Professional Documents
Culture Documents
Ground-Mounted
Racking Considerations
Self-Consumption
PV Applications
Perspectives on
Zero-Export &
Curtailed Projects
Solar Marketing
Strategies
Effective Brand Building
& Customer Engagement
in the Digital Age
Interview
Richard Lawrence
NABCEP
COMPLIMENTARY ISSUE
COURTESY OF
Borrego Solar
Palmer Airfield Project
Palmer, MA f
TO UG H.
Baked, frozen or wet – 20,000 units tough tested in America.
The #1 3-phase string platform in the USA. Check us out.
chintpowersystems.com
The Best Support
is Simply Brilliant.
P R O U D LY
Fe a tu re s
38
20
20 Ground-Mounted Racking 54 Solar Marketing in the Digital Age
Considerations Solar marketing has evolved in step with the US solar
Project developers are deploying fixed and tracked industry. As solar firms grew and expanded into new
ground-mounted PV power plants with a growing geographies, so did their marketing departments, dis-
range of capacities on sites with increasingly diverse seminating content that explained how solar works,
characteristics. Engineering considerations, equip- touted the many benefits it provides and identified
ment design and selection, and mechanical and electri- product vendors and installation contractors. Today,
cal system construction are quickly evolving as the potential customers have become far more sophisti-
industry gains experience developing specific projects. cated, and, thanks to the Internet, they can be their
This article aggregates the experience of several solar own subject matter experts without having to make a
industry experts and explores best practices related to phone call or meet with a vendor. This article explores
site grading and design optimization, ground mounts successful strategies for effective solar marketing in the
on landfills, bonding and grounding, and scalable digital age.
BY PHILIP HALL
mounting solutions.
BY SAMUEL LAUGHLIN AND BILL REAUGH; BRYAN
54
MORRISON; MARVIN HAMON; KEITH BEISNER AND
SARA JACOBS
38 Self-Consumption PV Systems
Regulatory changes and technical advances are begin-
ning to push the deployment of self-consumption PV
projects in the US. Will it remain a niche application or
become a common system configuration nationwide?
We reached out to several industry stakeholders to get
their perspectives on the past, present and future of
curtailed and zero-export PV systems.
COMPILED BY JOE SCHWARTZ
“ Quick Rack is truly the next generation in rail-free mounting systems, enabling us to
deliver aesthetically pleasing rooftop solar that differentiates us from our competition.
We’ve been experimenting with rail-free solar mounting for a while, but systems before
Quick Rack limited our selection of panels and were extremely difficult to service.
I consider Quick Rack a must-have solution for installers who want their systems to last.
– Glen Koedding
President, Green Sun Energy Services, LLC
D e p a r t m ent s
12
FRONT END
6 Contributors Experience + Expertise
12 QA Quality Assurance
Installing Consumption-Monitoring CTs
BACK END
64 Interview An Experienced Perspective
Richard Lawrence, NABCEP
70 Advertiser Index
68
8
f ON THE COVER Borrego Solar,
Syncarpha Capital and Renewable Energy
Massachusetts partnered to develop and
construct the 6 MW Palmer Airfield project. After
75 years of airfield operations dating back to
the 1920s and subsequent remediation efforts,
the site is now home to the state’s largest solar
brownfield project. TerraSmart TerraFarm racking
systems support Yingli Solar, Canadian Solar and
Suniva modules. Four SMA America SC800CP-US
central inverters and 70 SMA America Sunny
Tripower 24000TL-US string inverters provide
power processing for the site.
Photo: Courtesy Borrego Solar
Introducing the new Sunny Boy 5.0-US / 6.0-US series from SMA
Same name, new game.
Contributors Experience + Expertise
®
technology development and regulatory policy. While SolarPro strives to publish only safe and accurate content, we assume no responsibility
or liability for the use of this information.
6 S O L A R PR O | March/April 2016
the future of
utility-scale
solar trackers
is here.
The (r)evolutionary new design of the
DuraTrack® HZ v3 represents a quantum
leap in forward engineering by Array.
DuraTrack HZ v3 is hands-down the
fastest tracking system to install, offers
(r)evolutionary the highest power density, and requires
zero scheduled maintenance. What
does this mean to you and your project?
A coup in intelligent design, Array’s
proven record of reliability and the
best LCOE in the industry.
in hd
6% more density
lcoe
lowest. period.
Boasting 6% more Fastest to install, highest
density than our density, zero scheduled
closest competitor, maintenance and proven
the DuraTrack HZ v3 reliability means Array
makes the most of trackers deliver the
your investment. lowest levelized cost
of electricity.
zero
maintenance
one
fastener per module
Our drivetrain is sealed Our unique module
and lubricated for life, clamp with integrated
eliminating scheduled grounding significantly
maintenance so your reduces panel install
project is all about time and does not
making money while require specialized tools.
the sun shines.
SolarEdge Releases
StorEdge Solution
[Herzliya Pituach, Israel] After successfully fielding ini- backup power
tial StorEdge installations in late 2015, SolarEdge officially function allows
announced the commercial release of its dc-coupled energy homeowners to
storage solution in January. Compatible with high-voltage store and use
lithium-ion home battery products, such as Tesla’s Powerwall, PV-generated
the StorEdge platform can support backup power, self- energy during
consumption and other energy management applications. grid outages. The
In a time-of-use regime, for instance, the single-inverter sys- StorEdge solution is based around SolarEdge’s existing tech-
tem can prioritize energy consumption from the grid during nology, which includes non-isolated string inverters, dc-to-dc
off-peak rate periods and later use stored solar energy to optimizers and module-level monitoring.
lower grid-energy consumption during on-peak periods. The SolarEdge / 510.498.3200 / solaredge.us
8 S O L A R PR O | March/April 2016
/ Perfect Welding / Solar Energy / Perfect Charging
JOIN US IN #24HOURSOFSUN.
WWW.24HOURSOFSUN.COM
10 S O L A R PR O | March/April 2016
No Boundaries
When it comes to deep-cycle batteries, no one goes
to the extremes of performance like Trojan Battery
Company. Our full line of deep-cycle flooded, AGM
and gel batteries are ideal for all of your energy
storage needs.
C-MAX
TECHNOLOGY
C ou r te sy E n ph a se E n e r gy
ing and battery storage. Technologies
such as these can enable the sale of Split core CTs used for
PV systems in markets that limit or consumption monitoring are
prohibit the export of solar energy to typically split core, which allows
the grid. easy installation around existing
With the development of high- service conductors or busbars.
efficiency lithium-ion batteries, there
are new opportunities to add storage
to a PV system for meeting zero- straightforward for most PV systems. of the service panel are not acces-
export requirements, for demand The associated wiring is generally sible or do not have adequate space
management and for lowering utility accessible since the crew often installs around them for the installation of
distribution charges. New solar-plus- it at the same time as the PV system. CTs. In this article, I provide guidance
storage technologies are particularly However, the installation of CTs for for site assessors who are evaluating
valuable in zero-export markets such consumption monitoring is not always a residence to determine whether it
as Hawaii, where, from a regulatory as straightforward. can easily accommodate consumption
standpoint, it is much easier to install In residential applications, con- monitoring. I present some tips and
a PV system that does not export sumption monitoring requires the tricks for sites that may not appear to
power to the grid. installation of CTs on the home’s support consumption monitoring at
Engineering effective self- main service conductors. CTs used for first glance. I also suggest potential
consumption and solar-plus-storage consumption monitoring are almost modifications to service wiring that can
systems requires the measurement always split-core CTs, which you can enable the installation of consumption-
and tracking of monitoring CTs.
how much energy
a residence con- As state public utility commissions from Nevada Assessing a Site for Consumption
sumes, as well as Monitoring
how much energy to Hawaii modify the rules for PV installations, The CTs used for monitoring home
the PV system consumption vary in their physical
produces. Most solar companies are developing and deploying dimensions. They may be calibrated
of the systems for use with the system monitor that
available today systems that include consumption monitoring. they are paired with, but be aware that
rely on the instal- not all CTs are certified as revenue
lation of current grade. For example, Enphase Energy
transformers offers the Envoy-S Metered system
(CTs) for monitoring a home’s solar open and close around the existing monitor, which enables both revenue-
production and energy consump- service entrance conductors or bus- grade production monitoring and
tion. When required, the installation bars. At some sites, the conductors home energy consumption monitoring.
of a production monitoring CT is or bussing that feed the main breaker The 200 A C O N T I N U E D O N PA G E 1 4
12 S O L A R PR O | March/April 2016
QA
consumption-monitoring CTs pro- Some consumption-monitoring prod- the service entrance conduc-
vided with the Enphase Envoy-S tors or busbars. However, if
Metered monitoring system can ucts support the installation of multiple you test the voltage across
accommodate conductors up to 4/0 the main breaker, you will
RHW, 350 MCM THWN, and 350 MCM conductors within a single CT. find that the line conduc-
XHHW, and can also accommodate 0.75- tors are rotated inside the
inch busbars. circuit breaker. This allows
When installing consumption- conductors or busbars in the you to install one CT on the
monitoring CTs, you must determine main service panel? conductor above the main breaker and
whether you can readily install the one on the bussing below the main
split-core CTs around the service P Can the core of the CTs fit around breaker. You can install the CTs on the
conductors or busbars. You typically each busbar or conductor? right conductor and right busbar in the
encounter two service configurations: Eaton Solar Power Centers. You must
separate units for the utility meter P Is the clearance around each place the main breaker in the open
and service panel, or panels that busbar or conductor adequate to position when attaching the CT to the
combine the utility meter and service accommodate a CT? busbar. Note that it may help to loosen
panel in one enclosure. The salesper- the bolt that holds the busbar when
son or technician who is evaluating The physical design and construc- attaching the CT.
the site should record the service tion of combined meter and service
configuration (separate or combined panel products may present unique Installing Multiple Conductors
meter and service panel), as well as challenges. For instance, with many in a Single CT
answer and document the following Eaton service panels, including Eaton’s Some consumption-monitoring
three questions: Solar Power Center panels, it may products support the installation of
initially appear that the consumption- multiple conductors within a single CT.
P Can you access at least 2 inches monitoring CTs fit on one of the service If it is not possible to place the CT on
of both of the Line-1 and Line-2 entrance conductors but not both of a service panel’s main service conduc-
tors or busbars, then you can often run
all of the individual circuit conductors
Panel type Separate and combined through a single set of consumption-
meter and service panels may pres- monitoring CTs. However, this
ent different requirements for the field approach presents some challenges.
installation of CTs used for consump- Notably, due to the number of conduc-
tion monitoring. tors, it is easy to make a wiring error.
This method may require extending
some of the individual ac circuits, and
in some cases, it may be difficult to fit
the wiring and CTs within the enclo-
sure. Finally, you must take care to
ensure that all the conductors on Line 1
are installed in the Line 1 CT and all the
conductors on Line 2 are installed in
the Line 2 CT.
When running multiple conduc-
tors through a single CT, you must first
determine if the sum of the conductors
C ou r t es y En p h as e En e r gy (2 )
14 S O L A R PR O | March/April 2016
Got Reliability?
Contact us today!
t: 866.438.8408
e: sales@ginlong-usa.com
Made by Ginlong Technologies
w: www.ginlong.com ‘SolisWEB’ App NOW available
QA
Enphase Consumption-Monitoring CT Cross-Sectional Area two hot conductors and
a shared neutral to power
100% fill 60% fill (if multiple conductors) 120 Vac loads. The neutral
conductor of a multiwire
Enphase consumption-monitoring CT 520 mm 2
0.806 in
2
312 mm2 0.484 in2
branch circuit carries the
unbalanced current of the two
Dimensions of Insulated Conductors as Specified in NEC Chapter 9, Table 5 line conductors. You must
always run multiwire branch
Size and type of conductor Approximate diameter Approximate area circuits to a common-trip
14 AWG THWN 2.819 mm 0.111 in 6.258 mm2 0.0097 in2 two-pole breaker. If you tie the
red and black conductors of
12 AWG THWN 3.302 mm 0.130 in 8.581 mm2 0.0133 in2
the multiwire branch circuit
10 AWG THWN 4.166 mm 0.164 in 13.61 mm2 0.0211 in2 to the same line, then the
8 AWG THWN 5.486 mm 0.216 in 23.61 mm2 0.0366 in2 neutral carries the full current
of both circuits, which may
6 AWG THWN 6.452 mm 0.254 in 32.71 mm2 0.0507 in2
overload the conductors and
4 AWG THWN 8.230 mm 0.324 in 53.16 mm2 0.0824 in2 present a fire hazard.
3 AWG THWN 8.941 mm 0.352 in 62.77 mm2 0.0973 in2
Installing Parallel-
2 AWG THWN 9.754 mm 0.384 in 74.71 mm2 0.1158 in2
Connected CTs
1 AWG THWN 11.33 mm 0.446 in 100.8 mm2 0.1562 in2 In many scenarios, installing
1/0 AWG THWN 12.34 mm 0.486 in 119.7 mm2 0.1855 in2 multiple conductors through
a single CT is difficult
2/0 AWG THWN 13.51 mm 0.523 in 143.4 mm 2
0.2223 in2
because some conductors
3/0 AWG THWN 14.83 mm 0.584 in 172.8 mm2 0.2679 in2 may enter from the bottom
4/0 AWG THWN 16.31 mm 0.642 in 208.8 mm2 0.3237 in2 and others from the top of
the service panel. In addi-
250 MCM THWN 18.06 mm 0.711 in 256.1 mm 2
0.3970 in2
tion, some service panels
300 MCM THWN 19.46 mm 0.766 in 297.3 mm2 0.4608 in2 have 400 A services equipped
350 MCM THWN 20.75 mm 0.817 in 338.2 mm 2
0.5242 in2 with a set of two 200 A
conductors and parallel-
Table 1 Based on a 60% fill calculation (60% of CT cross-sectional area divided by area of connected 200 A circuit
conductor), you can install up to 36 12 AWG THWN conductors within each CT used in the breakers. In these cases, it
Enphase Envoy-S Metered monitoring system. is possible to use a set
of parallel-connected
exceeding 24 inches in length. A 60% CT rewire or extend individual circuits, consumption-monitoring
fill calculation provides a conservative do so in an organized way to open up CTs to monitor the home’s consump-
basis for calculating the number of con- additional space within the service tion. You can accomplish this by
ductors allowable within an individual panel. Marking each conductor that installing two consumption-
CT (see Table 1 above). For example, passes through the Line 2 CT with monitoring CTs on each line and then
based on a 60% fill calculation, you can red tape helps separate Line 1 and parallel-connecting the CT wiring.
install 36 12 AWG THWN conductors Line 2 circuits and ensures that all When you are installing parallel
within a single Enphase consumption- red-marked conductors are landed on consumption-monitoring CTs, you
monitoring CT. Line 2. Using zip ties to bundle Line 1 must verify that all conductors pass-
You should consider several best and Line 2 conductors can organize ing through the Line 1 CT terminate
practices when installing multiple the conductors and make it easier to at circuit breakers on Line 1, and that
conductors in a single CT: Always install a CT around them. Line 2 conductors passing through
turn off the main breaker to reduce If multiwire branch circuits are the Line 2 CT terminate at circuit
the risk of electrical shock, and be present, you should verify that the breakers on Line 2. Run a fill calcula-
aware that the line side of the main ungrounded conductors in these tion to determine that conductors fill
breaker will remain energized. If circuits are wired on opposite line con- no more than 60% of the CT’s cross-
the CT installation requires you to ductors. Multiwire branch circuits use sectional area. Finally, observe the
16 S O L A R PR O | March/April 2016
Multiple conductors In some main service meter to an enclosure
cases, grouping individual circuit that is separate from the main service
conductors (Line 1 and Line 2) to panel. Relocating the main meter
run through each consumption- to a separate enclosure makes the
monitoring CT may be the most former utility side of the main service
practical installation approach. panel accessible for the installation
of the consumption-monitoring CTs.
safety requirements spelled If you relocate the service meter, you
out in the NEC, particularly must cover the old service meter
with respect to multiwire base with a service cover blank and
branch circuits. install meter jumper bars in the old
meter base.
Retrofitting the Electrical
Service Extending Consumption
If the consumption-monitoring CT Conductors
CTs do not fit, you cannot just You can often extend consumption
quit. If all else fails, you may CT wiring if the system-monitoring
want to ask the utility for access equipment is not located in close
PROVEN.
Baked, frozen or wet – 20,000 units
tough tested in America.
The #1 3-phase string platform
in the USA. Check us out.
chintpowersystems.com
solarprofessional.com | S O L A R P R O 17
QA
If all else fails, you may want to to ask monitoring are installed cor-
rectly is to turn off the PV
P Confirm that the consumption
monitoring CTs are oriented
the utility for access to the service system to verify that the moni-
tor and the main service meter
correctly.
NEW!
MPPTsolid 230/100
RUGGED &
RELIABLE
• 230 Voc
• 24V/48V/72V compatability
520-777-7906
18 S O L A R PR O | March/April 2016
Tight Deadline? Choose AET
[ ]
“We selected AET not only for their high quality
product, but because we knew they would meet our
strict deadline and still provide the level of engineering
and design support needed for this particular project,”
said George Hershman, VP and Division Manager of
Swinerton Renewable Energy.
Site Grading,
Landfill Deployments,
Bonding and Earthing, and
Mass Customization
20 S O L A R PR O | March/April 2016
Part 1: Site Grading and Design Optimization
By Samuel Laughlin and Bill Reaugh
W
hen developers consider a piece of land for a
large-scale ground-mounted PV power generation To Grade or Not to Grade
asset, the costs for grading and earthwork can be
significant drivers of project viability. The project developer’s Grading typically includes two major activities: cutting, the
or owner’s goals determine in part when, where and how process of removing quantities of soil, and filling, the process
much to grade. These decisions must also fit the requirements of building up quantities of soil. Ideally, the amount of soil
of the site with respect to AHJ controls and the mechanical imported to or exported from the site is near zero to reduce
limitations of the equipment the developer may use. both costs and environmental impacts.
The best approach to this puzzle is one that integrates a The needs and conditions of the land underlying the
holistic view for these requirements across multiple engineer- solar array structure make each project unique. Depending
ing disciplines, including civil, structural, electrical, mechani- on site conditions and construction requirements, a piece of
cal and geotechnical, and water resources. A few of the first land may need no preparation, minor surface clearing and
questions to ask are: How does the topography behave? Is grubbing of subsurface plant roots, smooth grading or full
the proposed equipment capable of dealing with the site in grading. Generally speaking, developers perform grading
its current state or are modifications required? If the requisite because the site requires it or because doing so will support
site modifications are significant, are there other solutions plant optimization.
that align better with the project’s financial goals?
solarprofessional.com | S O L A R P R O 21
Ground-Mounted Racking Considerations
GRADING REQUIRED
In certain circumstances grading is unavoid-
able. The most common reasons for grading
are to meet AHJ requirements or best prac-
tices for access roads or storm water man-
agement. Grading may also be required to
conform to vendor-specified mechanical
tolerances for the mounting system.
On-site access roads. AHJs and indus-
try best practices dictate minimum and
maximum slopes for access roads, as well
as compaction and surface maintenance
requirements. Grading is required where
C ou r te sy Blu e Oa k E n e r gy ( 2 )
the existing topography does not meet
these longitudinal or cross-slope require-
ments. While the local fire department typ-
ically has the final say on access roads, the
local building department or the site owner
may also have applicable requirements.
Storm water management. Site-specific
hydrologic characteristics are a critical
factor in determining grading require- Flood routing model Site designers can use software—such as FL0-2D, which
ments and plant design. If a site lies generated the results shown here—to model storm water flow over complex
in a flood zone, for example, the flood topography and thus help determine the optimal amount of site grading.
depth determines the minimum height
for electrical equipment. Storm-induced runoff and scour GRADING FOR OPTIMIZATION
affect minimum pile embedment depths. The contributing Site preparation impacts solar power plant optimization in a
watersheds and historical water flows may dictate deten- variety of ways. For instance, minimizing the amount of steel
tion basins or improvements to the existing storm water in the foundation or the time required to wash the modules
channels. Local environmental agencies may have require- can offer potential benefits. Maximizing the ground-cover
ments related to dust or water quality that impact these ratio (MW/acre) or specific energy yield (MWh/MW) can
grading activities. also yield benefits. Rather than focus C O N T I N U E D O N P A G E 2 4
Mechanical tolerances. In general, fixed-tilt mounting
systems are more capable of dealing with topographi- High and dry Designers should ensure that electrical equip-
cal changes across a site than are single-axis trackers. ment is above the reach of flood waters. AHJs may also
However, many large-scale ground-mounted systems use require the use of raised-earth pads for major electrical equip-
trackers to maximize energy production from the available ment, including substations, switchyards and transformers.
land area. Trackers have a maximum slope (% grade) asso-
ciated with the north-south axis of the torque tube and,
if applicable, the east-west elevation of the driveline.
Should existing slopes fail to accommodate the maximum
slopes of the torque tubes or drivelines, grading is one pos-
sible solution.
While tracker equipment manufacturers specify maxi-
mum slope values, installation guidelines or product data-
sheets do not always provide these design criteria. Instead,
some manufacturers provide a grading requirements docu-
ment or similar reference upon request that details civil engi-
neering needs for sites. This document provides information
about mechanical tolerances to help engineers determine
project-specific design criteria, including maximum slopes
and maximum and minimum pile elevations above grade.
22 S O L A R PR O | March/April 2016
SM SOLAR
MOUNT
SOLARMOUNT INTEGRATED BONDING ADVANTAGE
WITH SYSTEM GROUNDING THROUGH ENPHASE MICROINVERTERS AND TRUNK CABLES
UL2703
L I S T E D
BONDING & GROUNDING
MECHANICAL LOADING
SYSTEM FIRE CLASSIFICATION
CLASS A - TYPE 1, 2, 3 & 10 MODULES
UL2703
L I S T E D
BONDING & GROUNDING
MECHANICAL LOADING
SYSTEM FIRE CLASSIFICATION
OPTIMIZED COMPONENTS • INTEGRATED BONDING • PRE-ASSEMBLED PARTS
CLASS A - TYPE 1, 2 & 3 MODULES
O
ver the past 20 years, towns, municipalities and A capped landfill typically becomes an expense for the
other entities have closed and capped nearly 6,000 community, requiring annual maintenance and continual
landfills. Since the land at the majority of these sites monitoring. By leasing the land for PV project development,
is contaminated or contains remediated soils, they are not municipalities can recover maintenance and monitoring costs as
suitable for typical residential or commercial uses. However, well as generate revenue. Project developers also benefit because
these capped landfills can still provide value for municipali- these tracts of land are often offered at exceptionally low lease
ties as host sites for ground-mounted PV power plants. rates compared to land suitable for commercial development.
24 S O L A R PR O | March/April 2016
A lot has happened
since the 1970s
C ou r te sy Bor re go S ola r
Accelera® 220 E
58-gallon
heat pump water heater
Accelera® 300 E
80-gallon
heat pump water heater
Solid waste
solarprofessional.com | S O L A R P R O 25
Ground-Mounted Racking Considerations
concert with several layers of sand, soil and vegetation. A 12- these vents. To prevent gas from migrating into enclosures,
to 18-inch drainage layer and a 6-inch soil layer are commonly workers should locate electrical equipment away from land-
found above the liner. The thickness of these layers determines fill vents. Smoking is prohibited when working on a landfill.
the allowable bearing pressure on the liner. Vegetation control. Mowing is the most common form
A Standard Subtitle D Cover landfill cap provides allow- of routine landfill maintenance. If certain species of trees,
able temporary bearing pressures (for vehicular traffic) of up shrubs or brush are allowed to grow on the landfill, their
to 7 pounds per square inch (psi) and permanent bearing root systems will eventually penetrate the geomembrane
pressures of up to 5 psi. Allowable bearing pressures dictate liner. Regular mowing prevents this from happening. When
foundation designs for mounting systems and other equip- preparing a PV array layout for a landfill, designers need to
ment, as well as access road designs for plant construction understand and consider how maintenance personnel mow
and maintenance. Bearing pressure also determines what the site and ensure that all sections of the landfill remain
types of vehicles can safely operate on top of the landfill. accessible to the mowing equipment.
Since a damaged or punctured membrane would be costly Fencing. Many existing landfills are already fenced, and
to repair and would cause significant project delays, bearing some of these fences require only minor modifications
pressure is an extremely important design consideration. to comply with National Electrical Code requirements.
Storm water management. Landfills are designed to maxi- Unfenced landfills can present significant design and bud-
mize municipal solid waste storage capacity and therefore getary challenges. The landfill membrane often extends for
result in large dome-shaped plateaus with steep side slopes. many acres beyond the usable array area. Fencing this long
Given these terrain features and the minimal amount of perimeter is a costly and time-consuming proposition. More
cover material, storm water runoff is another critical PV often than not, project developers need to contend with
system design consideration. Landfills rely heavily on both wetlands located at the perimeter of the landfill that could
vegetation and drainage swales to manage storm water and require additional permits through local conservation com-
prevent erosion. It can be extremely costly and time con- mittees, extending the project mobilization timeline. If it is
suming to modify these existing storm water management not practical to build a conventional fence, system designers
features to accommodate a PV system. can consider adding a ballasted fence at the array boundary,
Gas vents. PV system designers also need to consider provided they factor the fence location into the array layout.
landfill maintenance features such as gas vents, settlement
plates and monitoring wells. It is especially important for PV SYSTEM CONSIDERATIONS
installers to pay attention to gas vent locations. Since a large After taking landfill design into account, project developers
percentage of the gas emitted from a landfill is either meth- need to adapt their PV system design and installation prac-
ane or carbon dioxide, workers in the proximity of a pas- tices to the site.
sive vent risk exposure to flammable gas or a zero-oxygen Build from the vegetation up. It is a good idea to hire a site
environment. Landfill gas can also contain ammonia and contractor who has experience with landfill closures or mak-
hydrogen sulfide, both of which can cause a variety of respi- ing landfill repairs. Given the minimal amount of material
ratory issues. Since landfill vents often emit odorless gasses, above the geomembrane liner, the most productive design
workers need to rope off vent pipes in close proximity to the and construction strategy is to build the PV system up from
PV array to ensure that no one accidentally gets too close to the vegetation layer. This means that the array foundations,
equipment pads, electrical infrastructure and access roads
Behind the fence A ballasted fence at the array perimeter is
are all installed above grade. The goal of this design approach
a good option for minimizing fencing costs on landfill projects.
is to maintain the existing protection of the cap and to pre-
serve the functionality of existing storm water controls.
Prior to commencing construction activities, an autho-
rized agent should inspect the existing landfill conditions
to ensure that both the gas vents and storm water controls
are intact and that no depressions due to settlement exist.
The developer needs to remedy any depressions under the
Co u r t es y B o r reg o S ol ar
26 S O L A R PR O | March/April 2016
BUILT FOR THE LONG HAUL
Reliable conversion efficiency for decades
Homeowners want a solar panel that yields the greatest
amount of electricity for the longest time. That’s precisely 36% MORE POWER GENERATION
where we focus our manufacturing process. Using ultra-thin
amorphous silicon layers, Panasonic HIT® absorbs and retains
more sunlight and produces up to 36% more electricity than
conventional panels.
Our new space-saving 330W and 325W panels set the standard
for long-term conversion efficiency. They employ 96 cells in STANDARD* STANDARD*
N330 N330
the same size footprint as standard 60-cell panels. That means
more output per square foot and fewer panels to install. HIT®: 9,167kWh/year Standard*: 6,716kWh/year
(15pcs x 330W = 4.95kW) VS (15pcs x 260W = 3.90kW)
Plus, our 15-year workmanship and 25-year output warranties
give homeowners iron-clad peace of mind that they’ve made NOTE: Panasonic’s simulation in CA, USA *Conventional crystalline module
Co ur te sy Bo r re g o So l a r
ideal to have a road entering one side of a landfill and exit-
ing the other, as this is beneficial for project logistics and
project velocity. At a minimum, PV designers need to pro-
vide a sufficient number of turnarounds to accommodate
construction traffic and material delivery.
Array layout. Designers determine the usable array area
flanking the access road based on the slope of the terrain Design criteria Designers can determine the size and
and the mechanical tolerance of the mounting system. Since shape of ballast blocks by considering soil bearing pressure
ballasted mounting systems are susceptible to sliding forces and design loads dictated by the local building code.
and constrained by the allowable bearing pressure on the
landfill cap, these systems are commonly limited to a 5°–7° bearing pressure. As an added benefit, cable tray remains
slope. Once designers have identified existing landfill fea- visible to the landscaping crew even when the grass grows
tures and areas with acceptable slopes, they can begin to lay tall between mowings, and physically protects the electrical
out the array, keeping in mind maintenance activities and cables from both mowers and string trimmers.
cap protection. Electrical equipment pad. As is the case with typical ground-
Mounting system selection. Developers also must con- mounted systems, centralizing the location of the inverters
sider differential settlement when designing this type of offers cost and performance benefits. The optimal location
system. As the landfill decomposes, the surface naturally is typically somewhere along the access road near the cen-
settles differentially due to the varying types of material ter of the array. The shoulder of the access road serves as
decomposing below. Landfills will settle 10–20 feet over a means of bringing in the medium- or high-voltage circuit
their lifetime, and settlement of 1 foot per year in the first to the distribution transformer from the point of common
years of closure is common. coupling. Since the road is subject to both vehicular traffic
To tolerate this settlement, designers should use a stati- and differential settlement, system designers generally call
cally determinate mounting structure that they can analyze for a reinforced concrete duct bank to protect these circuits.
using static equations of equilibrium to determine reaction Concrete equipment pads for landfill applications
forces. A structural design with two foundations per array may have to be quite large, given the extreme weight of
table that allows for future in-field adjustment is generally the electrical equipment and the relatively low allowable
best for withstanding settlement over the life of a system. bearing pressure. A typical 1 MW liquid-filled medium-
By comparison, a structural design with three or more foun- voltage transformer usually weighs more than 1,000
dations may be subject to intolerable stresses that result in pounds. In many cases, it makes sense to install a single
module deflection and possible destruction. reinforced concrete equipment pad that supports all of
Cable tray. Landfill projects have unique electrical infra- the equipment, rather than multiple smaller concrete
structure requirements in two ways: The design needs to pads, as the larger pad will save preparation and installa-
account for settlement, and the site has insufficient cover tion time. Using a single pad also protects the conductors
material to allow burial of conduit or cables. Since landfill against damage due to differential settlement, since the
applications require an above-grade solution, designers typ- single pad will move uniformly as a single unit.
ically specify cable tray. Cable tray comes in 10- or 12-foot System grounding. Opting for a single equipment pad also
sections that installers do not have to physically connect to provides a means for system grounding. Given the shallow
one another, so it can tolerate differential settlement, pro- depth of the landfill cover material, it is obviously not pos-
vided the conductors offer adequate slack. sible to install an 8- or 10-foot ground rod as a grounding
Each cable tray section generally has four independent electrode. Instead, a copper ground ring with supplemen-
height-adjustable feet, allowing for installation on uneven tal copper grounding plates typically offers adequate sys-
ground. The base area for these feet is often adequate to tem grounding. The thickness of the concrete pad, plus the
disperse the weight of the cable tray and conductors, as depth of the fill material beneath it, provide the burial depth
well as keep the point loads below the maximum allowable required for the ground ring.
28 S O L A R PR O | March/April 2016
Part 3: Bonding and Grounding
By Marvin Hamon, PE
T
o provide a safe PV system, designers impedance connection.
Integrated
and installers need to understand the Another way is to make
bonding Mount-
fundamentals of bonding and ground- a mechanical connection
ing systems listed
ing. Whereas proper bonding ensures that a by, for instance, bolting
to UL 2703 include
ground-mounted PV array is free from stray two pieces of conductive
integrated bonding
shock hazards for the life of the system, proper material together.
components—
grounding prevents dangerous voltage differen- Intent. As described
such as this self-
tials between the PV array and the ground on in NEC Section 250.4,
grounding clamp
which installers or service technicians stand. bonding establishes a
C ou r te sy S u n Mo do
from SunModo—
Since people often confuse these terms and low-impedance connec-
that have under-
practices, here I define each individually, con- tion between conductive
gone accelerated
sider its intent, and review hardware options equipment and materi-
lifecycle testing.
and installation methods. als to conduct fault cur-
rent safely and minimize
BONDING potential voltage differences between conductive compo-
Per the definition in Article 100 of the National Electrical Code, nents. By providing a low-impedance path for line-to-line or
equipment is bonded when it is “connected to establish elec- line-to-ground faults, the designer ensures that fault currents
trical continuity and conductivity.” Employing an equipment- quickly rise to a level that activates an overcurrent or ground-
grounding conductor (EGC) is one way to make this low- fault protection device.
solarprofessional.com | S O L A R P R O 29
_MountingSystems_1508.indd 1 7/23/15 8:59 AM
Ground-Mounted Racking Considerations
30 S O L A R PR O | March/April 2016
FREE
PV Commissioning and
Testing guidance book
and posters
Visit seawardsolar.com/solarpro
The all-in-one
PV test solution
Save yourself up to 40 minutes with the PV150, the only all-in-one PV
tester in the world. As a result, it’s lightning fast (Riso, Voc and Isc tests
in 5 minutes), intuitive, reassuringly safe when connected to live PV
systems and provides complete test traceability.
Visit www.seawardsolar.com/solarpro
or call 813-886-2775
Ground-Mounted Racking Considerations
Connection to earth Grounding electrodes—such as the very conservative for the purposes of PV array design. In most
ground ring beneath this inverter pad—establish a direct applications, a 10-gauge EGC is more than adequate.
connection to earth. To limit voltage to ground within a Table 250.122 also provides installers and inspectors
ground-mounted PV array, system designers can extend the with a convenient basis of comparison for UL 2703–listed
grounding electrode system or deploy auxiliary grounding PV mounting systems, which should be bonded at least as
electrodes throughout the array field. well as those bonded with an EGC. As a quick bonding test,
for instance, an installer could take a resistance reading
between two points in an array, such as between one row of
modules and an adjacent row. Assuming that these module
rows are 100 feet long and spaced 10 feet apart, the installer
should see a resistance reading equivalent to 210 feet of
10 AWG copper. According to NEC Chapter 9, Table 8, which
details conductor properties, a single-strand 10 AWG cop-
per conductor has a resistance of 1.21 mΩ per foot. So if
the row-to-row resistance measurement is in the vicinity of
254 mΩ (210 feet x 1.21 mΩ/foot), that suggests the equip-
ment is properly bonded. A significantly higher reading
means a poor mechanical connection somewhere in the
path probably needs correction.
Maintenance. It is not that difficult to create a good
electrical bond in a new mounting system. The challenge
is maintaining that connection over time in an outside
environment. This is precisely why PV designers need to
specify UL-listed equipment and assemblies, as UL prod-
uct safety standards define test procedures intended to
determine how bonded connections will age. While mea-
suring bonding resistance during system commissioning
C ou r te sy S tr a ta S ola r
GROUNDING
250.4(A)(5) or (B)(4), the equipment-grounding conduc- Per NEC Article 100, equipment is grounded when it is “con-
tor shall be sized larger than given in this table.” In other nected to ground [the earth] or to a conductive body that
words, choosing a conductor based on Table 250.122 is no extends the ground connection.” A grounding electrode
guarantee that the design will provide an effective path for establishes the actual connection to ground. A grounding
fault currents. However, the NEC offers no further guidance electrode conductor extends the ground connection to the
about how to upsize an EGC. EGC or the conductive equipment.
Engineers need to account for a number of variables— Intent. Grounding is sometimes referred to as earthing,
incident energy ratings, available fault currents, overcur- since it ensures that conductive equipment is at the same
rent protection device (OCPD) time-current characteristics electrical potential (voltage) as the earth. Eliminating volt-
and so forth—to ensure that a fault will not damage an EGC. age difference between ground and conductive surfaces such
Fortunately, the unique electrical characteristics of PV sys- as PV module frames and mounting systems mitigates shock
tems work in their favor. For example, the available fault cur- and fire hazards. As long as the aluminum frames and steel
rent in a PV array is much less than that from even the smallest racks, for example, are at earth potential, electrical current
utility service; the maximum fault current from a 500 kW PV will not flow to ground through a person who is installing or
array might be 1,000 A, whereas a 600 A utility service might servicing the array. In this scenario, the source of the voltage
easily have an available fault current of 50,000 A or greater. difference could be a cross-connection fault with another
Conductors can carry a high amount of current for a short power system—perhaps an overhead power line falling onto
time without incurring damage. Therefore, Table 250.122 is a PV array—or a lightning strike. Proper C O N T I N U E D O N P A G E 3 4
32 S O L A R PR O | March/April 2016
Ground-Mounted Racking Considerations
setup of a ground-mounted array prevents any shock to ser- or posts embedded in concrete. Designers can increase
vice personnel because they will never provide the best elec- the overall connection to earth in a ground-mounted PV
trical connection to earth. system by specifying a foundation with one or more posts
In the field. Normally an electrical system is grounded per array table or row of modules that qualifies as a ground-
at one point only: the point of supply. This connection to ing electrode.
ground might be located at the utility service entrance or Some in the PV industry feel that auxiliary ground-
on the secondary side of a transformer. The Code also requires ing electrodes can actually make a PV system less safe in
a connection to ground on the dc side of transformer-isolated areas prone to lightning strikes. When lightning strikes the
inverters. However, this single-point approach to ground- ground, localized voltage increases in the earth but nor-
ing can cause problems in large-scale ground-mounted mally dissipates over time. If there are auxiliary ground-
PV systems, where the farthest reaches of the PV array ing electrodes in the area of increased voltage, however,
may be located a great distance from the grounding elec- the voltage rise can cause current flow up one auxiliary
trode system. grounding electrode through the PV array and out the near-
While designers can extend the grounding electrode sys- est auxiliary grounding electrode that is at a lower voltage,
tem throughout the PV array with buried electrodes—as is which could put people or equipment in harm’s way. In a
done with substations—this is very expensive. Alternatively, grounding electrode system, the buried bonding jumpers
NEC Section 250.54 allows the use of auxiliary grounding that connect each of the individual grounding electrodes
electrodes, which do not have to comply with electrode- into a single system would carry this current below the sur-
bonding requirements. The steel foundation members often face of the earth.
serve as auxiliary grounding electrodes. Section 250.52 cov-
ers electrodes permitted for grounding. Ground-mounted PV [Editor’s note: For information on system grounding, which
array foundations may comply with Subsections 250.52(2) is a design consideration not covered here, see “Grounding
or (3), depending on whether the system uses driven piles Compendium for PV Systems,” SolarPro, April/May 2013.]
DURABILITY TEST
34 S O L A R PR O | March/April 2016
Part 4: Scalable Mounting Solutions
By Keith Beisner and Sara Jacobs
T
he increased rate
of solar adoption is
opening up new mar-
kets to solar providers and
ramping up project volumes.
Developers, EPC firms and
solar providers are seeing an
increased number of project
opportunities as well as a
wider range of project sizes
C ou r te sy A qu a S oli (2)
across their portfolios. In
addition, the solar industry’s
footprint is expanding into
all regions of the US, from the
remotest rural areas to the
tightest urban spaces.
Rapid market expansion Prepare for the unexpected Project developers can avoid costly delays by working with
means that solar solution pro- products that allow for interchangeable foundation options.
viders must streamline their
designs across a wide range of environmental conditions. Solar a range of optimal foundations. The key is to provide a range
installers have to be prepared to deal with variable surface and of standardized foundation options that developers can
subsurface conditions. At the same time, the industry is under easily interchange without having a negative impact on the
great pressure to lower costs. These realities require new solu- overall system design or aesthetics.
tions. Solar providers and EPC firms require a new generation If project developers discover the need for diverse founda-
of efficient, cost-effective solutions that enable them to better tions during the engineering design phase or preconstruction
react and adapt. pull tests, mass customization allows designers to optimally
specify different foundation types before construction starts.
MASS CUSTOMIZATION Often, though, EPC firms do not discover these soil variations
The key to making solar happen in more places while driv- until installation work is already in progress. When installers
ing costs down lies in having a mounting-system design that must quickly react to problems without a ready-made solu-
is centered upon built-in environmental adaptability, con- tion on hand, delays and escalating costs are the norm.
struction flexibility and predictable costs. Developing cus- Product designs that allow for swap-in foundation changes
tomized solutions on a site-specific basis is not a scalable can equip installers to make on-the-fly changes during con-
strategy. Instead, the industry needs racking systems com- struction without incurring high costs for replacement parts
posed of standard components that installers can assemble and project delays. For example, if installers hit a refusal while
in a variety of ways to meet each project’s unique challenges. driving a post on-site, they might quickly swap in a cast-in-
This mass customization approach will allow the industry place ballasted foundation on top of the soil while utilizing
to accelerate most rapidly because it is both highly configu- the same superstructure. Readily available and interchange-
rable and cost effective. able foundation options can help eliminate expensive in-field
Foundation design. Installers need different foundation modifications.
options to avoid costly delays caused by variable soil con- Mounting structure. When it comes to the racking struc-
ditions and unpredictable subsurface obstructions within a ture itself, mass-customized solutions provide design
project portfolio. To achieve economies of scale, however, it flexibility to accommodate project variations, including dif-
is essential that these foundation options be part of a stan- ferent modules, terrains, and wind or snow loads. Although
dardized product solution. Taking the need for foundation 72-cell modules are the de facto standard on ground-mount
flexibility a step further, soil conditions can vary dramati- projects, each module frame has its own distinct set of
cally within a site, meaning even a single project may require mounting dimensions. Mounting systems that are adaptable
solarprofessional.com | S O L A R P R O 35
Co ur te sy D CE So l a r Ground-Mounted Racking Considerations
Terrain following Mounting systems with terrain-following capabilities may enable project developers to cost-effectively
deploy PV systems on marginal sites.
to different modules without component modification elim- growth factors place a high demand on materials, mass cus-
inate the need for last-minute change orders. tomization also streamlines supply chains. It allows companies
Similarly, standardized products with terrain-following to inventory components and reduce lead times. It accommo-
capabilities reduce not only site preparation and installa- dates short-notice schedule or design changes. This adapt-
tion time, but also PV system cost and complexity. In recent ability is critical to companies with aggressive and sometimes
years, the scope of projects has grown to include not only simultaneous or competing construction schedules.
flat, level and prepared sites but also more-challenging Furthermore, the ability to use the same system and
sites with undulating slopes or hilly terrain. Mounting sys- components on all sites, regardless of environmental and
tems that installers can deploy without making major site site conditions, allows installers to implement best prac-
improvements or modifications can reduce preconstruction tices more consistently and can dramatically improve
civil work and improve project economics. installation efficiencies. On-site crews learn to quickly trou-
As solar projects expand into regions with higher wind bleshoot unpredictable situations and implement rapid, cost-
and snow loads, mounting systems must also adapt to effective mitigation solutions while also reducing punch
these environmental conditions. Standardizing products lists and mitigation work.
to accommodate higher loads without the need for custom With the combined advantages of mass customization,
components simplifies both the design and the supply chain solar providers gain maximum efficiency and achieve econ-
processes. This simplification allows optimal project deliv- omies of scale across projects of all sizes. Mass customiza-
ery timelines and improved cost efficiencies. tion reduces costs and allows rapid growth in nonresidential
Soft costs. Beyond material costs, mass customization markets where ground mounts are typically deployed. The
also shaves project soft costs. Many developers and custom- result is more successful solar projects and a faster technol-
ers are seeking better-integrated electrical and mechani- ogy adoption trajectory.
cal designs across their project portfolios. Mounting
solutions with standardized table sizes—such as two-high g C O N TAC T
in portrait configuration—make this integration possible.
Keith Beisner / SunLink / San Rafael, CA / keith.beisner@sunlink.com /
Different foundation configuration options, meanwhile, can
sunlink.com
accommodate changing environmental factors while keep-
Marvin Hamon / Hamon Engineering / Alameda, CA /
ing other variables, including table size and mechanical
mhamon@hamonengineering.com / hamonengineering.com
and electrical components, consistent across multiple proj-
ect sites. Standardizing these mechanical and electrical Sara Jacobs / SunLink / San Rafael, CA / sara.jacobs@sunlink.com /
design processes can lower costs and increase engineering sunlink.com
efficiency while allowing for easy preparation, installation Samuel Laughlin / Blue Oak Energy / Davis, CA / sam@blueoakenergy.com /
and O&M. blueoakenergy.com
Bryan Morrison / Borrego Solar / Lowell, MA / bmorrison@borregosolar.com /
THE DOMINO EFFECT borregosolar.com
A domino effect begins to take place when product design and Bill Reaugh / Blue Oak Energy / Davis, CA / bill@blueoakenergy.com /
engineering become more efficient. Solar providers, large and blueoakenergy.com
small, can take on more projects in more locations. While these
36 S O L A R PR O | March/April 2016
What’s in YOUR Project?
Did you know that nearly 25% of all solar electricity in North America
flows through a SolarBOS product? Ever wonder why?
38 S O L A R PR O | March/April 2016
creation of online solar energy exchange platforms such as
the sonnenCommunity.
A similar scenario occurred in Australia, which has the
highest penetration of residential solar combined with
incredibly high utility peak pricing between 3 pm and 8 pm
daily. Storage is key to enabling Australian customers to
increase their consumption of solar energy and decrease
the amount of energy they require from the utility grid in
the waning afternoon hours, maximizing the use of solar
energy and minimizing the need to use high-cost energy
from the grid.
The US market is following a similar pathway to increas-
ing distributed energy resources (both renewables and
storage) and is undergoing the same uncertainty around
the future of energy costs and policies. With the influx of
renewables, grid operations, power markets and financial
structures will need to evolve to take these new energy
sources into account. Smart energy storage provides flex-
ibility for customers and utilities to evolve in the face of
changing feed-in tariffs, energy storage and renewable
energy incentives, utility-rate tariffs and use cases for dis-
tributed resources.
—Greg Smith, senior technical trainer, sonnen
solarprofessional.com | S O L A R P R O 39
Self-Consumption
becomes significantly lower than the cost of grid-supplied Curtailment Changes to Germany’s feed-in-tariff drove the
energy. By consuming self-generated PV energy, customers development and deployment of self-consumption systems.
can reduce their energy bills, resulting in amortization of Outside the US, SMA offers both grid-direct and ac-coupled
the investment for the PV system and profits from the sub- battery-based power electronics for PV installations with
sequent savings. Due to low PV system cost, amortization energy curtailment requirements.
periods have become reasonably short, so customers can
realize direct savings within a foreseeable timeframe. This is
the main driver for self-consumption in these countries. In
countries or US states where net metering still is a common
way of benefiting from PV generation, the drive for increased
C ou r te sy S M A S o l a r Te c hno l o g y
or enhanced self-consumption remains low.
—Martin Volkmar, product manager, energy management
solutions, business unit residential, SMA Solar Technology
40 S O L A R PR O | March/April 2016
Measure and Maximize your
Starts
$.079/w
solarprofessional.com | S O L A R P R O 41
Self-Consumption
What additional components and software are and the battery bank. These multiport inverters eliminate
required for nonexport or curtailed residential an entire piece of equipment and the associated cost of
PV systems with energy storage? purchase, installation and maintenance. These advanced
Is this equipment certified and available inverters must integrate the ability to change modes—from
in the US market? What are the basic modes a current-source grid-following device to a voltage-source
grid-forming device—based on the presence of the grid. This
of operation for these systems? new generation of devices is either just entering or will soon
be entering the US market. 2016 will be a big year for “Euro-
There are generally two approaches for integrating storage style” self-consumption equipment.
into PV systems, whether for backup or for self-consumption —Wes Kennedy, Fronius USA
applications. One is the new application of older, established
technologies, which generally rely on two separate devices to With intelligent connected energy storage and advanced
manage either the PV or the battery bank. In ac-coupled sys- inverters, JuiceBox stores excess energy and shifts it for use
tems, the two devices are inverters, one for the PV array and in the evening when PV generation is low and homes have
one for the battery bank. In dc-coupled systems, a PV control- the highest load. JuiceBox Energy is one of a handful of
ler regulates the battery charge, and an inverter uses energy products that are certified for this application and already
stored in the battery to run loads. These systems have evolved installed in the US.
over the last 10-plus years, primarily from the off-grid market, —Neil Maguire, CEO and founder, JuiceBox
and have integrated increasing intelligence to meet the new
demands of grid-tied applications. They have been available With a SolarEdge system, the integrator needs to install
for many years. an energy meter and upgrade the SolarEdge dc-optimized
What I find particularly exciting are the new generation inverter to a StorEdge inverter. These components are all
of hybrid inverters that interface with both the PV array certified. Once installed, the inverter runs in one of four
JUST ADD
WATER
Solar Pumping Systems
Your new revenue stream. Harness the power of the sun to provide water wherever
your customers want it with Franklin Electric’s proven and dependable solar water
pumping systems. Need a drilling or pump installation expert? No problem.
Contact our Technical Service Hotline at 800.348.2420 to be connected with our
expansive network of water systems professionals that you can team with today.
franklinwater.com
42 S O L A R PR O | March/April 2016
3365 Heyco 3.4x9.6_Layout 1 5/27/15 10:42 AM Page 1
Heyco ®
Wire Management
modes of operation: self-consumption, load management,
limited power production and, if there is a battery, storage. Solutions for Solar
—Peter Mathews, SolarEdge
Installers & Integrators
I am not aware of any storage system specifically certified
for nonexport as there is no applicable US certification
standard. This is a major obstacle for the installation of self-
consumption systems in the US. Without certified nonex- HEYClip™ SunRunner® Cable Clips
port products, utilities may require that integrators install a Double-Compression Design for (1) 12 gauge
USE-2 to (2) 10 gauge PV-1000V wires.
certified reverse-power relay between the PV energy storage
Cables from .20˝ (5,1 mm) to .30˝ (7,6 mm)
system and the grid. However, this is usually cost-prohibitive dia., and frames up to .125˝ (3,2 mm) thick.
for residential systems ($6,000–$10,000 per relay). Now available in 316 Stainless Steel.
—Kent Sheldon, Greensmith Energy Management Systems
HEYClip™ SunRunner® 90°
The zero-export application is a built-in feature of the sonnen- Cable Clips
Batterie system. Sophisticated management control soft- Mounts at 90° angle to the original
ware is the key to managing residential PV-plus-storage for SunRunner, holds a single cable from
.20˝ (5,1 mm) to .30˝ (7,6 mm). For use with
any energy profile in a smart home. The sonnenBatterie’s PV modules mounted in “Landscape” Mode.
energy manager control software uses past household energy
patterns (including energy generation and usage, time of HEYClip™ SunRunner® EZ™
day and historical weather data) in combination with self- Cable Clip
learning forecasting software to predict usage and generation Double-Compression Design for up to
at the home, and then manages solar-plus-storage accordingly. two (2) wires .20˝ (5,1 mm) to .30˝ (7,6 mm),
For example, if the software predicts that excess solar gen- and panels up to .250˝ (6,4 mm) thick.
eration will occur during a low usage period, the energy man-
HEYClip™ SunRunner 4™
ager will shed capacity in the battery ahead of time to absorb
Cable Clip
the excess solar peaks. Additionally, the sonnenBatterie sys-
Double-Compression Design for up to (4)
tem uses smart-home technology that can monitor large-load 12 gauge USE-2 or (4) 10 gauge PV-1000V wires,
household appliances such as washing machines, pool pumps and racking systems up to .250˝ (6,4 mm) thick.
and dishwashers. If the storage system is at a maximum state
of charge and the system is still generating energy, the energy HEYClip™ SunRunner® 2,
manager will automatically operate the smart-plug–enabled 2-R, and 2-U Cable Clips
appliances using the excess solar. Finally, sonnen products To hold Micro-Inverter Cables .413˝
have the capability to control the inverters on the PV sys- (10,5 mm) to .472˝ (12,0 mm) dia. on
tem (only after fulfilling household usage, storage usage and mounting frames and racking systems.
smart-plug appliance usage), which allows for reduced gen-
eration when needed, ensuring that excess solar does not get HEYClip™ Nylon UVX* SunRunner® 2
NEW
back-fed into the grid where prohibited. Series Cable Clips
To hold Micro-Inverter Cables .413˝
The sonnenBatterie is available today. The product
(10,5 mm) to .472˝ (12,0 mm) dia. on
houses the battery inverter, lithium-ion batteries, 200 A mounting frames and racking systems.
automatic transfer switch and other components inside *Extended UV Protection
a single unit with a separate meter outside the enclosure.
These energy storage systems meet all the required specifi- For FREE samples or product literature,
cations currently in the marketplace, including UL 1741, UL call toll free 1-800-526-4182, or visit heyco.com
1973, UL 1998 and are developed to meet UL 9540 standards.
The sonnenBatterie has two basic modes of operation:
self-consumption and backup modes. These are critical
modes for any residential energy storage system that pro-
vides zero export and PV curtailment. The sonnen energy w w w. h e y c o . c o m
storage system can also support multiple applications in “Stay Connected with Heyco” Power Components
one system, including solar self-consumption, emergency
Box 517 • Toms River, NJ 08754 • P: 732-286-4336 • F: 732-244-8843
backup, off grid, rate arbitrage, demand-charge reduction
solarprofessional.com | S O L A R P R O 43
Self-Consumption
C ou r te sy F ron iu s
deeply they want to discharge the battery. In GridZero
mode, the inverter never uses the grid to charge the
battery, ensuring that solar always recharges it. In
combination with OutBack Power’s EnergyCell Nano
Carbon advanced lead-acid batteries optimized for Euro-style Fronius developed multiport hybrid inverters, such
partial state of charge applications, GridZero and as its Tesla-compatible Symo Hybrid, as well as an energy meter
solar can deliver reliable energy at a fraction of the and system monitor for the European self-consumption market.
retail utility rate in areas such as Hawaii. In addition, Fronius’ initial storage-based self-consumption system for the US
customers can also use the Radian and FXR under market uses its single-phase Primo Hybrid inverter. Availability is
Hawaii’s zero-export (momentary parallel track) pro- projected for late 2016.
gram, which eliminates interconnection hassles, mini-
mizes solar fees and maximizes customer independence system, and replacing it with another solution will always
and autonomy. Both the Radian and FXR inverters are fully add to the system cost.
certified to UL 1741 and IEC 62109 as multimode inverters —Marvin Hamon, PE, Hamon Engineering
for both US and international markets.
—Philip Undercuffler, OutBack Power Technologies NEM is under review in nearly every state, and I have
mixed feelings about the attacks on it. In the short term,
The SMA solution, including the Sunny Home Manager, sup- it’s a simple regulatory incentive to increase distributed
ports PV systems with ac-coupled battery storage systems. PV. However, to step back a little, it is true that as PV pen-
In curtailed systems, batteries give the benefit of storing PV etration levels increase, the utility has increased problems
energy, which the system would otherwise need to dump. At maintaining grid integrity. PV system owners surely want
times of no sun, the user can supply the load with the bat- the grid to be there when the sun isn’t shining, so the utility
tery-stored energy. has to maintain the infrastructure as though PV isn’t there,
—Martin Volkmar, SMA Solar Technology while conversely having the flexibility to reduce grid pro-
duction when PV generation is high. In addition, there is a
What is your perspective on regulatory changes basic disconnect between PV production and load, as illus-
impacting net energy metering in US locations trated by the fabled “duck curve” in California, where the
utility has to go from very low midday production, driving
such as Hawaii and Nevada? wholesale markets for power negative, to the main peak of
Are these changes driving the deployment the day at 6 pm, a huge swing comprising GWs of capacity
of self-consumption PV systems? in a very short period of time. All this is to say that NEM
doesn’t accurately reflect the utility costs of maintaining
If a self-consumption system is the only way to install grid- the grid’s stability. At some point, the utility rate structure
tied PV and the financials come out positive, then people should become transparent to the end users, with pricing
will continue to install systems. From the point of view of the based on the actual stressors on the grid. This transpar-
customer, NEM is a free and 100% efficient energy storage ency will drive innovative approaches to distributed PV,
44 S O L A R PR O | March/April 2016
create an incentive for storage, and generally result in a without compensation, when the utility rates justify the price
more robust, flexible and resilient grid. of the self-consumption system.
—Wes Kennedy, Fronius USA —Kent Sheldon, Greensmith Energy Management Systems
Changes in NEM are driving a movement toward self- Stability in regulatory frameworks and permitting guidelines
consumption. NEM was great for kick-starting the solar for jurisdictions are beneficial to the entire energy industry.
industry and has helped create 200,000 jobs in this country. They allow the industry to drive efficiencies, lower costs and
However, when PV penetration climbs as it has in Hawaii, help create a framework that enables stakeholders to coex-
significant numbers of people are essentially not paying for ist and build their respective businesses. Grid operators and
the luxury of being connected to the grid. It is fair for the utilities need to consider the increasing challenges that the
owner of a solar home to pay a reasonable fee for trans- growing deployment of renewables poses. However, they need
mission and distribution assets, but the solar homeowner to address these challenges in ways that allow the use of tech-
should not have to pay a tax to maintain aging fossil fuel nological solutions to mitigate these effects. Changes in NEM
generation assets. and retail rates in places such as Hawaii and Nevada have
—Neil Maguire, JuiceBox people looking for alternatives and better ways to increase
self-consumption of renewables, which is where storage plays
Changes to NEM will probably increase the deployment of self- a key role. As seen in Germany, changes in tariffs will drive
consumption PV systems in the future, but not until the electric self-consumption and therefore increase the deployment of
utilities start imposing and enforcing caps on the total amount right-sized solar systems and solar systems with energy stor-
of export-generating grid-connected distributed energy age. Deploying distributed battery storage on the grid will also
resources (DER). I do not anticipate customer self-supply, as mitigate the challenges of large load and intermittent genera-
it’s called here in Hawaii, taking off for several years until the tion sources, helping grid operators and regulatory entities
utilities close the door to export-generating DER. operate a more stable grid.
—Marco Mangelsdorf, president, ProVision Solar —Greg Smith, sonnen
solarprofessional.com | S O L A R P R O 45
Self-Consumption
These tariff changes have created a different set of economic Ideally, as regions approach higher percentages of dis-
incentives for owners of many home solar systems that will tributed generation, forward-looking utilities and utility
make energy storage systems more attractive to a segment of commissions will create vibrant new markets in which
consumers. For most consumers, even where available solar distributed energy resources can participate by shifting
levels are quite high, storage is a vital component of a reli- loads and generation to balance supply and demand while
able self-consumption system. providing ancillary services. Hawaii’s PUC envisions creat-
—Stu Statman, vice president of engineering, Sunverge Energy ing such a market, but has yet to concretely establish it.
Nevada’s restructuring of the social contract without con-
Successful campaigns against solar are increasingly embold- sideration of grandfathering existing systems creates mas-
ening utilities. They quickly adopt the language and tactics sive disruption by gutting the economics of installed solar.
that have proven successful in other regions, while the solar Utilities in both states underestimate how easy it is to cut
industry has not effectively countered the argument of a sup- the cord today. As consumers do the math, adding the base
posed cost shift from solar customers to other ratepayers. charges, minimum bills, taxes and other fees to the volu-
NEM is an accounting agreement that removes transactional metric rates, and compare that to independent solar, we’re
friction by assuming all energy has the same value, whether seeing a shift beyond load defection to outright grid defec-
bought or sold. The truth is that energy doesn’t always have tion driven by pure economics, with a sprinkle of American
the same value. We are already seeing negative midday whole- independence on top.
sale pricing in California’s energy market due to the imbal- —Philip Undercuffler, OutBack Power Technologies
ance of load and generation, and the utilities point to this as
proof that solar is overcompensated. However, the converse is The absence of net metering, and penalties for feeding PV
also true. NEM undervalues solar by disincentivizing energy power into the grid, create a strong motivation to use self-
time-shifting or of delivering it as higher-value kW instead of generated power directly or store it locally.
volumetric kWh. —Martin Volkmar, SMA Solar Technology
ENGINEERED
FOR RE L I A B I L I T Y
NEMA Type 4X Nonmetallic Enclosures & Premium Accessories
Allied Moulded’s nonmetallic enclosures serve hundreds of industrial applications all
over the world. Offering a wide range of styles, sizes and factory modifications to meet
all your critical requirements, from pump control to instrumentation applications,
Allied Moulded’s enclosures provide the equipment protection and environmental
e r g l ass
ib
resistance you demand! Features of our nonmetallic enclosures include:
F
Available
Materials
• Non-corrosive
• Non-corrosive • •Non-conductive
Non-conductive • •Temperature
Temperatureresistant
resistant
te
ol
P
y c arb o n
a
Fireresistant
• Fire resistant • Lightweight • •Many
Manymounting
mountingconfigurations
configurations
•• 316
316 stainless
stainless steel
steel hardware
hardware • Continuous
• Continuous hinge hinge
• Dependable
• Dependable gasket systems
gasket sealing sealing systems
46 S O L A R PR O | March/April 2016
Do self-consumption requirements limit There is a difference between rate structures that encourage
the maximum value that distributed self-consumption and regulations that mandate no export to
PV generation can provide to utilities and the grid. To maximize the value of distributed PV and stor-
age, the technology should support the ability for consumers
regional transmission grids?
to opt in to demand response and other utility-run programs
with a share of the value. In some utility territories, JuiceBox
It depends on whether the utilities and regional grids attach Energy systems interconnect with an allowance for export.
any value to distributed PV in the first place. Many see it as Once the utilities define the residential demand response
a cost and not as a value generator. If they view it as a cost, programs, customers can immediately opt in without any
then self-consumption simply lowers their cost. reworking of the physical interconnection.
—Marvin Hamon, PE, Hamon Engineering —Neil Maguire, JuiceBox
I am a big believer in incentives rather than absolutes. A require- A utility open to working with the PV industry allows the
ment for self-consumption, such as zero sell-back, is a knee-jerk creation of multiple value streams from PV systems coupled
response from a panicked utility. The networked grid, with an with storage. For example, demand management, time-of-
unbundled utility rate structure and open protocol communica- use shifting and voltage regulation programs can create
tions, will allow the birth of the prosumer: the producer and con- value for both homeowners and utilities.
sumer who will be able to buy and sell not just kW but a whole —Peter Mathews, SolarEdge
host of grid support features in real time. This increases the reli-
ability and resiliency of the grid, enables the smart grid of the Storage systems increase the value to utilities and trans-
future, and moves us toward the big picture goal of 24 hours of mission operators by offering them the ability to provide
sun—a planet running on a 100% renewable energy basis. real-time, truly distributed ancillary services—including
—Wes Kennedy, Fronius USA frequency regulation, frequency and voltage droop control,
䌀䰀䔀䄀一 䔀一䔀刀䜀夀 匀吀伀刀䄀䜀䔀
䘀伀刀 䄀 一䔀圀 䜀䔀一䔀刀䄀吀䤀伀一 吀䠀䔀 䰀䄀匀吀 䈀䄀吀吀䔀刀夀
夀伀唀ᤠ䰀䰀 䔀嘀䔀刀 䈀唀夀⸀
伀瘀攀爀 愀 挀攀渀琀甀爀礀 愀最漀Ⰰ 吀栀漀洀愀猀 䔀搀椀猀漀渀 昀漀甀渀搀 愀
戀愀琀琀攀爀礀 搀攀猀椀最渀 琀栀愀琀 栀攀 挀漀渀猀椀搀攀爀攀搀 琀漀 戀攀 渀攀愀爀氀礀
瀀攀爀昀攀挀琀⸀ 吀漀搀愀礀Ⰰ 䤀爀漀渀 䔀搀椀猀漀渀 椀猀 瀀爀漀甀搀 琀漀 漀昀昀攀爀 愀渀
甀瀀搀愀琀攀搀 瘀攀爀猀椀漀渀 漀昀 琀栀椀猀 椀渀挀爀攀搀椀戀氀攀 搀攀猀椀最渀 琀栀愀琀 椀猀
猀瀀攀挀椀昀椀挀愀氀氀礀 洀愀渀甀昀愀挀琀甀爀攀搀 昀漀爀 刀攀渀攀眀愀戀氀攀 䔀渀攀爀最礀
猀礀猀琀攀洀猀⸀
一椀挀欀攀氀 䤀爀漀渀 ⴀ Ⰰ 挀礀挀氀攀猀 漀爀 ㌀ 礀攀愀爀猀
䰀䤀吀䠀䤀唀䴀 䤀刀伀一 䰀椀琀栀椀甀洀 䤀爀漀渀 ⴀ 㔀Ⰰ 挀礀挀氀攀猀 漀爀 㐀 礀攀愀爀猀
刀攀猀椀搀攀渀琀椀愀氀 愀渀搀 䌀漀洀洀攀爀挀椀愀氀 䄀瀀瀀氀椀挀愀琀椀漀渀猀
圀漀爀欀猀 眀椀琀栀 攀瘀攀爀礀 洀愀樀漀爀 椀渀瘀攀爀琀攀爀 愀渀搀
挀栀愀爀最攀 挀漀渀琀爀漀氀氀攀爀
㈀Ⰰ ㈀㐀Ⰰ 愀渀搀 㐀㠀 嘀漀氀琀猀
椀渀昀漀䀀椀爀漀渀攀搀椀猀漀渀⸀挀漀洀
㜀㈀ ⴀ㐀㌀㈀ⴀ㘀㐀㌀㌀
眀眀眀⸀䤀爀漀渀䔀搀椀猀漀渀⸀挀漀洀
一䤀䌀䬀䔀䰀 䤀刀伀一
solarprofessional.com | S O L A R P R O 47
Self-Consumption
power-factor correction, and volt and VAR support—much Load following OutBack
faster than traditional spinning generation. Market mecha- Power’s Radian (shown here)
nisms will need to be in place to provide incentives for end and FXR inverters’ GridZero
users and developers to offer these services to the grid. ac-input mode provide a load-
—Kent Sheldon, Greensmith Energy Management Systems following self-supply profile,
where the inverter operates in
Self-consumption requirements do not limit the value dis- parallel with the grid and views
tributed PV generation can provide to the grid. Aggregation loads as an opportunity to
of the excess energy generated by distributed systems can displace grid power with site-
provide large-scale renewable energy to the grid. By deploy- generated solar energy.
ing decentralized large-scale PV-plus-storage systems,
utilities can relieve high-congestion areas and reduce inter- infancy. With the Supreme
ruptions in service without using peaker plants, which are Court’s ruling reaffirming
costly to build and operate. Distributed energy storage FERC 745, the tools are going
C ou r te sy Ou tBa c k P owe r
resources are capable of providing additional services such into place to create a market
as frequency regulation, grid management and balance where customers can manage
demand response to bolster the grid without requiring large their generation and load in
capital investments on the part of utilities. Finally, additional response to pricing signals,
distributed PV with storage deployments gives the utilities thereby increasing the utiliza-
renewable resources to fulfill customer load demand while tion of the grid while return-
helping them meet mandated clean energy goals. ing a profit.
—Greg Smith, sonnen —Philip Undercuffler, OutBack Power Technologies
Self-consumption systems aren’t for everyone. There are a Systems such as the Sunny Home Manager provide an inter-
variety of reasons why solar owners may choose to remain face to utilities and distribution network operators who can
connected to the grid. Distributed PV offers great long-term regulate the PV curtailment limit via direct data connection.
value to both consumers and utilities through the aggregation In such cases, PV plant owners may receive reimbursement
of individual systems into virtual power plants (VPPs). These for their contribution to grid stability, in the form of incen-
VPPs increase grid reliability, provide efficient distribution of tives or monetary benefits.
locally generated power and reduce the need for utility invest- —Martin Volkmar, SMA Solar Technology
ment in additional large-scale generation. This offers eco-
nomic upsides to both PV owners and the local utility. What is your perspective on grid defection?
—Stu Statman, Sunverge Energy Do you think this form of self-consumption will
The answer depends on whether you consider self-supply
gain traction in certain markets?
systems a means to an end or a step along the path of mar-
ket evolution. An imperfect analogy is cell phones. At first It will gain traction if the PV financials are favorable to own-
they were simply an alternative to hard-wired communi- ers and if utilities continue to create an environment that
cation. With the advent of smart phones, they became promotes it. Overall, grid defection and load defection is not
indispensable in day-to-day life, and using them for phone the direction we should be going in to increase our use of
calls is almost tertiary. Today, self-supply systems provide renewable energy; but if utility resistance to distributed PV
a powerful tool for increasing the ratio of energy indepen- continues, it will become a more viable option. I anticipate
dence, but they are essentially an electronic check valve— requirements where residential customers either cannot
they allow energy flow in only one direction. To maximize disconnect from the grid, as exist in Florida, or have to pay
the effectiveness of the grid infrastructure, especially in an exit fees that make leaving the grid a costly decision. Exit
increasingly decentralized grid, we need to balance supply fees are already common for commercial customers.
and demand. Intelligent inverters with energy storage and —Marvin Hamon, PE, Hamon Engineering
generation can provide a powerful tool to deliver bidirec-
tional energy flow of both generation and load when it’s Grid defection is an emotional response rooted in frustration
most valuable. The tools exist, but the market and pric- with utility policy. Producing all your own power 24 hours a
ing signals to properly reward participation are in their day, 365 days a year is a big job and isn’t easily compatible
48 S O L A R PR O | March/April 2016
with the typical modern lifestyle. Hawaii is probably the many cases producing and storing all the energy they need.
easiest place in the US to do so, but even Hawaii has clouds. However, to be fully disconnected from the grid does incur
Do we really want backup generators running all over the added costs and lifestyle changes.
islands when a storm rolls through? The Rocky Mountain —Peter Mathews, SolarEdge
Institute differentiates between grid defection (cutting the
cord) and load defection (reducing the reliance on the grid). This seems to be a universal fear of most utility companies.
Most folks will want to build out their solar-plus-storage sys- They are suffering from allowing various companies to get
tem yet remain connected to the grid, as long as the utilities between them and their customers with PPA contracts. Now
wise up and don’t institute punitive shortsighted rate struc- they are overreacting to the prospect of PV plus storage, which
tures that drive distributed solar off the grid. could enable their customers to disconnect and become their
—Wes Kennedy, Fronius USA own utility companies. Unless utilities dramatically increase
their general service charges, it would be foolish to isolate
We hear from a lot of people who don’t like their utilities and your property from the option of maintaining access to con-
want to take their 4,000-square-foot home with dual air con- venient utility power via an infrastructure that is already in
ditioning units off grid. These homes can consume 100 kWh place. I prefer to think of the utility service as a cheap backup
per day. In this scenario, the answer is not to couple solar with generator when there isn’t enough PV generation or when
massive storage or to add a large dirty gas generator. The best there is a problem with your distributed generation system.
solution is typically to stay grid tied and to add solar and stor- I do think this form of self-generation will become pop-
age for self-consumption and critical emergency power. ular in markets with extremely high utility-tariff rates. We
—Neil Maguire, JuiceBox are already seeing demand grow in many island markets,
including Hawaii. In some markets, the local governments
It’s a hell of a lot of hype and spin at present. In the near term are incentivizing relatively small, isolated village power sys-
at least (6–36 months), formerly grid-tied, battery-based off- tems rather than funding expensive transmission projects to
grid systems will be very few and far between, at least in my serve remote villages. Some village power projects have suc-
market in Hawaii. cessfully integrated PV, wind, batteries and backup genera-
—Marco Mangelsdorf, ProVision Solar tors. These applications are becoming more commonplace,
given the reduction in PV and battery prices, combined with
Today, off grid is only a small the increase of utility power prices.
part of the US PV market. It —Kent Sheldon, Greensmith Energy Management Systems
is still more cost-effective for
homeowners to stay connected Grid defection is happening on a small scale. Now that the stor-
to the grid and to use the PV and age technology exists to increase self-consumption, customers
grid resources interchangeably. have greater control over their energy choices. In certain mar-
With combined PV and storage, kets such as Hawaii, self-consumption will increase because the
homeowners can increase their right technology and tariff structures exist. In addition, smart
level of energy independence, in storage in combination with solar generation allows custom-
ers a real option to go completely off grid in regions where grid
Integrated sonnen initially services are cost-prohibitive or unavailable.
developed its sonnenBatterie —Greg Smith, sonnen
for the German self-consump-
tion and backup market, but Self-consumption works for some consumers but not for oth-
the company recently intro- ers. So many factors affect that decision, which is driven largely
duced a UL-listed version for by economic considerations but also by practicality and reli-
US applications. The product’s ability. There will be an increased deployment of intelligent
software uses past household systems that can be effectively aggregated into virtual power
energy patterns (including plants and that offer economic benefits and increased reliabil-
energy generation and us- ity on both sides of the meter. These systems will become an
age, time of day and historical important factor in the self-consumption decision.
Co u r t e s y s o n n e n
solarprofessional.com | S O L A R P R O 49
Self-Consumption
T
he 6.4 MWdc MGM Phase I solar project at the operators to open one main and close the tie. In this condi-
Mandalay Bay Convention Center offsets a signifi- tion, if the solar feeder remains on, the PV plant could export
cant portion of the convention center’s electrical load. generated power through the unmetered left main. This would
While the facility uses more power than the solar plant can result in a contractually unacceptable situation. To eliminate
generate, contractually the Mandalay Bay property must use the possibility of any power back-feeding onto the grid, install-
all the power generated from the PV plant. Consequently, the ers added interlocks that require isolation of the solar feed
project team installed multiple safeguards to ensure that solar before operators can close the tie switch.
generation would not back-feed into NV Energy’s system. The The difficulty was adding the interlocks without impact-
project also required that Mandalay Bay would not experience ing the power flow to Mandalay Bay. A creative key interlock-
a power outage during system interconnection and commis- ing system avoided even a momentary power outage. The
sioning. Project partners NRG Renew, MGM Resorts and team installed a system of two locks and one key on the solar
Eaton worked together to develop a solution. feed and tie switch. The new lock on the tie switch physically
To meet the nonexport power requirement, the team blocks access to the existing lock, which requires a key from
installed metering at the point of connection between NV Energy one of the main switches to enable closure of the tie.
and Mandalay Bay. This interconnection point is located at one The team also installed a relay system at the solar plant
end of a 12,470 V main-tie-main system. Normally, both mains switchgear and the main point of interconnection. This sys-
are closed and the tie is open. A system of three locks and two tem allows NRG, Mandalay Bay and NV Energy to monitor
keys ensures sequencing, allowing closure of only two of the and control features in real time. If the solar power output
three switches at one time. The new and existing switches are reaches 92% of the load, a curtailment feature in the relay
Eaton metal-enclosed switchgear (15 kV). system forces an automatic reduction in PV power output. If
The PV system feeds into the switchgear connected to any issues arise, that activates alarms, and NV Energy, NRG
the (previously spare) switch between the tie and right main. and Mandalay Bay have the option to limit the solar power
Sunora Energy Solutions (an NRG Renew subsidiary) installed output remotely through the relay control. The expectation is
metering current transformers, potential transformers and a that there will be no need for curtailment.
multifunction power meter to manage the power on the NV —John S. Glass, lead field service engineer, Eaton;
Energy side of the right main switch. NV Energy Jared Porpiglia, manager, pro-
helped with the configurations, and enabled the curement, NRG Renew
team to avoid power outages to Mandalay Bay
during system interconnection. Large scale While zero-export
In the event of a power outage or to facilitate systems are frequently associ-
maintenance, the existing key interlocks allow ated with residential applica-
tions, the 6.4 MWdc MGM
Phase I solar project at the
Mandalay Bay Convention
Center is required contractually
to eliminate the possibility of
back-feeding solar generation
into NV Energy’s system.
50 S O L A R PR O | March/April 2016
portion of our market. The economics and benefits of energy experiencing a downward trend. If utilities continue to cre-
independence have never been better; and as utilities increas- ate environments that promote self-consumption instead of
ingly rely on penalizing solar with minimum bills and access reasonable grid energy exchange, and energy storage costs
charges, we see customers doing the math and cutting the cord. continue to decline, the number of consumers who choose
—Philip Undercuffler, OutBack Power Technologies to install these systems will increase.
—Marvin Hamon, PE, Hamon Engineering
Grid defection will almost certainly increase as a result of
new technology and lower system costs, but it will still be The next 5 years will be a time of rapid development in
limited to a small group of individuals. While some are able integration and ease of deployment of plug-and-play smart
to accept the more modest lifestyle required for grid defec- meters; smart hybrid inverters; battery banks that are mod-
tion, most US consumers would not compromise. The most ular, safe and robust; and networked appliances and home
likely markets to see some rise in grid defection are Hawaii controls. Software will offer intuitive visualization and
(among other island markets) and other areas of the US insight into real-time market signals that allow prosumers
where the electricity rates are steadily increasing, such as to participate fully in supporting and receiving benefits from
California and Arizona. the networked smart grid.
—Martin Volkmar, SMA Solar Technology —Wes Kennedy, Fronius USA
How will the US market for self-consumption We will see one state after another move away from NEM
PV systems, and the equipment used in and to a rate structure that encourages self-consumption.
—Neil Maguire, JuiceBox
these systems, evolve over the next 5 years?
The last few years have seen a decline in battery and PV product
It’s impossible to tell since it is driven by utility deci- prices and an increase in smart inverter capabilities. This allows
sions that are difficult to predict and system costs that are smart energy management both on a micro level for individual
R OLL FORMING
OMCO SOLAR
SHAPING A GREENER FUTURE
S TAMPING
F ASTENER INSERTION ARIZONA
OHIO
C USTOM ASSEMBLY
INDIANA
ALABAMA
602.352.2700
sales@omcoform.com
www.omcosolar.com
solarprofessional.com | S O L A R P R O 51
Self-Consumption
Considering what happened in Germany with changes to few of which were designed specifically for grid-tied self-
feed-in tariffs and higher utility-rate tariffs, you can expect consumption systems. As the market develops, inverters will
similar regulatory changes to have an impact on PV sys- likely transition from a narrow focus on energy production
tems in the US. Some markets have already seen dramatic to a broader perspective of energy management. Systems
changes on the regulatory side, and residential demand will become easier to design and install as designers learn
charges and distribution access charges are likely to from the lessons of the PV industry in terms of modularity
become a reality. Storage systems will continue to provide and repeatability.
solutions that help future-proof customers. The number of —Philip Undercuffler, OutBack Power Technologies
storage system installations will increase, not only because
of potential regulatory changes and customer desire to Due to rising PV system saturation, net-metering schemes
consume more of the solar energy they produce, but also will end in more and more US states. This will give momen-
because of the declining cost of energy storage technology. tum to the paradigm change in using PV systems—from
Storage will become a standard part of the solar installa- earning money through high feed-in rates or net metering,
tion, instead of an add-on. to energy cost reduction through enhanced self-consump-
—Greg Smith, sonnen tion rates and higher self-sufficiency levels for households
with PV systems, including storage.
Sunverge Energy just announced its next-generation system, The rising number of smart homes in the US will contrib-
which offers more lithium-ion battery chemistry options than ute to using self-generated PV energy more efficiently. With
before, in a smaller footprint and at a reduced price. Systems a network of appliances in the smart home, load shifting will
will continue to improve and become more attractive to con- become an easy-to-realize standard for energy efficiency
sumers. At the same time, the most important advances are measures in the near future. Appliances will automatically
in the intelligence of the systems and the control platform in use power when the sun provides it at sufficient levels.
the cloud, which will make possible this transition to power —Martin Volkmar, SMA Solar Technology
as a service, as well as much more intelligent, automatic and
efficient management of distributed power resources. g C O N TAC T
—Stu Statman, Sunverge Energy
Joe Schwartz / SolarPro / Ashland, OR /
Today’s market is in its infancy. Installers are kitting joe.schwartz@solarprofessional.com / solarprofessional.com
together solutions using the products and tools available,
52 S O L A R PR O | March/April 2016
RT- [ E ] Mount / E Mount AIR
® ®
www.roof-tech.us
solarprofessional.com | S O L A R P R O 53
Regardless of the role a PV business plays in the solar value chain,
a solid marketing strategy in 2016 must do more with less.
T
hanks to the relative youth of the solar industry,
marketing budgets will remain limited until mar-
keting departments can fully demonstrate their
contribution to revenues. Meanwhile, major shifts
in consumer purchasing behaviors not only create
new marketing challenges but also present new opportuni-
ties for marketers to quantify their impact on the bottom
line. Customers have moved from in-person meetings and
phone calls as the means of performing their initial due
diligence, research, vetting and purchasing; they are now
going through this journey alone and online. Since market-
ers traditionally manage the online presence of a brand, this
change in the customers’ journey requires a transition from
traditional marketing and branding campaigns to revenue-
marketing initiatives responsible for the early stages of
engagement that the sales department used to handle.
In this new paradigm, brands have to interact with pros-
pects through digital channels and forums, where they have
less control over shaping customers’ decision-making pro-
cesses. Tools such as email, blog posts, webinars, online
forms and videos allow marketers to create customized,
multifaceted, presales lesson plans full of valuable content
for each specific buyer persona with whom they want to do
business. Further, marketers can now use digital marketing
tools to track engagement with prospects online and quan-
tify the impact that marketing and communications have on
bringing business into the organization.
Solar Marketing
54 S O L A R PR O | March/April 2016
By Philip Hall
iStock
of this initiative and are responsible for the heavy lifting that Given that today’s consumers tend to refrain from engag-
enables the organization to achieve its mission and goals. ing a salesperson until the last possible moment, marketers
Solar marketing today has evolved in step with the US need to innovate and find ways to curate the brand experi-
solar industry. The North American market for PV products ence—not only adapting content to multiple platforms, but
really hit its stride in 2000 with the passage of California’s also targeting buyers early in their journey. In other words,
Senate Bill 1345, which directed the state’s energy commis- marketers need to shift the dynamic in their strategies from
sion to develop and administer a grant program supporting that of seller and buyer to that of teacher and student.
the purchase and installation of solar energy and selected
small distributed generation systems. Initially, the solar
industry faced skepticism from potential customers who Effective Solar Marketing
were hesitant to be early adopters of an innovative technol-
ogy, and it lacked financial backing as the investment com- Until solar matures and becomes a more pervasive player
munity was unwilling to risk supporting a “green” energy in the US energy mix, marketing departments will face the
source it knew little about. challenge of acquiring more customers with fewer resources.
However, the growth of international markets that were Just a few years ago, the cost to install solar was double what
embracing photovoltaics drew the attention of Wall Street, it is today, which enabled some companies to spend liberally
and slowly investors turned their attention to the massive on building their brand and market share. Today, solar is a
untapped US market potential. Primarily in California, solar tight-margin business that requires low customer acquisi-
competition grew in the residential and small-scale commer- tion costs for companies to turn a profit while continuing
cial sectors. More money went into researching new tech- to grow.
nologies, financial products and project development. The US One of the most cost-effective marketing strategies is
solar market grew year over year, and audiences’ understand- to segment the database of potential customers, and then
ing of the solar value proposition matured. As solar firms grew nurture and engage those leads by generating audience-
and expanded into new geographies, so did their marketing specific value-added content. Since today’s customers are
departments, disseminating content that explained how solar actively looking for information via digital platforms, brands
works, touted the many benefits it provides and identified that provide trusted content are more likely to win their
product vendors and installation contractors. business. Therefore, marketers should focus on generating
Fast-forward a decade: Solar’s potential customers have content intended to inform and educate rather than push a
become far more sophisticated, and, thanks to the Internet, specific product or service offering.
they can be their own subject matter experts without having
to make a phone call or meet with a vendor. Several recent MARKET SEGMENTATION
studies suggest that today’s buyers complete 60%–70% of The solar industry sells to a variety of customer types and
their purchasing journey digitally. Whereas information decision makers: homeowners, business owners, low-income
about solar used to be scarce and hard to find, buyers now housing developers, tenants, entities with investment-grade
have access to a wealth of content from a variety of sources. credit, public institutions, utilities, independent power pro-
ducers, consultants and even politicians. Customer rela-
Paradigm shift Empowered by digital tools, today’s buy- tionship management (CRM) software allows marketers to
ers are more proactive and self-directed than ever before. segment prospects by customer type and level of interest.
Research by CEB suggests that business-to-business cus- Selling solar to the chief financial officer of a food pack-
tomers complete more than half of their due diligence before ing facility in California’s Central Valley is completely dif-
contacting a supplier. ferent from selling it to a homeowner in Florida. Similarly,
selling racking to the vice president of procurement for an
Customers are choosing to delay
commercial conversation with suppliers EPC firm is different from selling it to the buyer for a local
PV parts distributor. The basic concept behind market seg-
57% mentation is that prospective customers are more recep-
complete tive to content that speaks directly to them and their needs.
For example, a facilities manager for a school district might
D a t a s o u rc e C EB
56 S O L A R PR O | March/April 2016
April 3-6,
Gold Sponsors
Earn Credits Toward Your
Certification or Recertification
Make plans now to attend NABCEP’s 5th Annual Continuing
Education Conference at Paradise Point Resort & Spa in San
Diego, CA from April 3-6, 2016. This is the ideal opportunity for
NABCEP Certified PV Installation Professionals and PV Technical
Silver Sponsors Sales Professionals to obtain all of the continuing education
credits needed for recertification. Non-certified professionals
can earn up to 18 hours toward certification eligibility.
or giving us the opportunity to partner with them this year as the platinum
great honor that we are able to help further their mission to support the
Solar Marketing
CRM software. To collect customer datasets, some solar different pieces of content at specified intervals or in
companies purchase contact lists. Others become mem- response to specific actions or milestones, based on sets of
bers of a trade association to access its membership list, rules defined within the software. With Pardot, for example,
or they scour the web or collect business cards at trade marketers can create a set-it-and-forget-it email drip cam-
shows. Regardless of how a company builds its lead data- paign: At the click of a button, the prospect receives a series
base, CRM software allows it to manage and track these pro- of targeted email messages in a prescribed order.
spective customers. Integration with CRM platforms further empowers mar-
A CRM software platform is the hub that archives infor- keting automation tools. For instance, when a prospect takes
mation about new, existing and potential clients. Popular a specific action, such as clicking on a link in an email or fill-
CRM offerings today include Insightly, Oracle, Salesforce, ing out a form on a website, the CRM platform can alert the
SugarCRM and Zoho. Each offers off-the-shelf solutions that appropriate sales representative and note the interaction in
also allow customization. Some of these solutions are geared the lead database. While it takes a lot of work to set up these
toward design-build companies with 100 employees or less, processes, which require constant iteration and improve-
while others are better suited to large online consumer ment, they do offer another way to accomplish more with
product retailers. fewer resources.
Grading leads. Grading is the process of segmenting exist-
ing and potential customer datasets into clearly defined Tier 1
and Tier 2 markets. Tier 1 markets comprise ideal customers;
Tier 2 markets are less immediately lucrative but still worth
pursuing. For example, Tier 2 markets might include custom-
ers who are in an area that is more difficult for the company
to service or customers who require a resource-intensive form
of financing.
CRM software can assign each prospective customer a
grade based on conformity to an ideal customer profile. For
instance, the marketing and sales teams might decide that
the ideal customer is a homeowner in New Mexico with an
average electric bill of $200 per month. Based on this bench-
mark, a residential prospect in Albuquerque with an aver-
age electric bill of $250 might receive an A grade in the CRM
platform, whereas a neighbor with an average electric bill of
$150 might receive a B. Grading is one way to sort the lead
C o u r t es y Pa rdot
58 S O L A R PR O | March/April 2016
General Segmentation vs. Hypersegmentation most common in the ideal Tier 1 and Tier 2 segments ( for
example, the “ideal customer” defined earlier—home-
General segmentation Hypersegmentation owner, in New Mexico, electric bill greater than $200 per
month). An abundance of responses is a good problem to
Recipients 1,000 300
have. The marketing department can then work on find-
Response rate 2% 4%
ing ways to further refine customer profiling or implement
Total responses 20 12 some sort of qualification process that insulates the sales
Table 1 While hypersegmentation can improve marketing team from tire kickers.
campaign response rates, it runs the risk of netting fewer total
responses by applying too many data filters. LEAD NURTURING AND ENGAGEMENT
With the list segments defined, next up is the use of digi-
tal marketing tools and online forums to engage each seg-
software can send automatic alerts to sales personnel when- ment in a variety of ways. In this context, engagement is
ever a lead reaches a particular score threshold. The score any interaction a customer or prospect has with the brand.
can also indicate whether this is an early-, middle- or late- Unfortunately, not all potential customers are ready to buy
stage buyer and allow the marketer to initiate an appropri- at the same time, and prospects actively looking for the
ate strategy. (See “The Buyer’s Journey” on p. 60.) brand’s products and services will be at different stages of
General segmentation versus hypersegmentation. To seg- the procurement process. Therefore, the marketing plan
ment a database, marketers should start by filtering their needs to engage prospective customers at regular intervals
lists according to the most clearly quantifiable values, such over a period of time that is roughly double the length of the
as buyer type, procurement stage, industry type, geogra- average sales cycle. This lead-nurturing plan can be elabo-
phy, site specifications and so forth. Then the focus shifts to rate or simple.
maintaining the accuracy of these limited fields as the data- The optimal cadence (frequency of touches), as well as
base expands. the quantity of interactions, will depend on the buyer seg-
While the data will never be perfectly accurate, taking ment and its familiarity with and interest level in the com-
a strategic approach to segmenting lists maximizes their pany’s offerings. The strategy could involve sending a single
usefulness. It is best not to focus on job titles, for example, email to a list of recipients once a month for a year, or 10
since employees with the same title do not necessarily have different emails over the course of a single month. Marketers
the same role from one organization to another. Further, in can also mix and match engagement methods, perhaps
the business-to-business space, customers are ultimately implementing a program that uses email marketing in con-
business entities, agencies or organizations. As such, a chief junction with follow-up phone calls that attempt to drive
financial officer and a facilities manager might both offer traffic to the registration page for a webinar. The intent is
inroads to potential customers, but they will have different the same, regardless of method or cadence: to develop a trail
goals based on their specific roles. The marketing content of content that nurtures prospective customers along the
should reflect these distinctions. buyer’s journey. In effect, the goal is to get prospects who
There is a fine line between optimal segmentation and are initially unaware of the company and its products and
too much. While a tightly refined list might result in a great services to a point where they reach out for more-specific
response rate, it also requires more time to filter and may information about an offering—which is a signal that they
not result in the highest number of responses. As shown are ready to buy.
in Table 1, casting a wider net may result in a higher num- Social media platforms. By setting cookies on website visi-
ber of responses, offsetting a lower response rate. Applying tors’ browsers, marketing automation tools also improve
too many filters to the data could eliminate an opportunity marketers’ ability to track customer engagement on dif-
that falls just outside those parameters. Hypersegmentation ferent social media platforms. Tracking these interactions
works only if the data are extremely clean and thorough, and offers insight about the content that prospective customers
the company has the resources to generate enough content find most valuable or interesting. These insights can help
for each precise customer segment. marketers improve web traffic and blog content and reach
If customers in a specific market segment share five or new audiences.
more characteristics, then refine the segment further based While each social media platform has its own limitations
on those characteristics ( for example, residential cus- and conventions, they all provide opportunities for customer
tomer, located in a specific region and so on). If customers engagement. Twitter currently has a limited character count,
come through a variety of channels and many are unique whereas YouTube is a platform for video content. Facebook
in some way, segment on the two or three characteristics has a casual and familiar tone, while LinkedIn is professional
solarprofessional.com | S O L A R P R O 59
Solar Marketing
and conservative. Marketers can use these distinctions to tar- websites were very basic—devoid of sticky features intended to
get different types of leads with different content. hold customers’ attention or promote return visits—and dis-
played a limited volume of content in a single format: text.
VALUE-ADDED CONTENT Today’s consumers no longer need to walk the floor of an
Remember when customers used to engage with professionals exhibit hall to get a snapshot of the solar industry. Instead,
directly? Fifteen years ago, solar professionals went door-to-door all the information they require is available from their web
to discuss how solar worked. Customers attended home and gar- browser’s search bar. Further, research by McKinsey &
den shows and Rotary Club breakfasts to meet with the one or Company suggests that 50% of business-to-business transac-
two solar integrators active in their local market. Solar company tions now take place on digital platforms.
60 S O L A R PR O | March/April 2016
post, infographic, webinar or print collateral—value-
added content should emphasize the teacher-student
dynamic between the seller and the buyer and leave
customers with a sense of trust in, and respect for, the
brand. When value-added content is done well, cre-
ating and disseminating it results in customers who
are better informed and therefore more discerning. If
these better-informed buyers trust a brand, they are
more likely to contact its sales representatives or visit
its online store when they are ready to buy.
Generating content. Fostering customer loyalty
depends largely on a marketer’s ability to create or
source content that is of value to prospects and to
deliver it when and where they are looking for it.
Such content needs to target different market seg-
ments and buyer stages. While every organization is
unique, a good rule of thumb is that 20% of the con-
tent should target early-stage buyers, 60% should
target middle-stage buyers and 20% should target
C ou r te sy Bor re go S ola r
late-stage buyers.
To generate content that
provides real value to real
customers, the marketing
department should work with
sales to identify the common
Value-added content Blog posts, such as these on
purchasing profiles within
Borrego Solar’s website, are a prime opportunity for
the existing customer base,
companies to disseminate content that educates and
and then develop content for
informs prospective customers, ultimately building their
those profiles. Say one type of
trust in the company’s brand.
customer needs to convince a
group of colleagues to make
a purchase. Appropriate con-
Now, more than ever before, marketers have the tent helps that person com-
ability to engage with clients in online forums where municate the benefits of an
the prospect or customer is most comfortable. While offering to various depart-
solar marketers may have more limited financial ment heads: For instance, a
resources than they did a decade ago, they also have white paper or blog entitled
more digital pathways for conveying messages about “Guide to Evaluating the Eco-
the continuous evolution of solar technologies, regula- nomic Benefits of Solar” could
tions and policies. These pathways include paid online enable a facilities manager to
text ads, sponsored web searches, pay-per-click ads, justify an investment in solar
display ads, blogs, digital publications, email market- to a chief financial officer who
ing campaigns, webinars, Facebook, Twitter, LinkedIn, is concerned only about the
YouTube and so forth. Each one provides marketers bottom line.
with opportunities to cast a line, dangle some bait and
try to catch the interest of prospective customers. Confidence building Orga-
The most effective bait is value-added content, which nizations such as the Solar
educates and informs customers or engages them in a Energy Industries Association,
conversation. To stand out from the noise, value-added which produced this solar
Co u r t es y S E I A
content should not be packed with sales pitches: Its goal jobs infographic, are a good
is to provide information that customers can use along source of general content for
their buyer’s journey. Regardless of the medium—blog early-stage buyers.
solarprofessional.com | S O L A R P R O 61
Solar Marketing
C ou r te sy S u n L in k
Marketers need to take advantage of ments are under increasing
resources in other departments within pressure to lower customer
their organization, as well as beyond acquisition costs and generate
it. The public relations department, revenue, it is important to under-
for example, can pitch educational Teaching tools SunLink’s YouTube channels, one promise in messaging and over-
and promotional articles to media of which is shown here, offer a good example of deliver in practice. Overselling or
outlets. The finance team can develop how marketers can use social media to educate deceptive phrasing in marketing
an article about the pros and cons of prospects about product offerings and differentia- poisons the well for everyone.
various financing products for a trade tors, all good content for middle-stage buyers. Not only are unhappy customers
publication. The marketing depart- more likely to share stories about
ment can distribute the published article to customers looking their buying experiences than happy customers, but also
to evaluate solar financing options. The implicit endorsement potential customers are more likely to believe negative than
of a third-party publication will add credibility to the message, positive reviews.
and, as long as the piece is informative, prospective customers No one wins if a vendor advertises an impossibly low
will appreciate receiving it. rate for a power purchase agreement as a way to win more
In addition to developing value-added content in-house, business. If customers get hit with a change order later, that
marketers can leverage other industry resources. The Solar leaves them with the impression that solar is not as good
Energy Industries Association, for example, is an excellent a deal as advertised. If the vendor absorbs these costs and
source of content about the general benefits of solar and the operates at margins that are not sustainable, that vendor
current state of the industry for early-stage buyers. More- will eventually go out of business and leave customers with-
detailed content published in industry trade publications out warranty support. Getting such a black eye does not
suits the needs of middle-stage buyers. To perform a valuable engender customer satisfaction or trust, nor does it attract
service for prospective customers, simply point them in the investors, and it leaves open chinks in the armor that oppo-
direction of quality information from a trusted source—con- nents to solar can exploit.
tent that is easy to source and disseminate, but still provides As an industry, we are selling systems with a 25-year ser-
valuable insights for potential customers. For instance, a vice life. For many customers, a PV power system purchase
monthly email blast might provide links to the five most inter- is a one-shot deal. It is also a very large purchasing decision
esting articles on a topic published in the last 30 days. Social for both residential and commercial customers. As such, it is
media offers another outlet for sharing good information. important that they have a good buying experience and be sat-
Marketing automation tools allow the marketer to eas- isfied with the results. Ultimately, what is best for solar busi-
ily disseminate value-added content to various market seg- nesses is also what is best for consumers—namely, a thriving
ments. To track engagement by buyer segment, the marketer solar industry with a healthy amount of competition.
integrates these automation tools with social media plat-
forms, CRM software and various other application program g C O N TAC T
interfaces. Rules within the marketing automation and CRM Philip Hall / Borrego Solar / Oakland, CA / phall@borregosolar.com /
platforms can feed qualified leads directly to the sales team. borregosolar.com
When used in this manner, these software tools bridge the
62 S O L A R PR O | March/April 2016
North America’s Most-Attended Solar Event
Moscone Center, San Francisco
Hear it here first! Be part of the first major U.S. solar event of the year
18,000 visitors connect with 550 international exhibitors
Solar & Energy Storage – The perfect match! Intersolar is co-located with ees®
co-located with
Exhibit now!
Interview An Experienced Perspective
64 S O L A R PR O | March/April 2016
recertification, but all certificants also a great event for skilled PV profes- larger-scale systems and technical
must complete at least 18 hours of sionals who are not yet certified. All the sales, while keeping important ses-
relevant training and demonstrate a sessions are geared for people who have sions on technical challenges and
decision-making role on a minimum significant PV experience, so we do have installation best practices.
number of completed jobs every 3 some requirements for who can attend.
years. This essentially amounts to a The majority of attendees are NABCEP SP: Is NABCEP getting a good response
minimum of 1 day of training per year. certified, and this creates a unique from vendors for participation in the equip-
While dozens of registered training and much anticipated event for those ment and services expo?
providers offer continuing educa- working every day designing, selling, RL: Yes! We have sold out exhibit space
tion opportunities throughout the installing and maintaining PV systems. every year so far and fully expect to
year, NABCEP designed its annual Attendees enjoy networking with others sell out again. Exhibitor interest is very
Continuing Education Conference like them who eat, sleep and breathe PV, strong in this event because we put
to provide all 18 hours over a single and they appreciate the attention the exhibitors in front of the most active,
3-day period. We move the conference organizers, exhibitors and speakers give knowledgeable and experienced pro-
between locations in the east, west to ensure that the activities and content fessionals in the country. Many exhibi-
and central parts of the country so are as relevant as possible to them. tors comment on how much more
that at least once every 3 years we hold valuable this event is to them than the
the event in regions where we have a SP: What are some of the new training bigger trade shows are, because every-
lot of certified professionals. sessions this year’s event will offer? one they talk with is actually buying
RL: The first 2 days of the conference and installing product.
SP: What does NABCEP look for when are split between exhibitor technical
approving a continuing education provider? training sessions in the morning and SP: According to GTM Research, the two
RL: We intend our continuing education in-depth special topic panel sessions largest national integration firms—SolarCity
to keep our certified professionals up to in the afternoon. The third day has a and Vivint Solar—accounted for 46% of
date on the latest codes and standards, few all-day options available for really the US residential solar market in the first
technology and industry best practices. diving into a topic. As always, a select half of 2015. How does the trend toward
Companies or training institutions group of exhibitors will be updating increasingly large installation companies
offering courses for experienced work- participants on their latest products impact national certification efforts?
ers related to one of our certification through 90-minute technical sessions. RL: We originally intended the NABCEP
job task analyses can register them for The sessions keep the sales pitch to PV Installation Professional certification
NABCEP CE credits by completing a a minimum and give attendees the for the one person a customer worked
simple application. Most NABCEP CE opportunity to engage with high-level with to design, install and maintain
providers are product manufacturers technical staff. We have a great lineup a system. As companies grow larger,
offering technical training sessions on covering all the major components there’s a natural progression toward
their equipment. Taking these types of of residential- and commercial-scale more specialization of the workforce. As
courses helps ensure that solar profes- systems, with and without storage. such, it can now take quite a bit longer
sionals have training that is directly for an employee in a larger company to
related to the actual equipment they are SP: How are the panel sessions shaping master the breadth of tasks covered in
specifying, installing and maintaining up and what are some of the highlights? NABCEP’s job task analysis. Those who
for customers. RL: Each year we engage a diverse are able to achieve certification are held
group of industry experts on a confer- in higher regard within these companies
SP: NABCEP is holding its fifth annual ence planning committee. The main and quickly move up the ranks. The
Continuing Education Conference in San objective is to come up with a short needs of the industry have always guided
Diego April 4–6, 2016. Do you have to be list of the most relevant and interest- NABCEP’s programs. As the industry
NABCEP Certified to attend this event? ing topics for the 2-hour panel ses- evolves, we continue to adjust our pro-
RL: While the primary purpose of sions. Using their input and feedback grams and develop new credentials to
the conference is to provide current from last year’s attendees, we’ve meet stakeholder needs.
NABCEP-certified professionals with an arranged 16 of the most timely and
opportunity to get all of the training they focused presentations for PV sales and SP: Is NABCEP working on any new proj-
need to recertify, the annual NABCEP installation professionals. This year, ects or certifications?
Continuing Education Conference is we’ve focused more on energy storage, RL: We have a lot of new and exciting
solarprofessional.com | S O L A R P R O 65
Interview
initiatives in 2016. First, the board I see happening in some of the existing developed our certification programs,
has approved a major update to the markets around net metering, demand customers were primarily hiring individ-
NABCEP Entry Level Program. Tens of charges and other policies that have ual contractors to install and maintain
thousands of people have taken this a dramatic impact on the economic their solar equipment. Now customers
exam over the past 10 years. It serves to viability of solar. Some states have seen are comparing quotes from different
identify those who have mastered the hundreds of jobs disappear literally over- companies and have very little control
fundamentals of the technology and is night. These attacks on solar are crop- over who actually designs and installs
a great tool for employers to use in hir- ping up all across the country. It’s more the system. The NABCEP Company
ing and promoting staff in a wide vari- important than ever for solar companies Accreditation Program helps to ensure
ety of positions. We will be rebranding to pay attention and get involved. that the company has qualified staff;
the program as the NABCEP Associate, appropriate policies and procedures;
and a new experience-based pathway SP: Several solar training organizations a focus on worker safety; and commit-
will allow anyone with 6 months of offer courses designed to help individu- ments to ongoing staff training, quality
relevant work experience to qualify for als prepare for NABCEP’s PV Installation assurance and ethical practice.
the credential. Professional and PV Technical Sales
We are also just about to launch certifications. What advice do you have SP: We were pleased to see that NABCEP
two new credentials targeting system to help solar professionals evaluate the recently elected one of our contributing
inspectors, one for PV and one for various providers? authors, Rebekah Hren, to its board of
solar heating. Reports from compa- RL: Hundreds of schools, colleges, directors. What other opportunities does
nies hired to perform comprehensive nonprofit organizations and private NABCEP have for professionals looking to
post-installation system inspections companies offer solar courses today. support the organization?
have found that most systems installed The vast majority offer only one or two RL: NABCEP wouldn’t exist without the
today still have code violations after the introductory-level courses. These can be contributions and dedication of industry
AHJ has approved them. We hope that a great way to get started, but it’s naïve experts. We have over 100 volunteers
these new credentials encourage code to think that you can learn everything who serve on our board and various
officials across the country to learn needed to become a solar professional committees. We’re always looking for
more about solar and what to look out from one or two classes on the subject. experienced professionals to provide
for when inspecting these systems. The best programs offer a wide variety of guidance and technical assistance in
Finally, we will be conducting courses and focus on renewable energy the development and maintenance of
a major update and revision to the technology. They have a strong introduc- our programs. If anyone is interested,
PV Installation Professional job task tory level class or two, and intermediate please send a resume and letter of inter-
analysis this year. During this update, and advanced courses in topics such est to info@nabcep.org. We also love
we will identify the knowledge and as off-grid systems, technical sales, having NABCEP Certified Professionals
skills associated with the major divi- commercial-scale design, and mainte- volunteer time at our booth at different
sions of system design, installation nance and troubleshooting. In addition, conferences during the year to speak
and maintenance that we see workers while an online course can be very valu- with people about the value of their
specializing in. Doing so will pave the able, there’s no substitute for hands-on certification and what it has meant for
way toward developing new creden- experience. Better training programs their careers.
tials for people performing a portion have a dedicated lab with a variety of dif-
of the overall job task analysis. ferent types of systems and components. SP: In addition to the Continuing
Finally, if the goal is to prepare for one Education Conference, what are some
SP: Do you have any insight into where of our certification exams, instructors NABCEP-related dates industry profes-
new markets for solar are emerging in should have the certification themselves. sionals should be aware of in 2016?
North America now based on the demand RL: The next application deadline
for NABCEP certification? SP: What are the benefits of NABCEP’s for certification exams is August 5,
RL: We’ve seen a growing market in Company Accreditation program and 2016. NABCEP Continuing Education
the Southeast over the past few years. how does it differ from the certification an training will be available at Intersolar
While I’m excited about the new market individual would acquire? North America in July and Solar Power
there and encouraged by the adoption RL: NABCEP certifies individuals and International in September. Of course,
of requirements for NABCEP credentials accredits companies. Both certification people can check the SolarPro training
that we see in some of the utilities in and accreditation are ultimately about calendar for other NABCEP CE Credit
these areas, my bigger concern is what consumer protection. When we initially opportunities throughout the year.
66 S O L A R PR O | March/April 2016
Built to Last...
Starting with SolarPro’s September/October 2015 issue, we began
charging for US and international subscriptions to the print edition, as
well as access to our full digital issue archive. This change will offset
a portion of our growing printing and shipping costs and allow us to
continue to dedicate significant resources to developing the in-depth
technical content that makes SolarPro so valuable.
Stay Connected...
Subscribe Today
• All print subscriptions include complimentary access to SolarPro’s
digital edition
solarprofessional.com/subscribe
Phone 800.707.6585 or 541.512.0201 • Monday–Thursday, 8am–4pm Pacific
Questions? subscribe@solarprofessional.com • solarprofessional.com/faq
Projects System Profiles
Overview
DEVELOPER: Solar Frontier Americas
T he 18.7 MWdc/
15 MWac Morelos
del Sol solar plant
Development, solar-frontier.com
is located in Kern
EPC FIRM: DEPCOM Power,
County, California.
depcompower.com
Solar Frontier Americas
ENGINEERING SERVICES: Sisener
Development coor-
Engineering, N.A., sisener.com
dinated the project’s
DATE COMMISSIONED: October– timeline and led an
November 2015
experienced team
INSTALLATION TIME FRAME: including EPC firm
162 days (mobilization to mechanical DEPCOM Power and
completion)
engineering services
LOCATION: Lost Hills, CA, 35°N provider Sisener Engineering. Solar features required detailed attention
SOLAR RESOURCE: 5.7 kWh/m2/day Frontier’s advanced thin-film CIS mod- in the engineering phase. Site-specific
ASHRAE DESIGN TEMPS: ules, Clavijo single-axis trackers and challenges included a gas line that runs
102.2°F 2% average high, 28.4°F Bonfiglioli power stations and inverters diagonally under the array field. The
extreme minimum comprise the system’s major compo- Solar Frontier Americas Development
ARRAY CAPACITY: 18.72 MWdc nents. DEPCOM Power began construc- team worked closely with Southwestern
ANNUAL AC PRODUCTION: tion on Morelos in May 2015. The plant Gas through preconstruction and build
40,215 MWh reached commercial operation on phases to execute in accordance with
November 25, 2015. protocol and ensure safety. In addition,
Project planning for Morelos del the development team coordinated with
Sol began in 2010. The site’s geological PG&E to time the interconnection to
68 S O L A R PR O | March/April 2016
to reduce on-site time and
labor costs. The inverters
Equipment Specifications
feature six MPP trackers per MODULES: 111,744 Solar Frontier
unit, active power control, CIS thin-film SF165-S and SF170-S,
165 W STC and 170 W STC, +5/-0 W,
reactive power control,
1.95 Imp, 87.5 Vmp, 2.2 Isc, 112 Voc
dynamic grid support and a
(SF170-S)
CEC efficiency of 98.2%. Each
INVERTERS: Six Bonfiglioli 2.5 MW
power station has two ac
RPS Stations; 12 Bonfiglioli RPS
circuits aggregated in a sec-
TL-US 1350 central inverters (two per
tionalizer that will automati- power station), 1,350 kVA rated output,
the site’s 34.5 kV–to–70 kV substation, cally isolate sections of the distribution 1,000 Vdc maximum input, six MPP
accommodating back-feed restrictions system in the event of faults. The project trackers per inverter unit, 610–850 Vdc
and ensuring that no service disruption design utilizes Cooper Sector Series MPPT range, 406 Vac output;
for other line users would occur. 4-way sectionalizing switchgear. one medium-voltage 406 Vac Wye-
The team specified Clavijo single- Morelos del Sol will provide PG&E to-35 kV Delta step-up transformer
axis trackers for the project. With over with a projected 40,215 MWh of solar per RPS Station
1 GW of fixed-tilt arrays and trackers energy annually under a 20-year power ARRAY: Eight modules per source
installed worldwide and a pipeline of the purchase agreement. In October 2015, circuit (1,360 W, 1.95 Imp, 700 Vmp,
same size for 2016, Clavijo is experienc- Turner Renewable Energy and Southern 2.2 Isc, 896 Voc for SF170-S), 10–16
ing rapid growth in the US market. It has Power, a subsidiary of Southern Company, circuits per source-circuit combiner, 24
installed close to 100 MW of tracking acquired Morelos del Sol, expanding the source-circuit combiners per RPS Sta-
tion (typical); 18.72 MWdc plant total
systems in the US to date, primarily in utility giant’s renewable energy portfolio
California. Clavijo engineered a rein- to eight solar projects in California with a ARRAY INSTALLATION: Tracked
forced SP1000 tracker to accommodate total capacity of over 300 MW. array, Clavijo single-axis trackers, 0°
azimuth, ±50° tracking range of motion
the Solar Frontier CIS modules config- “Solar Frontier Americas Development is
ured in two-up portrait orientation. This very proud of this project. Through close SOURCE-CIRCUIT COMBINERS:
configuration maximizes the output of collaboration with our development team, 144 Shoals STG.CBC.16.
BLAHNC01E1, 30 A fuses
each power block. equipment suppliers and construction
Six enclosed Bonfiglioli 2.5 MW RPS partners, we completed Morelos del Sol SYSTEM MONITORING: DC Systems
Stations provide an added level of pro- on time, and it has met our quality and Real-Time Smart Energy Suite
solarprofessional.com | S O L A R P R O 69
Advertiser Index
Company Page Company Page
AEE Solar 13 OMCO Solar 51
AET Energy 19 Panasonic 27
Allied Moulded 46 Phocos 18
Array Technologies 7 Quick Mount PV 3
Brilliant Rack 1 Roof Tech 53
Chint Power Systems IFC, 17 Seaward Solar 31
Darfon IBC SMA America 5
Franklin Electric 42 Solar Pathfinder 53
Fronius 9 SolarBOS 37
GameChange Racking 41 SolarEdge 33
Ginlong Solis 15 SolarPro Subscription 67
HEYCO 43 Solmetric 41
Intersolar 63 Standing Seam Roof Anchor 53
Iron Edison Battery Company 47 Stiebel Eltron 25
MidNite Solar 53 Ten K Solar 34
Mounting Systems 29 Trojan Battery 11
MREA 70 Unirac 23
NABCEP CE Conference 57 Yaskawa-Solectria Solar BC
Affordable COURSES,
Rich CONTENT.
High-quality solar training without the high price tag.
70 S O L A R PR O | January/February 2016
Projects
Same Sun of Vermont
Same Sun Solar Society
S a m e S u n of Ve r m on t
Overview
DESIGNER & PROJECT MANAGER:
S ame Sun of Vermont’s inaugural
Solar Society community solar proj-
ect brought together a shared vision,
A dedicated Same Sun team spent
a year in research and due diligence to
address successfully the legal, land use,
Khanti Munro, director of development
over a decade of solar experience, an financial and permitting challenges
and technical design, Same Sun of
open-minded landowner and more associated with the solar society model.
Vermont, samesunvt.com
than a dozen Vermonters in the market With a land lease in place and some
LEAD INSTALLER: Tyler Crow, Same
for off-site solar. Various community members (off-takers or subscribers)
Sun of Vermont
solar models are gaining traction across signed up, the team still faced chal-
DATE COMMISSIONED: August 2015 Vermont and nationwide, and Same Sun lenges such as soft soils and the site’s
INSTALLATION TIME FRAME: had a growing list of potential custom- rural single-phase service.
20 days ers who were unable to install solar on Geotechnical analysis and multiple
LOCATION: Poultney, VT, 43.5°N their residences due to excessive shad- pull tests revealed that the site’s soil
SOLAR RESOURCE: 4.21 kWh/m2/day ing, slate roofs or rental agreements. was almost entirely moist clay. The first
ASHRAE DESIGN TEMPERATURES:
A Solar Society is distinguishable racking company on-site was unable to
84.2°F 2% average high, -14.8°F from other community solar models yield passing pull-test results, even with
extreme minimum in the region. Rather than subjecting an 8-foot embedment depth. RBI Solar’s
ARRAY CAPACITY: 113.4 kWdc
customers to a leasing model that offers a longer 20-foot piles just passed muster
small percentage discount on the monthly at an impressive 14-foot embedment
ANNUAL AC PRODUCTION:
144,800 kWh
bill, a Solar Society allows customers to depth. The longer piles were crucial to
buy and own outright a specific percent- avoid a costly change to a concrete or
age of the array based on their energy helical pier foundation.
requirements. They can completely zero The second major challenge was
out their monthly electric bill and still the site’s single-phase service. During
enjoy all benefits of true ownership, the initial project planning stage, Same
including the federal tax credit. They Sun’s design target was a 150 kWac
also have the option to retire or sell their system interconnected to a 3-phase
renewable energy certificates. service. However, the nearest 3-phase
solarprofessional.com | S O L A R P R O 71
Projects
Equipment Specifications
MODULES: 360 SolarWorld Sunmodule
Pro-Series XL SW 315, 315 W STC,
+5/-0 W, 8.71 Imp, 36.5 Vmp, 9.35 Isc,
45.6 Voc
INVERTERS: Single-phase 120/240
Vac 600 A service, 12 SMA Sunny Boy
7700TL-US, 7,680 W rated output, 600
Vdc maximum input, 270–480 Vdc rated
MPPT range, 125–500 Vdc operating
S a m e S u n of Ve r m on t (3)
MPPT range
ARRAY: 10 modules per source
circuit (3,150 W, 8.71 Imp, 365 Vmp,
9.35 Isc, 456 Voc), three source circuits
per inverter (9,450 W, 26.13 Imp, 365
Vmp, 28.05 Isc, 456 Voc), 113.4 kWdc
array total
ARRAY INSTALLATION: Driven-pile distribution for the actual site was row ends. To optimize component costs,
ground mount, RBI Solar GM-I racking, too far away to justify the cost of a the electrical design bumped the dc:ac
180° azimuth, 25° tilt line extension. Given the specific line power ratio up to just under 125%. In
INVERTER AC COMBINERS: Two location and proximity to a substation, addition, the design specified parallel
12-circuit two-pole ac panels, 40 A Green Mountain Power allowed for a sets of aluminum homerun conductors
breakers maximum plant capacity of 100 kWac, to minimize costs while keeping ac volt-
SYSTEM MONITORING: Solar-Log 1000 which was somewhat larger than antici- age drop at an acceptable level.
revenue-grade meter with CTs and cellu- pated considering the site’s single- “In my 15 years working in the solar indus-
lar modem, Solar-Log WEB Commercial phase service. try, this project was undoubtedly one of the
Edition monitoring package To help mitigate the increased most rewarding. Like all solar projects, it
costs associated with the single-phase had its unique challenges—most notably
system’s long, high-current conductor developing a progressive community solar
runs, Same Sun aggregated the 12 SMA model and orchestrating an off-site genera-
Do you have a recent PV Sunny Boy 7700TL-US inverters behind tion project with so many stakeholders.
or solar heating project the array closest to the point of inter- Connecting the dots between a parcel of
we should consider for connection. This reduced the ac run by fallow land and Vermonters who couldn’t
publication in SolarPro? approximately 200 feet. The system’s otherwise go solar was priceless.”
Email details and photos to: source-circuit layout mitigates early —Khanti Munro, Same Sun of
projects@solarprofessional.com morning and late afternoon shading on Vermont
72 S O L A R PR O | March/April 2016
Lower your Labor Cost
with ACRak
®
1P 4P 24P
1-Panel Package 4-Panel Package 24-Panel Package
11,500 Employees
www.solectria.com | inverters@solectria.com