Project/Section :-
Location/ID : Jl. Parit H. Husin, Kalimantan Barat
Cone Type/ID : Bi-cone X : 49 N 636673.37 m E Testing Date : 30/08/2017
Cone Diameter (cm) 3.51 Y : 114378.57 m N Investigated :
Sleeve Diameter (cm) 3.61 Total Depth (m) : -8,00 m
Sleeve Length (cm) 11.50 GWL (m) : -0,00 m
Sondir .01
Depth qc qc+qf qf fs Fd TFd Rf
Rf
(%)
0 10 20 30 40 50 60 70
0
2
4
6
8
10
12
Chart Cone Penetration Test (ASTM D-3441/SNI 2827:2008)
Project/Section :-
Location/ID : Jl. Parit H. Husin, Kalimantan Barat Sondir .01
Testing Date : 30/08/2017
Investigated :
qc Rf
- - - - - (kg/cm2) (%)
0 500 1000 1500 2000 2500 3000 3500 4000 0 10 20 30 40 50 60 70
0
0
1
1
2
2
2
3
3
4
4
5
4
5
6
6
7
7
6
8
8
9
9
10
8
10
11D
e
11p
12t
12h
10
13
13(m)
14
14
15
12
15
16
10 12 14 16 18 20
e
11p
12t
12h
10
13
13(m)
14
14
15
12
15
16
16
17
17
14
18
18
19
19
16
18
20
Rf
(%)
0 10 20 30 40 50 60 70
0
2
4
6
8
10
12
Chart Cone Penetration Test (ASTM D-3441/SNI 2827:2008)
Project/Section :-
Location/ID : Jl. Parit H. Husin, Kalimantan Barat Sondir .02
Testing Date : 30/08/2017
Investigated :
qc Rf
- - - - - (kg/cm2) (%)
0 500 1000 1500 2000 2500 3000 3500 4000 0 10 20 30 40 50 60 70
0
0
1
1
2
2
2
3
3
4
4
5
4
5
6
6
7
7
6
8
8
9
9
10
8
10
11D
e
11p
12t
12h
10
13
13(m)
14
14
15
12
15
16
16
10 12 14 16 18 20
11p
12t
12h
10
13
13(m)
14
14
15
12
15
16
16
17
17
14
18
18
19
19
20
16
20
21
18
20
Pile Bulat Diameter 15 cm Perhitungan Beban Ultimite Cara Langsung (Metode Meyerhoff)
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 15.00 15.00 15.00 176.63 0.0 0.0 47.10 0.00 0.00 0.00 0.00 0.00 0.000
100 15.00 15.00 15.00 176.63 13.0 38.6 47.10 2296.13 1819.60 4115.72 765.38 363.92 1.129
200 15.00 15.00 15.00 176.63 7.0 68.4 47.10 1236.38 3219.29 4455.66 412.13 643.86 1.056
300 15.00 15.00 15.00 176.63 9.0 96.6 47.10 1589.63 4548.99 6138.62 529.88 909.80 1.440
S.1
400 15.00 15.00 15.00 176.63 4.0 114.4 47.10 706.50 5388.81 6095.31 235.50 1077.76 1.313
500 15.00 15.00 15.00 176.63 8.0 138.2 47.10 1413.00 6508.56 7921.56 471.00 1301.71 1.773
600 15.00 15.00 15.00 176.63 34.0 182.8 47.10 6005.25 8608.10 14613.35 2001.75 1721.62 3.723
700 15.00 15.00 15.00 176.63 35.0 322.4 47.10 6181.88 15186.64 21368.52 2060.63 3037.33 5.098
800 15.00 15.00 15.00 176.63 155.0 618.1 47.10 27376.88 29113.56 56490.44 9125.63 5822.71 14.948
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 15.00 15.00 15.00 176.63 0.0 0.0 47.10 0.00 0.00 0.00 0.00 0.00 0.000
100 15.00 15.00 15.00 176.63 7.0 23.8 47.10 1236.38 1119.75 2356.13 412.13 223.95 0.636
200 15.00 15.00 15.00 176.63 6.0 50.5 47.10 1059.75 2379.47 3439.22 353.25 475.89 0.829
300 15.00 15.00 15.00 176.63 6.0 68.4 47.10 1059.75 3219.29 4279.04 353.25 643.86 0.997
S.2
400 15.00 15.00 15.00 176.63 6.0 87.7 47.10 1059.75 4129.09 5188.84 353.25 825.82 1.179
500 15.00 15.00 15.00 176.63 6.0 117.4 47.10 1059.75 5528.78 6588.53 353.25 1105.76 1.459
600 15.00 15.00 15.00 176.63 9.0 141.2 47.10 1589.63 6648.53 8238.16 529.88 1329.71 1.860
700 15.00 15.00 15.00 176.63 22.0 200.6 47.10 3885.75 9447.91 13333.66 1295.25 1889.58 3.185
800 15.00 15.00 15.00 176.63 155.0 524.5 47.10 27376.88 24704.54 52081.41 9125.63 4940.91 14.067
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 15.00 15.00 15.00 176.63 0.0 0.0 47.10 0.00 0.00 0.00 0.00 0.00 0.000
100 15.00 15.00 15.00 176.63 5.0 19.3 47.10 883.13 909.80 1792.92 294.38 181.96 0.476
200 15.00 15.00 15.00 176.63 5.0 43.1 47.10 883.13 2029.55 2912.68 294.38 405.91 0.700
300 15.00 15.00 15.00 176.63 3.0 63.9 47.10 529.88 3009.33 3539.21 176.63 601.87 0.778
S.3
400 15.00 15.00 15.00 176.63 5.0 83.2 47.10 883.13 3919.13 4802.26 294.38 783.83 1.078
500 15.00 15.00 15.00 176.63 8.0 130.8 47.10 1413.00 6158.64 7571.64 471.00 1231.73 1.703
600 15.00 15.00 15.00 176.63 8.0 163.4 47.10 1413.00 7698.30 9111.30 471.00 1539.66 2.011
700 15.00 15.00 15.00 176.63 120.0 285.3 47.10 21195.00 13437.03 34632.03 7065.00 2687.41 9.752
800 15.00 15.00 15.00 176.63 150.0 646.4 47.10 26493.75 30443.27 56937.02 8831.25 6088.65 14.920
Pekerjaan : Perencanaan Pembangunan Puskesmas Kecamatan Batang Lupar
Pile Bulat Diameter 20 cm Perhitungan Beban Ultimite Cara Langsung (Metode Meyerhoff)
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 20.00 20.00 20.00 314.00 0.0 0.0 62.80 0.00 0.00 0.00 0.00 0.00 0.000
100 20.00 20.00 20.00 314.00 13.0 38.6 62.80 4082.00 2426.13 6508.13 1360.67 485.23 1.846
200 20.00 20.00 20.00 314.00 7.0 68.4 62.80 2198.00 4292.38 6490.38 732.67 858.48 1.591
300 20.00 20.00 20.00 314.00 9.0 96.6 62.80 2826.00 6065.33 8891.33 942.00 1213.07 2.155
S.1
400 20.00 20.00 20.00 314.00 4.0 114.4 62.80 1256.00 7185.08 8441.08 418.67 1437.02 1.856
500 20.00 20.00 20.00 314.00 8.0 138.2 62.80 2512.00 8678.08 11190.08 837.33 1735.62 2.573
600 20.00 20.00 20.00 314.00 34.0 182.8 62.80 10676.00 11477.46 22153.46 3558.67 2295.49 5.854
700 20.00 20.00 20.00 314.00 35.0 322.4 62.80 10990.00 20248.86 31238.86 3663.33 4049.77 7.713
800 20.00 20.00 20.00 314.00 155.0 618.1 62.80 48670.00 38818.08 87488.08 16223.33 7763.62 23.987
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 20.00 20.00 20.00 314.00 0.0 0.0 62.80 0.00 0.00 0.00 0.00 0.00 0.000
100 20.00 20.00 20.00 314.00 7.0 23.8 62.80 2198.00 1493.00 3691.00 732.67 298.60 1.031
200 20.00 20.00 20.00 314.00 6.0 50.5 62.80 1884.00 3172.63 5056.63 628.00 634.53 1.263
300 20.00 20.00 20.00 314.00 6.0 68.4 62.80 1884.00 4292.38 6176.38 628.00 858.48 1.486
S.2
400 20.00 20.00 20.00 314.00 6.0 87.7 62.80 1884.00 5505.45 7389.45 628.00 1101.09 1.729
500 20.00 20.00 20.00 314.00 6.0 117.4 62.80 1884.00 7371.70 9255.70 628.00 1474.34 2.102
600 20.00 20.00 20.00 314.00 9.0 141.2 62.80 2826.00 8864.71 11690.71 942.00 1772.94 2.715
700 20.00 20.00 20.00 314.00 22.0 200.6 62.80 6908.00 12597.21 19505.21 2302.67 2519.44 4.822
800 20.00 20.00 20.00 314.00 155.0 524.5 62.80 48670.00 32939.38 81609.38 16223.33 6587.88 22.811
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 20.00 20.00 20.00 314.00 0.0 0.0 62.80 0.00 0.00 0.00 0.00 0.00 0.000
100 20.00 20.00 20.00 314.00 5.0 19.3 62.80 1570.00 1213.07 2783.07 523.33 242.61 0.766
200 20.00 20.00 20.00 314.00 5.0 43.1 62.80 1570.00 2706.07 4276.07 523.33 541.21 1.065
300 20.00 20.00 20.00 314.00 3.0 63.9 62.80 942.00 4012.45 4954.45 314.00 802.49 1.116
S.3
400 20.00 20.00 20.00 314.00 5.0 83.2 62.80 1570.00 5225.51 6795.51 523.33 1045.10 1.568
500 20.00 20.00 20.00 314.00 8.0 130.8 62.80 2512.00 8211.52 10723.52 837.33 1642.30 2.480
600 20.00 20.00 20.00 314.00 8.0 163.4 62.80 2512.00 10264.40 12776.40 837.33 2052.88 2.890
700 20.00 20.00 20.00 314.00 120.0 285.3 62.80 37680.00 17916.04 55596.04 12560.00 3583.21 16.143
800 20.00 20.00 20.00 314.00 150.0 646.4 62.80 47100.00 40591.03 87691.03 15700.00 8118.21 23.818
Pekerjaan : Perencanaan Pembangunan Puskesmas Kecamatan Batang Lupar
Pile Bulat Diameter 25 cm Perhitungan Beban Ultimite Cara Langsung (Metode Meyerhoff)
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 25.00 25.00 25.00 490.63 0.0 0.0 78.50 0.00 0.00 0.00 0.00 0.00 0.000
100 25.00 25.00 25.00 490.63 13.0 38.6 78.50 6378.13 3032.66 9410.79 2126.04 606.53 2.733
200 25.00 25.00 25.00 490.63 7.0 68.4 78.50 3434.38 5365.48 8799.86 1144.79 1073.10 2.218
300 25.00 25.00 25.00 490.63 9.0 96.6 78.50 4415.63 7581.66 11997.28 1471.88 1516.33 2.988
S.1
400 25.00 25.00 25.00 490.63 4.0 114.4 78.50 1962.50 8981.35 10943.85 654.17 1796.27 2.450
500 25.00 25.00 25.00 490.63 8.0 138.2 78.50 3925.00 10847.60 14772.60 1308.33 2169.52 3.478
600 25.00 25.00 25.00 490.63 34.0 182.8 78.50 16681.25 14346.83 31028.08 5560.42 2869.37 8.430
700 25.00 25.00 25.00 490.63 35.0 322.4 78.50 17171.88 25311.07 42482.95 5723.96 5062.21 10.786
800 25.00 25.00 25.00 490.63 155.0 618.1 78.50 76046.88 48522.61 124569.48 25348.96 9704.52 35.053
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 25.00 25.00 25.00 490.63 0.0 0.0 78.50 0.00 0.00 0.00 0.00 0.00 0.000
100 25.00 25.00 25.00 490.63 7.0 23.8 78.50 3434.38 1866.25 5300.63 1144.79 373.25 1.518
200 25.00 25.00 25.00 490.63 6.0 50.5 78.50 2943.75 3965.79 6909.54 981.25 793.16 1.774
300 25.00 25.00 25.00 490.63 6.0 68.4 78.50 2943.75 5365.48 8309.23 981.25 1073.10 2.054
S.2
400 25.00 25.00 25.00 490.63 6.0 87.7 78.50 2943.75 6881.81 9825.56 981.25 1376.36 2.358
500 25.00 25.00 25.00 490.63 6.0 117.4 78.50 2943.75 9214.63 12158.38 981.25 1842.93 2.824
600 25.00 25.00 25.00 490.63 9.0 141.2 78.50 4415.63 11080.88 15496.51 1471.88 2216.18 3.688
700 25.00 25.00 25.00 490.63 22.0 200.6 78.50 10793.75 15746.52 26540.27 3597.92 3149.30 6.747
800 25.00 25.00 25.00 490.63 155.0 524.5 78.50 76046.88 41174.23 117221.11 25348.96 8234.85 33.584
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 25.00 25.00 25.00 490.63 0.0 0.0 78.50 0.00 0.00 0.00 0.00 0.00 0.000
100 25.00 25.00 25.00 490.63 5.0 19.3 78.50 2453.13 1516.33 3969.46 817.71 303.27 1.121
200 25.00 25.00 25.00 490.63 5.0 43.1 78.50 2453.13 3382.59 5835.71 817.71 676.52 1.494
300 25.00 25.00 25.00 490.63 3.0 63.9 78.50 1471.88 5015.56 6487.43 490.63 1003.11 1.494
S.3
400 25.00 25.00 25.00 490.63 5.0 83.2 78.50 2453.13 6531.89 8985.01 817.71 1306.38 2.124
500 25.00 25.00 25.00 490.63 8.0 130.8 78.50 3925.00 10264.40 14189.40 1308.33 2052.88 3.361
600 25.00 25.00 25.00 490.63 8.0 163.4 78.50 3925.00 12830.50 16755.50 1308.33 2566.10 3.874
700 25.00 25.00 25.00 490.63 120.0 285.3 78.50 58875.00 22395.05 81270.05 19625.00 4479.01 24.104
800 25.00 25.00 25.00 490.63 150.0 646.4 78.50 73593.75 50738.78 124332.53 24531.25 10147.76 34.679
Pekerjaan : Perencanaan Pembangunan Puskesmas Kecamatan Batang Lupar
Pile Persegi 15x15 cm Perhitungan Beban Ultimite Cara Langsung (Metode Meyerhoff)
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 15.00 15.00 15.00 225.00 0.0 0.0 60.00 0.00 0.00 0.00 0.00 0.00 0.000
100 15.00 15.00 15.00 225.00 13.0 38.6 60.00 2925.00 2317.96 5242.96 975.00 463.59 1.439
200 15.00 15.00 15.00 225.00 7.0 68.4 60.00 1575.00 4101.00 5676.00 525.00 820.20 1.345
300 15.00 15.00 15.00 225.00 9.0 96.6 60.00 2025.00 5794.90 7819.90 675.00 1158.98 1.834
S.1
400 15.00 15.00 15.00 225.00 4.0 114.4 60.00 900.00 6864.72 7764.72 300.00 1372.94 1.673
500 15.00 15.00 15.00 225.00 8.0 138.2 60.00 1800.00 8291.16 10091.16 600.00 1658.23 2.258
600 15.00 15.00 15.00 225.00 34.0 182.8 60.00 7650.00 10965.73 18615.73 2550.00 2193.15 4.743
700 15.00 15.00 15.00 225.00 35.0 322.4 60.00 7875.00 19346.04 27221.04 2625.00 3869.21 6.494
800 15.00 15.00 15.00 225.00 155.0 618.1 60.00 34875.00 37087.34 71962.34 11625.00 7417.47 19.042
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 15.00 15.00 15.00 225.00 0.0 0.0 60.00 0.00 0.00 0.00 0.00 0.00 0.000
100 15.00 15.00 15.00 225.00 7.0 23.8 60.00 1575.00 1426.44 3001.44 525.00 285.29 0.810
200 15.00 15.00 15.00 225.00 6.0 50.5 60.00 1350.00 3031.18 4381.18 450.00 606.24 1.056
300 15.00 15.00 15.00 225.00 6.0 68.4 60.00 1350.00 4101.00 5451.00 450.00 820.20 1.270
S.2
400 15.00 15.00 15.00 225.00 6.0 87.7 60.00 1350.00 5259.98 6609.98 450.00 1052.00 1.502
500 15.00 15.00 15.00 225.00 6.0 117.4 60.00 1350.00 7043.03 8393.03 450.00 1408.61 1.859
600 15.00 15.00 15.00 225.00 9.0 141.2 60.00 2025.00 8469.47 10494.47 675.00 1693.89 2.369
700 15.00 15.00 15.00 225.00 22.0 200.6 60.00 4950.00 12035.56 16985.56 1650.00 2407.11 4.057
800 15.00 15.00 15.00 225.00 155.0 524.5 60.00 34875.00 31470.75 66345.75 11625.00 6294.15 17.919
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 15.00 15.00 15.00 225.00 0.0 0.0 60.00 0.00 0.00 0.00 0.00 0.00 0.000
100 15.00 15.00 15.00 225.00 5.0 19.3 60.00 1125.00 1158.98 2283.98 375.00 231.80 0.607
200 15.00 15.00 15.00 225.00 5.0 43.1 60.00 1125.00 2585.42 3710.42 375.00 517.08 0.892
300 15.00 15.00 15.00 225.00 3.0 63.9 60.00 675.00 3833.55 4508.55 225.00 766.71 0.992
S.3
400 15.00 15.00 15.00 225.00 5.0 83.2 60.00 1125.00 4992.53 6117.53 375.00 998.51 1.374
500 15.00 15.00 15.00 225.00 8.0 130.8 60.00 1800.00 7845.40 9645.40 600.00 1569.08 2.169
600 15.00 15.00 15.00 225.00 8.0 163.4 60.00 1800.00 9806.75 11606.75 600.00 1961.35 2.561
700 15.00 15.00 15.00 225.00 120.0 285.3 60.00 27000.00 17117.23 44117.23 9000.00 3423.45 12.423
800 15.00 15.00 15.00 225.00 150.0 646.4 60.00 33750.00 38781.23 72531.23 11250.00 7756.25 19.006
Pekerjaan : Perencanaan Pembangunan Puskesmas Kecamatan Batang Lupar
Pile Persegi 20x20 cm Perhitungan Beban Ultimite Cara Langsung (Metode Meyerhoff)
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 20.00 20.00 20.00 400.00 0.0 0.0 80.00 0.00 0.00 0.00 0.00 0.00 0.000
100 20.00 20.00 20.00 400.00 13.0 38.6 80.00 5200.00 3090.61 8290.61 1733.33 618.12 2.351
200 20.00 20.00 20.00 400.00 7.0 68.4 80.00 2800.00 5468.01 8268.01 933.33 1093.60 2.027
300 20.00 20.00 20.00 400.00 9.0 96.6 80.00 3600.00 7726.53 11326.53 1200.00 1545.31 2.745
S.1
400 20.00 20.00 20.00 400.00 4.0 114.4 80.00 1600.00 9152.97 10752.97 533.33 1830.59 2.364
500 20.00 20.00 20.00 400.00 8.0 138.2 80.00 3200.00 11054.88 14254.88 1066.67 2210.98 3.278
600 20.00 20.00 20.00 400.00 34.0 182.8 80.00 13600.00 14620.97 28220.97 4533.33 2924.19 7.458
700 20.00 20.00 20.00 400.00 35.0 322.4 80.00 14000.00 25794.72 39794.72 4666.67 5158.94 9.826
800 20.00 20.00 20.00 400.00 155.0 618.1 80.00 62000.00 49449.79 111449.79 20666.67 9889.96 30.557
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 20.00 20.00 20.00 400.00 0.0 0.0 80.00 0.00 0.00 0.00 0.00 0.00 0.000
100 20.00 20.00 20.00 400.00 7.0 23.8 80.00 2800.00 1901.91 4701.91 933.33 380.38 1.314
200 20.00 20.00 20.00 400.00 6.0 50.5 80.00 2400.00 4041.57 6441.57 800.00 808.31 1.608
300 20.00 20.00 20.00 400.00 6.0 68.4 80.00 2400.00 5468.01 7868.01 800.00 1093.60 1.894
S.2
400 20.00 20.00 20.00 400.00 6.0 87.7 80.00 2400.00 7013.31 9413.31 800.00 1402.66 2.203
500 20.00 20.00 20.00 400.00 6.0 117.4 80.00 2400.00 9390.71 11790.71 800.00 1878.14 2.678
600 20.00 20.00 20.00 400.00 9.0 141.2 80.00 3600.00 11292.62 14892.62 1200.00 2258.52 3.459
700 20.00 20.00 20.00 400.00 22.0 200.6 80.00 8800.00 16047.41 24847.41 2933.33 3209.48 6.143
800 20.00 20.00 20.00 400.00 155.0 524.5 80.00 62000.00 41961.00 103961.00 20666.67 8392.20 29.059
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 20.00 20.00 20.00 400.00 0.0 0.0 80.00 0.00 0.00 0.00 0.00 0.00 0.000
100 20.00 20.00 20.00 400.00 5.0 19.3 80.00 2000.00 1545.31 3545.31 666.67 309.06 0.976
200 20.00 20.00 20.00 400.00 5.0 43.1 80.00 2000.00 3447.22 5447.22 666.67 689.44 1.356
300 20.00 20.00 20.00 400.00 3.0 63.9 80.00 1200.00 5111.40 6311.40 400.00 1022.28 1.422
S.3
400 20.00 20.00 20.00 400.00 5.0 83.2 80.00 2000.00 6656.70 8656.70 666.67 1331.34 1.998
500 20.00 20.00 20.00 400.00 8.0 130.8 80.00 3200.00 10460.53 13660.53 1066.67 2092.11 3.159
600 20.00 20.00 20.00 400.00 8.0 163.4 80.00 3200.00 13075.67 16275.67 1066.67 2615.13 3.682
700 20.00 20.00 20.00 400.00 120.0 285.3 80.00 48000.00 22822.98 70822.98 16000.00 4564.60 20.565
800 20.00 20.00 20.00 400.00 150.0 646.4 80.00 60000.00 51708.31 111708.31 20000.00 10341.66 30.342
Pekerjaan : Perencanaan Pembangunan Puskesmas Kecamatan Batang Lupar
Pile Persegi 25x25 cm Perhitungan Beban Ultimite Cara Langsung (Metode Meyerhoff)
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 25.00 25.00 25.00 625.00 0.0 0.0 100.00 0.00 0.00 0.00 0.00 0.00 0.000
100 25.00 25.00 25.00 625.00 13.0 38.6 100.00 8125.00 3863.26 11988.26 2708.33 772.65 3.481
200 25.00 25.00 25.00 625.00 7.0 68.4 100.00 4375.00 6835.01 11210.01 1458.33 1367.00 2.825
300 25.00 25.00 25.00 625.00 9.0 96.6 100.00 5625.00 9658.16 15283.16 1875.00 1931.63 3.807
S.1
400 25.00 25.00 25.00 625.00 4.0 114.4 100.00 2500.00 11441.21 13941.21 833.33 2288.24 3.122
500 25.00 25.00 25.00 625.00 8.0 138.2 100.00 5000.00 13818.60 18818.60 1666.67 2763.72 4.430
600 25.00 25.00 25.00 625.00 34.0 182.8 100.00 21250.00 18276.21 39526.21 7083.33 3655.24 10.739
700 25.00 25.00 25.00 625.00 35.0 322.4 100.00 21875.00 32243.40 54118.40 7291.67 6448.68 13.740
800 25.00 25.00 25.00 625.00 155.0 618.1 100.00 96875.00 61812.24 158687.24 32291.67 12362.45 44.654
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 25.00 25.00 25.00 625.00 0.0 0.0 100.00 0.00 0.00 0.00 0.00 0.00 0.000
100 25.00 25.00 25.00 625.00 7.0 23.8 100.00 4375.00 2377.39 6752.39 1458.33 475.48 1.934
200 25.00 25.00 25.00 625.00 6.0 50.5 100.00 3750.00 5051.96 8801.96 1250.00 1010.39 2.260
300 25.00 25.00 25.00 625.00 6.0 68.4 100.00 3750.00 6835.01 10585.01 1250.00 1367.00 2.617
S.2
400 25.00 25.00 25.00 625.00 6.0 87.7 100.00 3750.00 8766.64 12516.64 1250.00 1753.33 3.003
500 25.00 25.00 25.00 625.00 6.0 117.4 100.00 3750.00 11738.38 15488.38 1250.00 2347.68 3.598
600 25.00 25.00 25.00 625.00 9.0 141.2 100.00 5625.00 14115.78 19740.78 1875.00 2823.16 4.698
700 25.00 25.00 25.00 625.00 22.0 200.6 100.00 13750.00 20059.26 33809.26 4583.33 4011.85 8.595
800 25.00 25.00 25.00 625.00 155.0 524.5 100.00 96875.00 52451.25 149326.25 32291.67 10490.25 42.782
Kedalaman dh (cm) db (cm) dm (cm) Ap (cm2) qc (kg/cm2) JHP Qbi (kg) Qsi (kg) Qui (ton)
No Sondir O (cm) Qp (kg) Qs (kg) Qult (kg)
tiang L (cm) (kg/cm)
0 25.00 25.00 25.00 625.00 0.0 0.0 100.00 0.00 0.00 0.00 0.00 0.00 0.000
100 25.00 25.00 25.00 625.00 5.0 19.3 100.00 3125.00 1931.63 5056.63 1041.67 386.33 1.428
200 25.00 25.00 25.00 625.00 5.0 43.1 100.00 3125.00 4309.03 7434.03 1041.67 861.81 1.903
300 25.00 25.00 25.00 625.00 3.0 63.9 100.00 1875.00 6389.25 8264.25 625.00 1277.85 1.903
S.3
400 25.00 25.00 25.00 625.00 5.0 83.2 100.00 3125.00 8320.88 11445.88 1041.67 1664.18 2.706
500 25.00 25.00 25.00 625.00 8.0 130.8 100.00 5000.00 13075.67 18075.67 1666.67 2615.13 4.282
600 25.00 25.00 25.00 625.00 8.0 163.4 100.00 5000.00 16344.58 21344.58 1666.67 3268.92 4.936
700 25.00 25.00 25.00 625.00 120.0 285.3 100.00 75000.00 28528.72 103528.72 25000.00 5705.74 30.706
800 25.00 25.00 25.00 625.00 150.0 646.4 100.00 93750.00 64635.39 158385.39 31250.00 12927.08 44.177
Persegi 25x25
Daya Dukung Ijin (rata-rata)
Kedalaman tiang (L)
Meyerhof (Ton)
0 0 0 0 0.000
3.48098629 1.93381208 1.42799315 100 2.281
2.82533472 2.26039233 1.90347189 200 2.330
3.80663239 2.61700139 1.90284912 300 2.775
3.12157479 3.00332787 2.70584227 400 2.944
4.43038686 3.5976763 4.28179975 500 4.103
10.7385762 4.69815504 4.93558303 600 6.791
13.7403471 8.59518523 30.7057449 700 17.680
44.654114 42.7819164 44.1770783 800 43.871
Kedalaman
Tanah
(cm)
S.1 S.2 S.3 Titik Sondir
0 0 0 0
13 7 5 100
7 6 5 200
9 6 3 300
4 6 5 400
8 6 8 500
34 9 8 600
35 22 120 700
155 155 150 800
HAND BOR
Perencanaan Pembangunan Puskesmas Kecamatan Batang Lupar
Batang Lupar, Kabupaten Kapuas Hulu, Kalimantan Barat
Tanggal : 26-Mar-17 Pelaksana : Ridho
Titik Bor : B.1 MAT : -0,00 m
Koordinat : 49N 636672.00 m E 114374.00 m N Keterangan : End Bor 2,00 m
0.00
1.00
2.00
3.00
4.00
5.00