Professional Documents
Culture Documents
Issue the raw material to the production plants as per their indent
2. Please don’t supply the raw material without indent
3. Raw material (RM) and Packing material (PM) registers/bin cards should be up to
date
4. Manpower should be utilized properly, supply of RM & PM to the plants and
unloading of inward RM & PM should be completed in working hours
5. RM & PM to be stacked properly along with the Tags
6. RM and PM daily stock statement to be submitted to the undersigned
Mr. M. Varaprasad
Works Manager