Republic of the Philippines

Department of Public Works and Highways


OFFICE OF THE DISTRICT ENGINEER
Negros Occidental 4th District Engineering Office
Bago City, Negros Occidental
Tel Nos. (034)4611-250

Contract ID No.: 20GN0059


Contract Name: Preventive Maintenance of Road: Asphalt Overlay – along Jct. Murcia –
Cansilayan – Damsite – Abuanan – Bago City Road (S00168NR), K0025+(-
013) – K0027+200, K0027+494 – K0027+891, K0027+891 – K0030+000,
K0033+754 – K0034+259
Contract Location: Bago City, Negros Occidental
____________________________________________________________________________

BAC RESOLUTION AMENDING CONTRACT NAME, BRIEF DESCRIPTION, BILL OF QUANTITIES


(BOQ) AND CONTRACT DURATION OF THE PROJECT WITH CONTRACT ID NO. 20GN0059 DUE TO
THE FINAL REVISION OF PROGRAM OF WORKS.

BAC RESOLUTION NO. B16 – 01 – 2020

WHEREAS, the Bids and Awards Committee, Department of Public Works and Highways Negros
Occidental 4th District Engineering Office, Bago City, advertised/posted the Invitation To Bid for the project
with Contract ID No. 20GN0059 in the DPWH website and PhilGEPS on March 6-12, 2020;

WHEREAS, as scheduled in the Invitation To Bid, the submission and opening of bids will be on March
25, 2020 at 10:00 AM and after the receipt of bids, respectively;

WHEREAS, due to final revision of Plans, it is necessary to amend the Contract Name, Brief
Description, Bill of Quantities (BOQ) and Contract Duration of the project with Contract ID No. 20GN0059,
which is described as follows;

1. CONTRACT ID NO. 20GN0059:

A) CONTRACT NAME:

FROM TO
Preventive Maintenance of Road: Asphalt Preventive Maintenance of Road: Asphalt
Overlay – along Jct. Murcia – Cansilayan Overlay – along Jct. Murcia – Cansilayan
– Dampsite – Abuanan – Bago City Road – Damsite – Abuanan – Bago City Road
(S00168NR), K0025+(-013) – (S00168NR), K0025+(-013) –
K0027+200, K0027+494 – K0027+891, K0027+200, K0027+494 – K0027+891,
K0027+891 – K0030+000, K0033+754 – K0027+891 – K0030+000, K0033+754 –
K0034+389 K0034+259

B) BRIEF DESCRIPTION:

FROM TO
Asphalt Overlay (50mm with correction) Asphalt Overlay (50mm with correction)
with a Total Physical Target of 4.965 lane with a Total Physical Target of 9.670 lane
km, width of 6.1m. Reconstruction to km, width of 6.1 m. Reconstruction to
Concrete Pavement with a Total Physical Concrete Pavement with a Total Physical
Target of 0.397 lane km, width of 6.10 m & Target of 0.794 lane km, width of 6.10 m &
thickness of 300mm. thickness of 300mm.

bac resolution no. b16 – 01– 2020 of contract id no. 20gn0059 page 1 of 3
C) BILL OF QUANTITIES:

Current Provision of BDs (including Amended Provision of BDs under this


Previous Amendments) Supplemental Bulletin
CONTRACT ID NO. 20GN0059 CONTRACT ID NO. 20GN0059
A. Correction of BILL OF QUANTIES in Section A. Correction of BILL OF QUANTIES in Section
X: X:
FROM TO
Pay Item Pay
Description Unit Quantity Description Unit Quantity
No. Item No.
CW1 – ASPHALT OVERLAY CW1 – ASPHALT OVERLAY
PART B OTHER GENERAL REQUIREMENTS PART B OTHER GENERAL REQUIREMENTS
B.5 Project Billboard/Sign each 2.00 B.5 Project Billboard/Sign each 2.00
Board Board
B.7(2) Occupational Safety mo. 8.53 B.7(2) Occupational Safety mo. 6.03
and Health Program and Health Program
B.8(1) Traffic Management mo. 8.53 B.8(1) Traffic Management mo. 6.03
B.9 Mobilization / l.s. 2.00 B.9 Mobilization / l.s. 1.00
Demobilization Demobilization
PART D SUBBASE AND BASE COURSE PART D SUBBASE AND BASE COURSE
200(1) Aggregate Subbase cu.m. 482.19 200(1) Aggregate Subbase cu.m. 429.33
Course Course
PART E SURFACE COURSES PART E SURFACE COURSES
302(2) Emulsified Asphalt sq.m. 30,286.50 302(2) Emulsified Asphalt sq.m. 29,493.50
310(1)c Bituminous Concrete sq.m. 30,286.50 310(1)c Bituminous Concrete sq.m. 29,493.50

Surface Wearing Surface Wearing


Course, Hot-Laid Course, Hot-Laid
(50mm) (50mm)
PART H MISCELLANEOUS STRUCTURES PART H MISCELLANEOUS STRUCTURES
612(1) Reflectorized sq.m. 150.47 612(1) Reflectorized sq.m. 1,263.55
Thermoplastic Thermoplastic
Pavement marking Pavement marking
(White) (White)
612(2) Reflectorized sq.m. 60.00 612(2) Reflectorized sq.m. 60.00
Thermoplastic Thermoplastic
Pavement Marking Pavement Marking
(Yellow) (Yellow)
CW2 – CONCRETE RECONSTRUCTION CW2 – CONCRETE RECONSTRUCTION
PART C EARTHWORKS PART C EARTHWORKS
101(3)b Removal of Actual sq.m. 3,519.70 101(3)b Removal of Actual sq.m. 3,519.70
6 Structures/Obstruction 6 Structures/Obstructio
(PCCP Unreinforced – n (PCCP Unreinforced
0.30m THK) – 0.30m THK)
102(2) Surplus Common cu.m. 703.94 102(2) Surplus Common cu.m. 703.94
Excavation Excavation
105(1)a Subgrade Preparation sq.m. 703.94 105(1)a Subgrade Preparation sq.m. 3,519.70
PART D SUBBASE AND BASE COURSE PART D SUBBASE AND BASE COURSE
200(1) Aggregate Subbase cu.m. 703.94 200(1) Aggregate Subbase cu.m. 703.94
Course Course
PART E SURFACE COURSES PART E SURFACE COURSES
311(1)f1 Portland Cement sq.m. 3,519.70 311(1)f1 Portland Cement sq.m. 3,519.70
Concrete Pavement Concrete Pavement
(Unreinforced) – 0.30m (Unreinforced) –
THK 0.30m THK

bac resolution no. b16 – 01– 2020 of contract id no. 20gn0059 page 2 of 3
A) BILL OF QUANTITIES:

Current Provision of BDs (including Amended Provision of BDs under this


Previous Amendments) Supplemental Bulletin
CONTRACT ID NO. 20GN0059 CONTRACT ID NO. 20GN0059
A. Correction of BILL OF QUANTIES in Section A. Correction of BILL OF QUANTIES in Section
X: X:
FROM TO
Pay Item Pay
Description Unit Quantity Description Unit Quantity
No. Item No.
PART H MISCELLANEOUS STRUCTURES PART H MISCELLANEOUS STRUCTURES
612(1) Reflectorized sq.m. 150.47 612(1) Reflectorized sq.m. 150.47
Thermoplastic Thermoplastic
Pavement marking Pavement marking
(White) (White)

D) CONTRACT DURATION:

FROM TO
256 Calendar Days 181 Calendar Days

WHEREAS, the Bids and Awards Committee convened to resolve to amend the Contract Name, Brief
Description, Bill of Quantities (BOQ) and Contract Duration of the project with Contract ID No. 20GN0059 due
to final revision of Program of Works;

NOW, THEREFORE, WE, the members of the Bids and Awards Committee, RESOLVE as it hereby
RESOLVED to amend the Contract Name, Brief Description, , Bill of Quantities (BOQ) and Contract Duration of
the project with Contract ID No. 20GN0059 due to final revision of Program of Works and to post the
supplemental bid bulletin in the DPWH website, PhilGEPS and in the office bulletin board.

RESOLVED at DPWH Bago City, Negros Occidental this 16th day of March 2020.

MAYO R. PELAGIO JERRY B. GARBANZOS


Engineer III Engineer III
BAC Chairman BAC Vice-Chairman

ALEX V. LORAYNA MARIO T. MULETA HAZEL E. APLASCA


Engineer III Engineer II Engineer II
BAC Regular Member BAC Provisional Member BAC Provisional Member

Approved:

GENARO M. PANGANIBAN
District Engineer

bac resolution no. b16 – 01– 2020 of contract id no. 20gn0059 page 3 of 3