You are on page 1of 4

CONSOLIDATED PM REPORT OF PHASE 7 SMPS ELEMENTS FOR THE PERIOD OF 11th May 2021 TO 10th

Sr.No Phase details Lot details SSA P.Key


1 Ph 7 Lot 2-X Coimbatore 7798
2 Ph 7 Lot 2-X Coimbatore 7799
3 Ph 7 Lot 2-X Coimbatore 7808
4 Ph 7 Lot 2-X Coimbatore 7828
5 Ph 7 Lot 2-X Coimbatore 7831
6 Ph 7 Lot 2-X Coimbatore 7833
7 Ph 7 Lot-1-X Coimbatore 6475
8 Ph 7 Lot-1-X Coimbatore 6478
9 Ph 7 Lot-1-X Coimbatore 6480
10 Ph 7 Lot-1-X Coimbatore 7307
11 Ph 7 Lot-1-X Coimbatore 7310
12 Ph 7 Lot-1-X Coimbatore 7316
13 Ph 7 Lot-1-X Coimbatore 7339
14 Ph 7 Lot-1-X Coimbatore 7806
15 Ph 7 Lot-1-X Coimbatore 7827
16 Ph 7 Lot-1-X Coimbatore 7829
MENTS FOR THE PERIOD OF 11th May 2021 TO 10th Nov 2021

Site Name PM Done Date Remarks


Anaikatti
Alamaram Bus Stand (Marudhamalai Rd)
Kavundampalayam Hosuring Unit
Venkatesa Colony
A Chettipalayam
Ishwarya Nagar
Hindustan College of Engg and Tech
Karpagam College of Engg
Shivaji Colony
Park College of Engg and Tech
Tamilnadu College of Engg
Mahraja Engg College
Vellimalaipattinam
Govt. College of Tech
Kalikkanaickenpalayam
Nehru Inst of Tech and Management
CONSOLIDATED PM REPORT OF PHASE 7 SMPS ELEMENTS FOR THE PERIOD OF 17th May 2021 TO 16th Nov

Sr.No Phase details Lot details SSA P.Key


1 Ph 7 Lot-3-Y Coimbatore 7303
2 Ph 7 Lot-3-Y Coimbatore 7805
3 Ph 7 Lot-3-Y Coimbatore 7822
4 Ph 7 Lot-3-Y Coimbatore 7824
5 Ph 7 Lot-3-Y Coimbatore 7305
6 Ph 7 Lot-3-Y Coimbatore 8234
7 SMPS ELEMENTS FOR THE PERIOD OF 17th May 2021 TO 16th Nov 2021

Site Name PM Done Date Remarks


VLB Janaki Ammal Engg College
Daksha Apts_Thondamuthur
Vasudeva Textiles
VOC Street, Madukkarai
Amrita
RVS Educational Institute, Sulur (Replace_2899)

You might also like