/Elevated%20Circular%20Water%20Tan... 4/21/2021
Mat Foundation Design Page 7 of 12
Analysis Results
Rx Ry Rz
- Node Number Load Case Dx(mm) Dy(mm) Dz(mm)
(Rad) (Rad) (Rad)
file:///D:/Shreejay%20Projects/Staad%20Projects/Elevated%20Circular%20Water%20Tan... 4/21/2021
Mat Foundation Design Page 8 of 12
Max SQX 145 2011 442.71 58.86 0.00 0.00 0.00 65.09 88.11 2.06
Max SQY 565 2011 86.19 459.79 0.00 0.00 0.00 91.77 66.96 0.44
Max SX 1 5 19.03 -87.80 0.00 0.00 0.00 14.59 21.74 -0.20
Max SY 1 5 19.03 -87.80 0.00 0.00 0.00 14.59 21.74 -0.20
Max SXY 1 5 19.03 -87.80 0.00 0.00 0.00 14.59 21.74 -0.20
Max MX 203 2011 -764.78 -619.79 0.00 0.00 0.00 186.31 107.87 14.65
Max MY 197 2011 -272.85 -969.76 0.00 0.00 0.00 110.16 189.60 -6.08
Max MXY 350 2011 -291.65 4.30 0.00 0.00 0.00 84.95 62.48 32.71
Min SQX 564 2011 -914.30 -690.94 0.00 0.00 0.00 152.87 133.71 28.52
Min SQY 197 2011 -272.85 -969.76 0.00 0.00 0.00 110.16 189.60 -6.08
Min SX 1 5 19.03 -87.80 0.00 0.00 0.00 14.59 21.74 -0.20
Min SY 1 5 19.03 -87.80 0.00 0.00 0.00 14.59 21.74 -0.20
Min SXY 1 5 19.03 -87.80 0.00 0.00 0.00 14.59 21.74 -0.20
Min MX 141 8 7.80 -19.97 0.00 0.00 0.00 -1.46 4.35 0.08
Min MY 190 8 -13.14 -4.19 0.00 0.00 0.00 3.96 -1.28 1.01
Min MXY 116 2011 -801.62 -126.44 0.00 0.00 0.00 149.39 114.25 -33.13
Base Pressure
- Node X-Coor(m) Y-Coor(m) Z-Coor(m) Load Case
(kN/m2)
Maximum Base
79 -1.54 0.00 1.69 1003 142.54
Pressure
Minimum Base
396 3.40 0.00 -2.95 8 9.85
Pressure
Load Case Area in Contact(m2) % of Total Area Area out of Contact(m2) % of Total Area
5 56.17 100.00 0.00 0.00
6 56.17 100.00 0.00 0.00
7 56.17 100.00 0.00 0.00
8 56.17 100.00 0.00 0.00
1001 56.17 100.00 0.00 0.00
1002 56.17 100.00 0.00 0.00
1003 56.17 100.00 0.00 0.00
1004 56.17 100.00 0.00 0.00
1005 56.17 100.00 0.00 0.00
1006 56.17 100.00 0.00 0.00
1008 56.17 100.00 0.00 0.00
1010 56.17 100.00 0.00 0.00
1011 56.17 100.00 0.00 0.00
1012 56.17 100.00 0.00 0.00
1013 56.17 100.00 0.00 0.00
1014 56.17 100.00 0.00 0.00
1016 56.17 100.00 0.00 0.00
1018 56.17 100.00 0.00 0.00
1019 56.17 100.00 0.00 0.00
1020 56.17 100.00 0.00 0.00
1021 56.17 100.00 0.00 0.00
1022 56.17 100.00 0.00 0.00
1024 56.17 100.00 0.00 0.00
1026 56.17 100.00 0.00 0.00
2001 56.17 100.00 0.00 0.00
2002 56.17 100.00 0.00 0.00
2011 56.17 100.00 0.00 0.00
2012 56.17 100.00 0.00 0.00
2014 56.17 100.00 0.00 0.00
2019 56.17 100.00 0.00 0.00
2020 56.17 100.00 0.00 0.00
file:///D:/Shreejay%20Projects/Staad%20Projects/Elevated%20Circular%20Water%20Tan... 4/21/2021
Mat Foundation Design Page 9 of 12
Sliding Check
Overturning Check
Distance to Distance to
Critical Critical Overturning Overturning Resisting Resisting FOS(x) FOS(z)
Load Case
Location Location Moment, Mx Moment, Mz Moment, Rx Moment, Rz (About X (About Z
No
Along X Along Z (kNm) (kNm) (kNm) (kNm) Direction) Direction)
(m) (m)
5 4.50 4.50 0.00 -0.00 22461.73 22477.86 N/A 736978875.19
6 4.50 -4.48 -0.00 -0.00 3543.16 3558.51 N/A N/A
7 -4.49 4.50 0.00 0.00 -26341.71 -26291.57 578938734.73 273870579.74
8 -4.49 4.50 7.50 7.50 -7396.69 -7378.93 986.38 984.01
1001 4.50 4.50 0.00 -0.00 22461.73 22477.86 N/A 736978875.19
1002 4.50 4.50 0.00 -0.00 22985.00 23001.45 N/A 676513167.10
1003 -4.49 4.50 7.50 7.50 -26827.75 -26774.38 3577.59 3570.50
1004 4.50 4.50 0.00 -0.00 22461.73 22477.86 N/A 736978875.19
1005 4.50 -4.48 -7.50 -7.50 15486.84 15552.54 2065.24 2073.99
1006 4.50 4.50 0.00 -0.00 22461.73 22477.86 N/A 736978875.19
1008 4.50 4.50 0.00 -0.00 22461.73 22477.86 N/A 736978875.19
1010 4.50 4.50 0.00 -0.00 22461.73 22477.86 N/A 736978875.19
1011 -4.49 4.50 6.00 6.00 -26373.16 -26321.09 4396.21 4387.56
1012 4.50 4.50 0.00 -0.00 22880.35 22896.73 N/A 687589470.70
1013 4.50 -4.48 -6.00 -6.00 17284.91 17356.47 2881.27 2893.18
1014 4.50 4.50 0.00 -0.00 22880.35 22896.73 N/A 687589470.70
1016 4.50 4.50 0.00 -0.00 22880.35 22896.73 N/A 687589470.70
1018 4.50 4.50 0.00 -0.00 22880.35 22896.73 N/A 687589470.70
1019 -4.49 4.50 7.50 7.50 -24581.58 -24532.51 3278.05 3271.53
1020 4.50 4.50 0.00 -0.00 20215.56 20230.08 N/A 736978875.19
1021 4.50 -4.48 -7.50 -7.50 13247.77 13304.75 1766.65 1774.24
1022 4.50 4.50 0.00 -0.00 20215.56 20230.08 N/A 736978875.19
1024 4.50 4.50 0.00 -0.00 20215.56 20230.08 N/A 736978875.19
1026 4.50 4.50 0.00 -0.00 20215.56 20230.08 N/A 736978875.19
file:///D:/Shreejay%20Projects/Staad%20Projects/Elevated%20Circular%20Water%20Tan... 4/21/2021
Mat Foundation Design Page 10 of 12
Column No. Load Case Service Stress (kN/m) Corner 1 (kN/m) Corner 2 (kN/m) Corner 3 (kN/m) Corner 4 (kN/m) Design Status
2 2002 1118.03 -341.26 -340.18 -340.18 -341.26 Pass
3 2002 1118.03 -341.49 -340.72 -339.96 -340.72 Pass
4 2002 1118.03 -341.27 -341.27 -340.18 -340.19 Pass
5 2011 1118.03 -349.84 -352.26 -353.71 -351.29 Pass
6 2011 1118.03 -399.45 -402.27 -404.37 -401.56 Pass
7 2011 1118.03 -419.29 -421.96 -424.63 -421.96 Pass
8 2011 1118.03 -399.47 -401.57 -404.38 -402.28 Pass
9 2011 1118.03 -349.83 -351.29 -353.70 -352.25 Pass
Design Parameters
Min Max
Top Bottom Pedestal Pedestal Min Max Wood and
Panel f 'c Pedestal Bar Bar
fy (kN/m2) Cover Cover Min Bar Max Bar Spacing Spacing Armer
Name (kN/m2) Cover(m) Size Size
(m) (m) Size (mm) Size (mm) (mm) (mm) Moment
(mm) (mm)
Outer 415000.00 25000.00 0.07 0.07 0.00 10 25 10 57 75.00 500.00 Not Used
Design Output
Zone = 1
Factor
= 0.85
Effective Depth =
= 0.43 (m)
Steel Required
Reinforcement Details
Bar No = 16
Maximum Spacing(Smax)(User
= 500.00 (mm)
Specified)
Minimum Spacing(Smin)(User
= 75.00 (mm)
Specified)
---------------------------------------
Zone = 1
file:///D:/Shreejay%20Projects/Staad%20Projects/Elevated%20Circular%20Water%20Tan... 4/21/2021
Mat Foundation Design Page 11 of 12
Steel Required
Reinforcement Details
Bar No = 16
---------------------------------------
Zone = 1
Steel Required
Reinforcement Details
Bar No = 16
---------------------------------------
Zone = 1
Steel Required
file:///D:/Shreejay%20Projects/Staad%20Projects/Elevated%20Circular%20Water%20Tan... 4/21/2021
Mat Foundation Design Page 12 of 12
Reinforcement Details
Bar No = 16
---------------------------------------