AWARDED SOLAR PROJECTS as of September 30, 2015

POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Currimao Solar Power Under Development Stage (FIT System). For issuance of show-cause
LUZON I Ilocos Norte Currimao Mirae Asia Energy Corporation 20.00
Project letter due to non-posting of Performance Bond.

Pasuquin East Solar Power Motion for reconsideration and DOC (FIT System) is under evaluation.
Pasuquin, Burgos Energy Logics Philippines, Inc. 50.00
Project For issuance of reminder letter due to non compliance with RESHERR.

Burgos Solar Power Project Energy Development Under Commercial Stage (FIT System). Compliant with all work and
Burgos 4.10
Phase I Corporation financial obligations.

Burgos Solar Power Project Energy Development


DOC for Additional Investment (FIT System) is on process. 2.66
Phase 2 Corporation

Ilocos Norte Phase I Solar For issuance of Termination Letter due to non-compliance with
Paoay Del Sol Energy Primera, Inc. 40.00
Power Project Milestone Approach and RESHERR.

Ilocos Norte Phase II Solar For issuance of Termination Letter due to non-compliance with
Del Sol Energy Primera, Inc. 40.00
Power Project Milestone Approach and RESHERR.

For issuance of Termination Letter due to non-compliance with


Paoay II Solar Power Project Del Sol Energy Segunda, Inc. 40.00
Milestone Approach and RESHERR.

Paoay III Solar Power For issuance of Termination Letter due to non-compliance with
Del Sol Energy Tercera, Inc. 40.00
Project Milestone Approach and RESHERR.

AVGarcia Power Systems For issuance of Termination Letter due to non-posting of Performance
Pangasinan Manaoag Pugaro Solar Power Project 2.00
Corp. Bond and non-compliance with Milestone Approach and RESHERR.

GreEnergy Power Systems For issuance of Termination Letter due to expiration of the SESC and
II Cagayan Aparri Aparri Solar Power Project 105.00
Philippines, Inc. non compliance with the Performance Bond, DOC, and RESHERR.

Pampanga Solar Power Under Commercial Stage (FIT System). For issuance of reminder letter
III Pampanga Mexico RASLAG Corp. 10.00
Project relative to its compliance with RESHERR.

Pampanga Solar Power Confirmed DOC (FIT System). For issuance of reminder letter relative
RASLAG Corp. 13.14
Project Phase II to its compliance with RESHERR.

Under Development Stage (FIT System). Amendment of DOC (FIT


Enfinity Philippines System) was approved. For issuance of show-cause letter due to
Mabalacat Clark Solar Power Project 24.55
Renewable Resources Inc. delayed implementation of 5-Year Work Plan, and non-compliance
with RESHERR.

Hermosa Solar Power DOC (FIT System) is under evaluation. For issuance of reminder letter
Bataan Hermosa YH Green Energy Incorporated 14.50
Project due to non compliance with RESHERR.
AWARDED SOLAR PROJECTS as of September 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
SPARC Solar Powered Agri-
DOC (FIT System) is under evaluation. For issuance of reminder letter
LUZON III Bataan Morong Morong Solar Power Project Rural Communities 5.00
due to non compliance with RESHERR.
Corporation

Next Generation Power Compliant with Milestone Approach. For issuance of reminder letter
Mariveles Bataan Solar Power Project 20.00
Technology Corp. due to non compliance with RESHERR.

nv vogt Philippines Solar Compliance with Milestone Approach is on-going. For issuance of
Bataan I Solar Power Project 55.00
Energy Four, Inc. reminder letter due to non compliance with RESHERR.
Compliant with Milestone Approach. For issuance of show-cause letter
Orani Bataan Solar Power Project BWST, Inc. due to delayed implementation of its Work Program and non- 150.00
compliance with RESHERR.
SPARC Solar Powered Agri-
San Rafael Solar Power DOC (FIT System) is under evaluation. For issuance of reminder letter
Bulacan San Rafael Rural Communities 5.00
Project due to non compliance with RESHERR.
Corporation

Bulacan 3 Solar Power Cleantech Global Renewables, DOC (FIT System) is under evaluation. For issuance of reminder letter
San Ildefonso 45.00
Project Inc. due to non compliance with RESHERR.

SPARC Solar Powered Agri-


DOC (FIT System) is under evaluation. For issuance of reminder letter
Zambales Palauig Palauig Solar Power Project Rural Communities 5.00
due to non compliance with RESHERR.
Corporation
DOC under evaluation. Compliance with Milestone Approach is on-
Solar Power Utilities
Botolan Botolan Solar Power Project going. For issuance of reminder letter due to non compliance with 40.00
Generator Corporation
RESHERR.

Cabanatuan Solar Power First Cabanatuan Renewable Under Development Stage (FIT System). For issuance of reminder letter
Nueva Ecija Cabanatuan City 10.06
Project Ventures, Inc. due to non compliance with RESHERR.

Approved DOC (Fit System). For issuance of reminder letter due to non
Bataan Morong -Hermosa Sta. Rita Solar Power Project Jobin-Sqm Inc. 100.44
compliance with RESHERR.

Concepcion Solar Power Enfinity Philippines Under Development Stage (FIT System). For issuance of reminder
Tarlac Concepcion 50.55
Project Renewable Resources Inc. letter due to non compliance with RESHERR.

nv vogt Philippines Solar Compliance with Milestone Approach is on-going. For issuance of
Tarlac City Tarlac Solar Power Project 55.00
Energy Three, Inc. reminder letter due to non compliance with RESHERR.

DOC (FIT System) is under evaluation. Approved Assignment/Transfer


PetroSolar Corporation to PetroSolar Corporation. For issuance of reminder letter due to non 50.00
compliance with RESHERR.
AWARDED SOLAR PROJECTS as of September 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Rosario and Cavite Economic Zone Solar Under Commercial Stage (FIT System). For issuance of reminder letter
LUZON IV-A Cavite Majestics Energy Corporation 41.30
General Trias Power Project due to non compliance with RESHERR.

Effectivity of the SESC was reinstated and shall be valid until 05


G.A. Philkor Multi Energy
Naic Sabang Solar Power Project December 2015. For issuance of reminder letter due to non 50.00
Corp.
compliance with RESHERR.

Under Development Stage (FIT System). For issuance of show-cause


Noveleta, Rosario, Enfinity Philippines
Cavite Solar Power Project letter due to delayed implementation of 5-Year Work Plan and non- 3.00
Gen. Trias, Tanza Renewable Resources Inc.
compliance with RESHERR.

Dasmariñas Solar Power Solar Philippines Commercial For issuance of Termination Letter due to non-posting of Performance
Dasmariñas 0.80
Project Rooftop Projects, Inc. Bond and non-compliance with Milestone Approach and RESHERR.

Under Development Stage (FIT System). For issuance of show-cause


Macabud Solar Power ATN Philippines Solar Energy
Rizal Rodriguez letter due to non-posting of Performance Bond and non-compliance 30.00
Project Group, Inc.
with RESHERR.

Canlubang Solar Power Transnational Renewable For issuance of Termination Letter due to denied Motion for
Laguna Calamba 0.206
Project Energy Corporation Reconsideration and non-compliance with RESHERR.

DOC (PSA with Central Mall Binan) is on process. For issuance of show-
Central Mall Biñan Solar Solar Philippines Commercial
Binan cause letter due to non-posting of Performance Bond and non- 0.70
Power Project Rooftop Projects, Inc.
compliance with RESHERR.

Cabuyao Solar Power Solar Philippines Commercial For issuance of Termination Letter due to non-posting of Performance
Cabuyao 16.00
Project Rooftop Projects, Inc. Bond and non-compliance with Milestone Approach and RESHERR.

Solar Power Utilities Compliance with Milestone Approach is on-going. For issuance of
Luisiana Luisiana Solar Power Project 30.00
Generator Corporation reminder letter due to non compliance with RESHERR.

FPIP Batangas Solar Power For issuance of show-cause letter due non-posting of Performance
Batangas Sto. Tomas First Gen Visayas Energy Inc.
Project Bond and non-compliance with RESHERR.

Candelaria Solar Power Solar Power Utilities Compliance with Milestone Approach is on-going. For issuance of
Quezon Candelaria 50.00
Project Generator Corporation reminder letter due to non compliance with RESHERR.

Under Development Stage (FIT System) and approved


Calatagan Solar Power Solar Philippines Calatagan
Batangas Calatagan Assignment/Transfer to Solar Philippines Calatagan Corporation. For 12.91
Project Phase I Corporation
issuance of reminder letter due to non compliance with RESHERR.
AWARDED SOLAR PROJECTS as of September 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

DOC (FIT System) is under evaluation. For issuance of reminder letter


LUZON IV-A Batangas Lian Lian Solar Power Project Absolut Distillers, Inc. 2.00
due to non compliance with RESHERR.

Batangas Solar Power For issuance of show cause letter due non-posting of Performance
Balayan EarthEnergy Corp. 30.00
Project Bond and non-compliance with RESHERR.

Palawan Solar Power Sabang Renewable Energy For issuance of show-cause letter due to non-posting of Performance
IV-B Palawan Puerto Princesa
Project Corp. Bond and non-compliance with Milestone Approach and RESHERR.

For issuance of Termination Letter due to non-posting of Performance


Phil. Solar Farm-Palawan, Inc. 10.00
Bond and non-compliance with Milestone Approach and RESHERR.

Request for suspension of its obligation is under evaluation. For


SolarPacific Energy
El Nido Island El Nido Solar Power Project issuance of Termination Letter due to non-posting of Performance 3.00
Corporation
Bond and non-compliance with Milestone Approach and RESHERR.

SM North Solar Power Solar Philippines Commercial Under Commercial Stage (FIT System). For issuance of reminder letter
NCR Metro Manila Quezon City 1.50
Project Rooftop Projects, Inc. due to non compliance with RESHERR.

For issuance of Termination Letter due to non-payment of Signature


Quezon City 1 Solar Power Solar Philippines Commercial
Metro Manila Quezon City Bonus, non-posting of Performance Bond, and non-compliance with 1.20
Project Rooftop Projects, Inc.
Milestone Approach and RESHERR.

Pasay City Solar Power Solar Philippines Commercial Compliance with Milestone Approach is on-going. For issuance of
Pasay City 3.20
Project Rooftop Projects, Inc. reminder letter due to non compliance with RESHERR.

For issuance of Termination Letter due to non-compliance with


V Camarines Sur Pili Pili Solar Power Project Emerging Power Inc. 12.00
Milestone Approach and RESHERR.

Catanduanes Solar Power Local Government Unit of DOC (PPA with FICELCO) is under evaluation. For issuance of reminder
Catanduanes Caramoran 1.00
Project Caramoran letter due to non compliance with RESHERR.

Living Projects 4 People Compliance with Milestone Approach is on-going. For issuance of
II Isabela Ilagan Isabela Solar Power Project 100.00
Philippines Inc. reminder letter due to non compliance with RESHERR.

LUZON Sum 1,338.92 56.90

Helios Solar Energy Corp.


Negros Under Development Stage (FIT System). For issuance of reminder letter
VISAYAS VI Cadiz City Cadiz Solar Power Project (formerly Phil-Power Solar 132.50
Occidental due to non compliance with RESHERR.
Energy Corp.)
San Carlos Solar Power
Under Commercial Stage (FIT System). For issuance of reminder letter
San Carlos City Project Phase I-A and I-B San Carlos Solar Energy Inc. 22.00
due to non compliance with RESHERR.
(SACASOL I-A&I-B)
AWARDED SOLAR PROJECTS as of September 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
San Carlos Solar Power
Negros Under Commercial Stage (FIT System). For issuance of reminder letter
VISAYAS VI San Carlos City Project Phase I-C and I-D San Carlos Solar Energy Inc. 23.00
Occidental due to non compliance with RESHERR.
(SACASOL I-C&I-D)

La Carlota Solar Power Under Development Stage (FIT System). For issuance of reminder letter
La Carlota City San Carlos Solar Energy Inc. 18.00
Project (SACASOL II-A) due to non compliance with RESHERR.

For issuance of Termination letter due to non-submission of additional


Energy Development
Bago Bago Solar Power Project requirements relative to its DOC and non compliance with Milestone 0.00
Corporation
Approach and RESHERR.

Manapla and Manapla Solar Power DOC (FIT System) is under evaluation. For issuance of reminder letter
Negros Island Solar Power Inc. 48.00
Cadiz Project (SACASOL III) due to non compliance with RESHERR.

Bais City Solar Power Project DOC (FIT System) is under evaluation. For issuance of reminder letter
Bais City Monte Solar Energy Inc. 25.00
(SACASOL IV) due to non compliance with RESHERR.

Energy Development Compliance with Milestone Approach is on-going. For issuance of


Murcia Murcia Solar Power Project
Corporation reminder letter due to non compliance with RESHERR.

DOC (FIT System) and Assignment to VictoriaSolar Energy Corp. are


Negros Occidental Solar
Victorias City SunAsia Energy Inc. under evaluation. For issuance of reminder letter due to non 60.00
Power Project
compliance with RESHERR.

SACASOL II-B Solar Power DOC (FIT System) is under evaluation. For issuance of reminder letter
La Carlota City Negros Island Solar Power Inc. 14.00
Project due to non compliance with RESHERR.

Request for Assignment/transfer to Silay Solar Power, Inc. is under


Silay City Solar Power
Silay City Megawatt Clean Energy, Inc. evaluation. Compliance with Milestone Approach is on-going. For 33.00
Project
issuance of reminder letter due to non compliance with RESHERR.

SACASUN Solar Power DOC is under evaluation. For issuance of reminder letter due to non
San Carlos City San Carlos Sun Power Inc. 50.00
Project compliance with RESHERR.

Bacolod City Solar Power Compliance with Milestone Approach is on-going. For issuance of
Bacolod City Negros PH Solar Inc. 200.00
Project II reminder letter due non-compliance with RESHERR.

Under Development Stage (FIT System). For issuance of show-cause


letter due to non-posting of Performance Bond, delayed
Iloilo Miag-ao Miag-ao Solar Power Project Cosmo Solar Energy, Inc. 5.67
implementation of its 5-Year Work Plan, and non-compliance with
RESHERR.

Tigbauan Solar Power Solexar Energy International, DOC (FIT System) is under evaluation. For issuance of reminder letter
Iloilo Tigbauan 30.20
Project Inc. due to non compliance with RESHERR.
AWARDED SOLAR PROJECTS as of September 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Roxas City Solar Power Solar Philippines Commercial Compliance with Milestone Approach is on-going. For issuance of
VISAYAS VI Capiz Roxas City 0.70
Project Rooftop Projects, Inc. reminder letter due to non compliance with RESHERR.

Daanbantayan Solar Power Ceko Solar Farm Systems Compliance with Milestone Approach is on-going. For issuance of
VII Cebu DaanBantayan 25.00
Project Corporation reminder letter due to non compliance with RESHERR.
Assignment to First Toledo Solar Energy Corp. is on process while
awaiting submission of lacking documents relative to its DOC (Fit
Toledo Toledo Solar Power Project SunAsia Energy Inc. 60.00
System). For issuance of reminder letter due to non compliance with
RESHERR.

Energy Development Compliance with Milestone Approach is on-going. For issuance of


Bogo Bogo Solar Power Project 0.00
Corporation reminder letter due to non compliance with RESHERR.

Request for reconsideration of its compliance under milestone


approach. For issuance of Termination Letter due to non-posting of
VIII Leyte Ormoc Leyte Solar Power Project II Phil. Solar Farm-Leyte, Inc. 30.00
Performance Bond and non-compliance with Milestone Approach and
RESHERR.

Under Commercial Stage (FIT System). Compliant with all work and
Ormoc Solar Power Project Phil. Solar Farm-Leyte, Inc. 30.00
financial obligations.

Request for Contract Area Amendment is on process. DOC is under


Tacloban, Santa Sulu Electric Power and Light
Palo Solar Power Project evaluation. For issuance of reminder letter due to non compliance with 50.00
Fe and Palo (Phils.), Inc.
RESHERR.

Under Development Stage (FIT System). For issuance of reminder letter


Biliran Biliran Biliran Solar Power Project E & P Green Energy, Inc. 25.00
due to non compliance with RESHERR.

VISAYAS Sum 807.07 75.00

DOE requested for additional requirement for its compliance with


Zamboanga del La Libertad and Zamboanga del Norte Solar Astronergy Development
MINDANAO IX Milestone Approach. For issuance of reminder letter due to non
Norte Dapitan Power Project Dipolog Inc.
compliance with RESHERR.

Under Development Stage (PSA with CEPALCO - ERC approved


Misamis Kirahon Solar Energy Php8.75). Partial assignment to its Kirahon Two Energy Corp. is under
X Villanueva Kirahon Solar Power Project 12.50
Oriental Corporation evaluation. For issuance of reminder letter due to non compliance with
RESHERR.
Under Development Stage (FIT System). For issuance of reminder letter
Bukidnon Kibawe Kibawe Solar Power Project Asian Greenenergy Corp. 10.49
due to non compliance with RESHERR.

Request for assignment to Liberty Solar Energy Corporation is on


Misamis Laguindingan Solar Power Cagayan Electric Power &
Laguindingan process. For issuance of reminder letter due to non compliance with 20.00
Oriental Project Light Company, Inc.
RESHERR.
AWARDED SOLAR PROJECTS as of September 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Misamis The Ark Green Dynamic DOC (FIT System) is under evaluation. For issuance of reminder letter
MINDANAO X Claveria Claveria Solar Power Project 60.00
Oriental Resources Corp. due to non compliance with RESHERR.

DOE requested for additional requirement for its compliance with


Misamis Oriental Solar Astronergy Development
Balingasag Milestone Approach. For issuance of reminder letter due to non
Power Project Mindanao, Inc.
compliance with RESHERR.

Expired SESC. For issuance of reminder letter to settle all its Financial
XI Davao del Sur Sta. Cruz Darong Solar Power Project PhilNewEnergy, Inc. 35.00
Obligations (i.e. Training Assistance and Development Assistance).

Davao Oriental Solar Power Sun Option for Livelihood On-going pre-development activities. For issuance of reminder letter
Davao Oriental Mati City 0.00
Project Alternative Resources Inc. relative to its compliance with RESHERR.

Enfinity Philippines Under Development Stage (FIT System). For issuance of show-cause
Digos Solar Power Project
Davao del Sur Digos City Renewable Resources Fourth, letter due to delayed implementation of its 5-Year Work Plan and non- 10.00
Phase I
Inc. compliance with RESHERR.

Enfinity Philippines
Digos Solar Power Project Under Development Stage (FIT System). For issuance of reminder letter
Renewable Resources Fourth, 19.58
Phase II due to non compliance with RESHERR.
Inc.

For issuance of Termination Letter due to non-payment of Signature


Midsayap Solar Power
North Cotabato Midsayap SunAsia Energy Inc. Bonus, non-posting of Performance Bond, and non-compliance with 2.50
Project
Milestone Approach and RESHERR.

Under Development Stage (PPA with SOCOTECO I - ERC Approved


Centrala Solar Power nv vogt Philippines Solar Php7.95). DOC (FIT System) is under evaluation. For issuance of show-
XII South Cotabato Surallah 6.25
Project Energy One, Inc. cause letter due to non-posting of Performance Bond, delayed
implementation of its 5-Year Work Plan, and Non-Compliance with

General Santos General Santos City 1 Solar Enfinity Philippines For issuance of Termination Letter due to non-posting of Performance
10.00
City Power Project Renewable Resources Inc. Bond and non-compliance with Milestone Approach and RESHERR.

DOE requested for additional requirements for its request for partial
South Cotabato Solar Power Astronergy Development assignment to Astronergy Development F1 Inc. and Astronergy
Project GenSan Inc. Development F2 Inc.. For issuance of reminder letter relative to its
compliance with RESHERR.
Request for Contract Area Amendment is on process. Under
GenSan Solar Power Project
Del Sol Energy CGS, Inc. Development Stage (FIT System). For issuance of reminder letter due 48.00
Phase I
to non compliance with RESHERR.

GenSan Solar Power Project Under Development Stage (FIT System). For issuance of reminder letter
Del Sol Energy CGS, Inc. 48.00
Phase II due to non compliance with RESHERR.
AWARDED SOLAR PROJECTS as of September 30, 2015
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Request for suspension of its obligation is under evaluation. For
SolarPacific Energy
MINDANAO XII Sarangani Alabel Alabel Solar Power Project issuance of Termination Letter due to non-posting of Performance 15.00
Corporation
Bond and non-compliance with Milestone Approach and RESHERR.

President Roxas President Roxas Solar Power Energy Development Compliance with Milestone Approach is on-going. For issuance of
North Cotabato
and Magpet Project Corporation reminder letter due to non compliance with RESHERR.

On-going pre-development activities. With correction of the location as


Kilada-Matalam Solar Power Energy Development
Matalam per SESC. For issuance of reminder letter due to non compliance with 0.00
Project Corporation
RESHERR.

For issuance of Termination Letter due to non-payment of Signature


Kabacan Solar Power
Kabacan Solarus Partners Inc. Bonus, non-posting of Performance Bond, and non-compliance with 14.50
Project
Milestone Approach

Compliance with Milestone Approach is on-going. For issuance of


Sarangani Alabel Alabel Solar Power Project El Elyon Power Plant Phils. Inc. 40.00
reminder letter due to non-compliance with RESHERR.

Agusan del Butuan City 1 Solar Power Enfinity Philippines For issuance of Termination Letter due to non-compliance with
XIII Butuan City 10.00
Norte Project Renewable Resources Inc. Milestone Approach and RESHERR.

Tagoloan II, DOC (FIT System) is under evaluation. For issuance of show-cause
Local Government Unit of the
ARMM Lanao del Sur Saguiaran & ICOM Solar Power Project letter due to non-posting of Performance Bond and non-compliance 35.00
Islamic City of Marawi
Marawi City with RESHERR.

Bukidnon Solar Power For issuance of Termination Letter due to non-posting of Performance
X Bukidnon Sumilao SunAsia Energy Inc. 2.00
Project Bond and non-compliance with Milestone Approach and RESHERR.

MINDANAO Sum 398.82

Grand Total 2,544.81 131.90