Professional Documents
Culture Documents
Fielded PV Module
Reliability and Durability
String Inverter
Tech Specs
143 Inverter Models for
Utility, Commercial and
Residential Systems
Solar Workforce
Development
Expanding the Careers,
Training and Diversity
of Solar Professionals
Projects
RA Power & Light
Assured Solar Energy
COMPLIMENTARY ISSUE
COURTESY OF
chintpowersystems.com
See the PV210 in
action with NFC
Stay ahead
of the curve
With the PV210 test and diagnostic tool, PV system
O&M has never been easier or more affordable.
Perform safety tests and produce detailed I-V curves
to view instantly on a mobile device.
Visit www.seaward-groupusa.com/PV210
or call (813) 886 - 2775
Got Reliability?
Contact us today!
t: 866.438.8408
e: sales@ginlong-usa.com
Made by Ginlong Technologies
w: www.ginlong.com ‘SolisWEB’ App NOW available
Contents January/February 2016 Issue 9.1
Fe a tu re s 32
C-MAX
TECHNOLOGY
D e p a r t m ent s
FRONT END
10
8 Contributors Experience + Expertise
62 Advertiser Index
30 minutes 48 1,440 17,520
14
15 minutes 96 2,880 35,040
best
period.
Kate Trono, PE, is the vice president of Copyright © 2016 Home Power, Inc. Contents may not be reprinted or otherwise reproduced
without written permission. SolarPro is a registered trademark of Home Power, Inc.
products at SunLink. She heads the prod-
While SolarPro strives to publish only safe and accurate content, we assume no responsibility
uct management of SunLink’s roof, tracker
or liability for the use of this information.
and fixed-tilt mounting systems and leads
Interior paper is made from 85%–100% recycled material, including 20%–30%
its PowerCare services division. Trono postconsumer waste.
holds a BS in civil engineering and an MS National Electrical Code®, NFPA 70® and NEC® are registered trademarks of the National Fire
in structural engineering from the Univer- Protection Association, Quincy, Massachusetts.
8 S O L A R PR O | January/February 2016
/ Perfect Welding / Solar Energy / Perfect Charging
JOIN US IN #24HOURSOFSUN.
WWW.24HOURSOFSUN.COM
Fronius Introduces
Revenue-Grade
Metering SunModo Releases
Self-Grounding
[Portage, IN] Fronius USA began manufacturing the Primo non- Mounting System
isolated string inverter line at its US facility in 2015. The Primo
product family comprises nine single-phase models with rated [Vancouver, WA] The
power outputs ranging from next-generation Self-
3.8 kW to 15 kW. Primo inverter Grounding System from
features include two MPP track- racking and mounting man-
ers, onboard Wi-Fi for streamlined ufacturer SunModo offers
system commissioning and moni- a proprietary built-in grounding pin that is integral to
toring, and a recently introduced each system component. The Self-Grounding System
option for revenue-grade metering. includes mid and end clamps for both portrait- and
The new option allows for ANSI- landscape-oriented arrays, as well as rail-to-rail splices
certified production metering at and a grounding lug. All components provide PV
2% accuracy with no additional system equipment grounding per UL 2703 and NEC
hardware or labor required. Section 690.47. SunModo’s new system streamlines
Fronius USA / 877.376.6487 / array installation and eliminates the need for integrators
fronius-usa.com to order, stock and manage grounding hardware such
as clips and straps on the job site.
SunModo / 360.844.0048 / sunmodo.com
10 S O L A R PR O | January/February 2016
Connect with us!
Did you know that nearly 25% of all solar electricity in North America flows
through a SolarBOS product? Ever wonder why?
12 S O L A R PR O | January/February 2016
Quick Rack TM
“ Quick Rack is truly the next generation in rail-free mounting systems, enabling us to
deliver aesthetically pleasing rooftop solar that differentiates us from our competition.
We’ve been experimenting with rail-free solar mounting for a while, but systems before
Quick Rack limited our selection of panels and were extremely difficult to service.
I consider Quick Rack a must-have solution for installers who want their systems to last.
– Glen Koedding
President, Green Sun Energy Services, LLC
14 S O L A R PR O | January/February 2016
MS-PAE Inverter/Charger
MMP Interconnection
System Equipment
NEW!
EXCELLENCE: EXPANDED
Your customers have come to rely on Magnum Energy products for their vital
off-grid applications. Easy-to-install, easy-to-use, and reliable. We have expanded
our line with the NEW MicroGT 500 Inverter. The MicroGT 500 offers a lot in a little
box: grid-tie, dual MPPT, module-level power electronics, and optimized for future
MicroGT 500 Inverter
expansion to a Magnum battery-based system.
NEW!
MPPTsolid 230/100
RUGGED &
RELIABLE
• 230 Voc
• 24V/48V/72V compatability
520-777-7906
16 S O L A R PR O | January/February 2016
data are essential for modeling when
0.30 customers consume PV-generated
energy on-site versus exporting it to
0.25 SDG&E DG-R rate the grid, which will determine their
Savings ($/kWh)
solarprofessional.com | S O L A R P R O 17
QA
80
Co ur te sy E ne r g y To o l ba se
18 S O L A R PR O | January/February 2016
solution providers that independently utility-collected interval data. One key instances, such as energy storage
measure and log interval data. advantage of using third-party hardware applications, where interval data
UtilityAPI (utilityapi.com), for is that developers can select the interval are already a prerequisite for project
example, is a popular software ser- period to capture the highest-resolution developers. If the federal invest-
vice that facilities the easy retrieval of data possible. For example, eGauge ment tax credit sunsets at the end
interval and billing data from utility Systems (egauge.net) offers web-based of 2016, downstream solar compa-
websites. Project developers can use energy and power meters that can cap- nies will need to become that much
this service to send a link to customers ture data at 1-second intervals, which more sophisticated simply to remain
whose data they want to access. After provides data resolution 900 times competitive. If the trend of declining
securely entering their login creden- higher than that of 15-minute interval incentives and less favorable utility
tials, customers can authorize the data. Another advantage of eGauge’s rate structures continues, develop-
utility to send these data directly to system is its ability to measure circuit- ers will need to extract every dollar
the requesting party. This streamlines level loads. In other words, developers of energy savings possible from their
the data fetching and retrieval process could use the system to measure and log projects, which will require them to
for all parties. consumption data for a specific appli- leverage raw interval data. In the
An increasing number of prod- ance such as an HVAC unit. not-too-distant future, optimizing
ucts and services can capture interval system designs and identifying the
consumption data independent of the The Future of Interval Data best time-of-use rate plan will be
utility. While going this route requires I am very bullish on the future of a necessity for project developers
installing hardware—such as datalog- interval data and believe that its rather than a luxury.
gers and communication gateways—it use in PV project development will —Adam Gerza / Energy Toolbase /
also offers some advantages over continue to grow rapidly. There are San Francisco, CA / energytoolbase.com
DURABILITY TEST
solarprofessional.com | S O L A R P R O 19
Fielded PV Mo
F
ielded module performance
is essential not only to PV
project profitability, but also To the extent that
Compiled by to the solar industry’s long-
term viability. In a report for industry stakeholders
David Brearley the Solar America Board for
Codes and Standards (see can optimize fielded
Resources), Mani Tamizh-
Mani and Joseph Kuitche note: “Technology risk—the concern that module performance by
a technology will underperform (durability) or become obsolete
prematurely (reliability)—is one of the major barriers to PV diffu-
sion and project financing.” In effect, more than 95% of fielded PV
minimizing hard losses
modules need to meet or exceed manufacturers’ product and power
warranty terms to satisfy investors.
due to failures and soft
Given that PV system service life is measured in decades, the
acceptable performance standard for PV modules is a high bar to losses due to degradation,
meet. The good news is that the industry literature summarized
by TamizhMani and Kuitche suggests that failure rates (reliability they can enhance the
losses) and degradation rates (durability losses) are on the order of
0.005% to 0.1% per year and 0.5% to 0.8% per year, respectively. The solar value proposition for
bad news is that module manufacturers are constantly adapting
module construction and design to drive down product costs and customers and strengthen
the levelized cost of energy, so past performance is no guarantee of
future results.
For this article, I reached out to seven subject matter experts—
the position of companies
technical due diligence specialists, independent engineers, system
risk assessors, researchers, O&M service providers and so forth—to
throughout the value chain.
find out what industry stakeholders can do to optimize module reli-
ability and durability in the field and to identify and remedy unavoid-
able performance problems. Not surprisingly, this is a continuous
process that starts with technical due diligence during product pro-
curement, relies heavily on system design and installation best prac-
tices, and extends through plant operations.
20 S O L A R PR O | January/February 2016
odule
Reliability and Durability
solarprofessional.com | S O L A R P R O 21
Fielded Module Reliability
This does not mean that the industry is experiencing product at a third-party lab. I’ve seen a lot of variation in
or will experience a crisis of reliability. Rather, industry test results between initial samples provided by equipment
stakeholders need to be diligent about identifying and suppliers and random samples selected from inventory by
correcting module reliability issues early. If we properly buyers or their representatives.
communicate field data, module manufacturers can pro- —Brian Grenko, chief executive officer, Amplify Energy
actively remediate reliability issues. Potential-induced
degradation (PID) is a good example of this feedback loop. Stakeholders should engage a due diligence firm to vet the
PID is a failure mode that emerged in PV modules as a con- supplier before committing large projects to a particular mod-
sequence of material changes combined with new instal- ule manufacturer or model number. This could be as simple as
lation techniques. Because the industry identified and selecting a prevetted module, on the one hand, or as involved
classified this defect, most module manufacturers know as conducting third-party tests at the factory, on the other.
how to design products that will not experience this fault —Paul Hernday, senior performance engineer, Vivint Solar
mode in the future.
—Rob Andrews, chief executive officer, Heliolytics Especially with large-scale PV projects, it is important that
module-supply agreement negotiations ensure consis-
PV system owners and installers should take two fundamen- tent manufacturing quality across the production sched-
tal measures to significantly mitigate the risk of premature ule. This requires factory and product inspections during
PV module failures. First, PV system designers should take a manufacturing, as well as a clearly defined quality control
holistic approach to product selection and use only properly protocol. Stakeholders can also propose accelerated testing
vetted products, installation methods and design principles. sequences at the early stages of a PV project. While it is dif-
While innovation is obviously critical to cost reduction, it ficult to extrapolate test results to real-world performance,
comes with risk, so due diligence is vital. Equipment manu- the results are valuable for making relative comparisons
facturers are increasingly designing products to integrate between different module suppliers and bills of materials.
with other BOS components, and certification protocols are These are just a few examples of the types of technical sup-
adapting, so coordination among vendors is more impor- port services that Enertis provides to industry stakeholders,
tant today than ever before. Secondly, given the underly- including financial entities, insurance companies, invest-
ing nature of certain types of PV module defects, a robust ment funds, private investors, developers, engineering com-
supplier-quality program is critical to ensuring long-term panies, contractors and equipment suppliers.
quality assurance. This involves not only an initial qualifica- —Vicente Parra, PhD, head of quality and testing services,
tion of the supplier, but also regular witnessing of produc- Enertis Solar
tion and validation testing of randomly sampled finished
As an O&M provider to more than 1.5 GW of PV assets, we
would like to see stakeholders pay more attention to the
quality control of materials used in the manufacturing pro-
cess. We also recommend that stakeholders implement peri-
odic independent testing, both in the field and at warehouse
storage facilities.
—Rue Phillips, chief executive officer, True South
Renewables
22 S O L A R PR O | January/February 2016
MORE
POWER
TO YOU
Generate more electricity with fewer panels
FACT: without the highest quality solar panels you won’t yield as much electricity
as you could. That’s where 40 years of solar experience sets Panasonic solar
panel HIT® apart from the pack.
The secret lies in our unique cell structure and other proprietary technologies.
By reducing carrier loss at a higher rate than conventional panels, this advanced
cell absorbs and retains more radiation from the sun even at higher temperatures.
This ultra high-efficiency results in higher power output.
Our new 330W panels employ 96 cells in the same size footprint and produce up
to 36% more solar power compared to standard 60-cell panels. That means more
Unique water drainage
output per square foot than mass-produced units, fewer panels to install, and
higher savings over a 25-year lifecycle.
Ideal for limited roof areas. Welcome news for installers and homeowners.
Learn more about offering your customers the most efficient solar panels
available - visit business.panasonic.com/solarpanels
Fielded Module Reliability
C ou r te sy He l i o l y ti c s
detection of failures means timely replacement of
modules and minimal loss of production.
—Timothy Silverman, scientist, NREL
24 S O L A R PR O | January/February 2016
AZISNA2016_Home Power_Aussteller_86x244_Layout 1 13.11.15 09:20 S
Also, the field of view of IR imagers is still relatively narrow, Exhibit now!
so you need to stand quite far from the array to image mul-
tiple modules, which isn’t always a possibility based on con-
ditions in the field.
—Paul Hernday, Vivint Solar
solarprofessional.com | S O L A R P R O 25
Fielded Module Reliability
C our te sy E ne r ti s
meet calibration require-
ments to authenticate
the test results and meet
industry standards. This
ensures that the test mea- Mobile testing laboratory Enertis’ PV Mobile Laboratory is capable of testing module perfor-
surements are accurate for mance to IEC standards in the field, which can simplify performance verification for warranty
all types of PV modules. claims on large-scale projects.
Mobile PV test solutions
equipped with high-quality solar simulators, such as our PV field-testing actions. However, there are cases where prob-
Mobile Lab, are very practical assets in this context. lems may lay hidden for a long time before they set off a low-
—Vicente Parra, Enertis Solar performance alarm. An ideal approach is to take proactive
steps to identify these types of latent issues, while being
High-quality module-level thermal audits using commercial- budget conscious. Since most failed modules release ther-
grade thermal cameras are the most effective method for iden- mal energy, regular thermal imaging is a reliable method for
tifying module losses. Our approach to annual testing varies identifying a large percentage of potential module problems.
from contract to contract. Some contracts require that we test We recommend routine IR thermal imaging as part of a well-
100% of the PV source circuits, while others require that we designed preventive maintenance package. Technicians can
test only a subset of source circuits. Personally, I advocate for complete these IR tests on the ground or use unmanned aer-
electrical testing on every source circuit and thermal scanning ial drones, depending on the scale of the system.
on every PV module. In my opinion, commissioning, validation Portable EL imaging systems are useful for a more-
and acceptance tests need to play a far more important role in detailed analysis of performance issues. This method is min-
the technical and financial diligence process for PV assets. imally disruptive to plant operations, as technicians can test
—Rue Phillips, True South Renewables modules without removing them from the racking. While
sending modules to an independent laboratory for analy-
We normally start with an analysis of any available historical sis is another option, it is both costly and time consuming.
performance data. On production systems, this is often lim- Moreover, concerns about damage resulting from module
ited to yield, which is such a noisy measurement that it can removal, packing and transport can complicate warranty
be difficult to identify specific problems. We are developing claim procedures. A mobile truck-mounted lab is a potential
more-advanced monitoring techniques that will allow us to solution in cases where a large number of modules need to
detect problems within that noisy signal before they become be tested for the purpose of backing warranty claims.
major losses in production. If the performance data suggest —George Touloupas, CEA
there’s a problem, we proceed with a formal visual inspec-
tion, which usually produces some leads about what could be In your experience, what are the most
going wrong. From there, we may select modules on which to common failure modes or performance
perform outdoor I-V curve measurements, IR thermography problems for fielded PV modules?
and outdoor photoluminescence imaging. These techniques
usually get to the bottom of any remaining mysteries. The majority of the faulted modules in our scans are due
—Timothy Silverman, NREL to string outages. The remaining faults are due to module-
related failure mechanisms, which we categorize as hot
A good monitoring system with data analysis software spots, submodule faults or module faults. Hot spots indicate
should be able to indicate problems in the field and trigger some type of cell or solder issue, the most common of which
26 S O L A R PR O | January/February 2016
0.90 advanced cell damage across an entire module or damaged
0.80 junction box wiring.
It is important to point out that in the case of hot spots
Failure rate (%)
0.60
and diode faults, the module is still capable of produc-
ing power, though likely less than the warrantied output.
However, all of the module failure modes will decrease the
0.40
effective string voltage and will de-rate the output of the
remaining modules in the source circuit. Thus, module-level
Co ur te sy He l i o l y ti c s
FEATURING:
PV SITE ASSESSOR TRAINING (PV 201) &
SOLAR THERMAL SITE ASSESSMENT (ST 201)
solarprofessional.com | S O L A R P R O 27
Fielded Module Reliability
Unfortunately, some defects in PV module design, mate- defects will lead to performance degradation over time. We
rials and workmanship are not easily detected at the time also see junction box and connector failures that can lead to
of project commissioning and manifest over time based on arcing and pose a fire hazard.
site conditions. Prolonged UV exposure activates prema- —George Touloupas, CEA
ture EVA or backsheet yellowing. Snail trails evolve from
solar cell microcracks after exposure to humidity. PV mod- What types of PV module failures are most likely
ules prone to PID degrade prematurely in warm, wet or salty to result from mishandling or from system design
environments, depending on the PV system grounding con- deficiencies? Do you have any recommended
figuration. Improved durability test standards have made best practices for avoiding these issues?
it easier to detect these problems, most of which are an unin-
tended consequence of product design optimization. We have seen two fault mechanisms where installation or design
—Brian Grenko, Amplify Energy practices clearly led to cell damage. We traced the first fault
mechanism to overtightened module-mounting clamps, which
Within the first 2 years of operation, there are three failures caused cell damage near the module frame. We traced the sec-
or defects that we detect most often in the field: potential- ond fault mechanism to a lack of access pathways, which caused
induced degradation, which is most common in hot and technicians to walk on the flush-mounted modules. In this case,
humid climates; polymer discoloration; and snail trails, we were able to see the technicians’ favorite walking routes in the
which are associated with internal cell cracks. We also find hot-spot patterns associated with the cracked cells.
module junction box failures in module infancy. As systems —Rob Andrews, Heliolytics
age, we start to see hot spots, the effects of environmental
corrosion and simple electrical insulation losses, such as Physical damage to the glass, frame or backsheet that is
scratched backsheets, caused by mishandling during mod- easy to identify through visual inspection reveals many ship-
ule installation. ping and handling issues. However, mishandling can also
—Vicente Parra, Enertis Solar result in cell microcracks, which are significantly more dif-
ficult to detect. While PV module manufacturers usually
We mainly examine systems that are at least 10 years old, conduct EL imaging in the factory to identify microcracks
so we often see cracked cells, for quality assurance pur-
failed diodes and delaminations. poses, few industry players
Some systems have widespread have the capability to do so
hot spots due to failed intercon- in the field. Over time, micro-
nects. We have also seen broken cracks in fielded PV modules
glass due both to internal elec- can develop into hot spots.
trical failures and to impacts. We Generally accepted best prac-
often encounter performance tices for mitigating shipping
problems due to soiling, shade damage include packaging PV
and snow. Sometimes different modules vertically to reduce
system design or O&M prac- vibrational stress and design-
tices could have reduced these ing structurally sound pallets
losses, but they are unavoidable optimized for packing into
in some cases based on location shipping containers.
and climate. Ergonomically, two peo-
—Timothy Silverman, NREL ple are needed to handle a
PV module properly. I always
The module defects that we dis- cringe when I see someone
Co u r t es y E ne r t i s
28 S O L A R PR O | January/February 2016
It is well documented that most PV modules
leave the factory with some degree of micro-
cracking, and that transportation and handling
induce additional cell cracking. Mishandling
can also gouge the module backplanes, allow-
ing greater moisture ingress and possibly con-
tributing to PID. Installers should never stand
on modules or module frames. It’s important to
realize that cell cracks are not immediately vis-
ible to the eye and are not audible. Evidence of
cell cracks—such as snail trails or hot spots—
might not appear for many months.
—Paul Hernday, Vivint Solar
C ou r te sy A m plif ie d E n e r g y
glass breakage or internal cell cracking due to
improper handling, both in the field and during
transit to the site on a pallet. At the commis-
sioning stage, we see damage reports associ-
ated with backsheet scratches. These are easy
to detect via EL since perforations damage the
back surface field of the PV cell. On-site training Potential-induced degradation After IV-curve tracing confirmed that mod-
is a good way to mitigate these problems. You ules were underperforming at this site, Amplified Energy captured these EL
can also implement quality control activities at images in the field to reveal PID as the root cause of the problem.
different project stages, such as preshipment,
post-shipment (seaport or on-site), during
installation and after mounting. serious problems and invalidate the warranty. Installers
—Vicente Parra, Enertis Solar should always work in pairs when handling modules. They
should never walk on modules and should avoid leaning
Mishandling leads primarily to cracked cells. These cracks on them. Installers should also torque mounting clamps to
are not visible to the eye and do not cause a detectable loss manufacturer-specified values and avoid placing strain on
of performance until thermal cycling causes the gridlines junction box cables.
bridging the cracks to break. This delay makes it difficult System design deficiencies may also directly or indirectly
to definitively attribute the performance degradation to cause modules to fail. For example, incorrect string length
mishandling. The solution is to communicate to install- will lead to arcing damage due to excessive voltage. Wrong
ers that stepping on modules, dropping modules or drop- material interface between module frame and racking or
ping objects onto modules can cause invisible, permanent grounding gear will cause electrochemical corrosion. One
damage. In some cases, the selection of mounting hard- way to avoid these issues is to engage a third-party agency,
ware can determine whether an installer is forced to step in the early stages of a project, to evaluate system design and
on a module. installation practices.
— Timothy Silverman, NREL —George Touloupas, CEA
The primary defects caused by module mishandling include What steps can project stakeholders take
microcracks, backsheet punctures, broken glass and frame to expedite PV module warranty claims?
damage. Over time, these defects cause a range of failures such
as electrical leakage, low-power output, hot spots and arcing We have found that it is possible to expedite warranty return
faults. Simple measures can prevent many of these defects. processes by combining full-site coverage for module fault
Well-organized logistics can assure that modules are not detection activities with strong, consistent documentation.
subjected to excessive shocks during transportation. Use inex- On one project, for example, our module-level thermal audit
pensive shock stickers, for example, to raise rough-handling detected a large number of submodule faults. By analyzing
alarms that initiate on-site screening procedures, such as serial numbers, we found a strong correlation between these
EL testing. It is also very important to follow the manufac- faults and a specific manufacturing batch, which suggested
turer’s installation instructions, as failure to do so may cause a manufacturing defect. Since we knew the exact locations of
solarprofessional.com | S O L A R P R O 29
Fielded Module Reliability
Preshipment inspection Inspecting modules at the factory is one It would expedite claims and generally improve the
way to improve fielded module reliability and durability. This chart warranty process if OEMs documented an accepted
describes the distribution of the defects that CEA found at a Tier 1 process for testing and confirming failures in the
module manufacturing facility while conducting a 30-plus MW quality field. On one project, the OEM insisted that the sys-
assurance project on behalf of an international developer. tem owner purchase replacement modules before
they would provide a refund against the faulty mod-
the faulty modules, we collected a sample set of faulted mod- ules returned for failure confirmation.
ules for follow-up testing. When these tests revealed that the —Rue Phillips, True South Renewables
sample modules exhibited a common fault mode, we used
our high-resolution thermal audit dataset to initiate a war- Manufacturer warranties are limited and generally biased
ranty return process for all of the modules exhibiting these unfavorably against the buyers. As a result, the claim pro-
particular submodule fault characteristics. Highly consis- cess may prove lengthy, complicated and costly. Resolution
tent data made this claims process possible. We collected times depend on the nature of the defect, which may compli-
all of the data at the same time, using the same instrument. cate the proof, as well as the commercial policy and general
—Rob Andrews, Heliolytics standing of the manufacturer. No two cases are alike, and
there is no general rule that describes the course of a war-
I recommend that PV system operators familiarize themselves ranty claim. Tier 1 manufacturers are not necessarily more
with the PV module warranty, which should clearly define efficient in honoring their warranties than smaller suppliers.
each party’s responsibilities and the process for obtaining The best things buyers can do are to choose modules that
service in the event of a claim. It’s reasonable for manufactur- have been extensively tested and preventatively implement
ers to request certain information about the claim to expe- quality assurance measures throughout project develop-
dite processing, such as a detailed explanation of the problem ment. The earlier a problem is identified, the easier it is for
and affected serial numbers. In previous roles, I was able to the manufacturer to provide a remedy.
administer many customer claims quickly and remotely, pro- —George Touloupas, CEA
vided the quality of data was sufficient. At Amplify Energy,
we often identify PV module defects when conducting g C O N TAC T
on-site inspection and testing. To address these issues in a
David Brearley / SolarPro / Ashland, OR /
safe, efficient and cost-effective manner, we work with PV
david.brearley@solarprofessional.com / solarprofessional.com
module manufacturers to make authorized immediate repairs
on their behalf, such as bypass diode replacement and back- RESOURCES
sheet repair. Certain solar operations and maintenance firms TamizhMani, GovindaSamy (Mani) and Joseph Kuitche, “Accelerated
provide a similar service for inverters. Lifetime Testing of Photovoltaic Modules,” Solar America Board for Codes
—Brian Grenko, Amplify Energy and Standards, July 2013
30 S O L A R PR O | January/February 2016
Hasta La Vista, Rails.
Introducing the new standard of rail-less mounting systems.
Faster installs. Lower hardware cost. Free shipping.
• One tool, two SKUs • Composite & tile roofs • 120 kW per pallet
• Standard PV frames • Landscape & portrait • UL 2703 certified
• Up to 6’ rafter spacing • Integrated grounding • Permit package ready
www.pegasussolar.com
2016
Single and 3-Phase
String Inverter
Specifications Compiled by Joe Schwartz
32 S O L A R PR O | January/February 2016
U
pdated for 2016, SolarPro’s current string-inverter
dataset includes 143 string inverter models from
13 manufacturers. A Nationally Recognized Testing
Laboratory (NRTL) has listed all the products in the
table to the UL 1741 standard. In addition, most of the invert-
ers are identified in the CEC list of eligible inverters per SB1
guidelines. All of the manufacturers represented maintain one
or more established US sales and technical support offices.
The last edition of our string-inverter dataset was pub-
lished in the August/September 2014 issue of SolarPro, where
I identified some high-level trends that included an increas-
ing shift to transformerless, non-isolated topologies, and the
development of higher-power, higher-voltage 3-phase string
inverters for commercial, industrial and select utility projects.
These trends have continued over the past 18 months. More
than 85% of the string inverters in this year’s dataset are non-
isolated. As well, this year’s dataset features 55 3-phase units
and 47 string inverters listed for applications over 600 Vdc.
Notably, the highest-capacity inverter represented has a rated
power output of 60 kW and weighs a mere 121 pounds.
On the vendor front, Advanced Energy was a significant
exit from the inverter market, taking Refusol’s acquired line
of 3-phase string inverters with it. SolarMax was another
market exit worth mentioning. Finally, SolarEdge made a big
splash at the Solar Power International conference with the
announcement of its new MOSFET-based HD Wave topology.
Corresponding datasheets and installation manuals were not
available when I aggregated values for the 2016 edition of the
SolarPro string inverter specifications dataset. I will update
the Excel-based version of this dataset when these specifica-
tions are released.
Visit solarprofessional.com to download a Microsoft
Excel file containing the inverter specifications compiled in
this table. SolarPro permits and encourages solar design and
installation companies to integrate this data with their own
sales and design databases.
g C O N TAC T
Joe Schwartz / SolarPro / Ashland, OR /
joe.schwartz@solarprofessional.com / solarprofessional.com
Manufacturers
ABB / 877.261.1374 / abb.com/solarinverters
Chint Power Systems / 855.584.7168 / chintpower.com/na
Delta Americas / 510.668.5100 / delta-americas.com
Fronius USA / 877.376.6487 / fronius-usa.com
Ginlong / 866.438.8408 / ginlong-usa.com
HiQ Solar / 408.970.9580 / hiqsolar.com
Ingeteam / 408.524.2929 / ingeteam.com
KACO new energy / 415.931.2046 / kaco-newenergy.com
Schneider Electric / 888.778.2733 / schneider-electric.com
Co u r t e s y H iQ So l ar
Co u r t e s y H iQ So l ar
solarprofessional.com | S O L A R P R O 33
String Inverter Guide
34 S O L A R PR O | January/February 2016
Footnote Key
1
Per MPP tracker 8
1502x–5002x inverters without disconnects 12
Available with Smart Module Mode for Tigo 18
570–800 @ 400 Vac
2
Adjustable: 120–350 Vdc available. Electrical specs are identical and Ampt compatibility 19
98% CEC efficiency @ 400 Vac
3
Adjustable: 250–500 Vdc for x and xi models 13
With optional PSD disconnect 20
P400 power optimizer
4
Wiring box is available in multiple product variants 9
Integrated Tigo Energy Maximizer 14
DC disconnect dimensions: 12 × 7 × 7.5 in. 21
P600 power optimizer
5
MPPT 1/MPPT 2 Management Unit 15
DC disconnect weight: 8 lbs. 22
P700 power optimizer
6
600 Vdc, 150–500 Vdc MPPT model available 10
Supplies PV power at < 550 Vdc 16
DC disconnect dimensions: 11.7 × 7.3 × 7.5 23
-40–140°F version available
7
Connector approved as load-break disconnect 11
Module-level MPP tracking 17
With SMA Connection Unit 1000-US DNR = Did not report
solarprofessional.com | S O L A R P R O 35
String Inverter Guide
Ginlong Solis-3K-2G-US yes no no yes passive 4X 25.9 x 13.3 x 6.5 33 ETL 10/15, 20
Ginlong Solis-3.6K-2G-US yes no no yes passive 4X 25.9 x 13.3 x 6.5 33 ETL 10/15, 20
C O N T I N U E D O N PA G E 3 8
36 S O L A R PR O | January/February 2016
GET MORE WITH
THE WORLD’S ONLY TRUE
COMMERCIAL SOLUTION
MORE POWER...
WITH THE SUNNY TRIPOWER TL-US
Maximize your system’s energy production with the
Sunny Tripower’s class-leading efficiency and proven
reliability. And with SMA’s OptiTrac Global Peak MPP
tracking, challenging rooftops are no longer a concern.
MORE FLEXIBILITY...
WITH SMA TECHNOLOGY
The Sunny Tripower TL-US makes design simple and
repeatable. Two MPP trackers, 600 or 1000 V DC
operation, powerful monitoring options, and the SMA
ReadyRack™ rooftop kit make it ideal for any application.
MORE PROFIT...
WITH SMA’S COMMERCIAL O&M
Commercial projects aren’t complete when you turn the
power on. SMA’s #1-ranked service team protects against
lost profit through a host of essential O&M services and
helps realize the full potential of your PV investment.
38 S O L A R PR O | January/February 2016
Footnote Key
1
Per MPP tracker 8
1502x–5002x inverters without disconnects 12
Available with Smart Module Mode for Tigo 18
570–800 @ 400 Vac
2
Adjustable: 120–350 Vdc available. Electrical specs are identical and Ampt compatibility 19
98% CEC efficiency @ 400 Vac
3
Adjustable: 250–500 Vdc for x and xi models 13
With optional PSD disconnect 20
P400 power optimizer
4
Wiring box is available in multiple product variants 9
Integrated Tigo Energy Maximizer 14
DC disconnect dimensions: 12 × 7 × 7.5 in. 21
P600 power optimizer
5
MPPT 1/MPPT 2 Management Unit 15
DC disconnect weight: 8 lbs. 22
P700 power optimizer
6
600 Vdc, 150–500 Vdc MPPT model available 10
Supplies PV power at < 550 Vdc 16
DC disconnect dimensions: 11.7 × 7.3 × 7.5 23
-40–140°F version available
7
Connector approved as load-break disconnect 11
Module-level MPP tracking 17
With SMA Connection Unit 1000-US DNR = Did not report
solarprofessional.com | S O L A R P R O 39
String Inverter Guide
40 S O L A R PR O | January/February 2016
String Inverter Guide
42 S O L A R PR O | January/February 2016
Footnote Key
1
Per MPP tracker 8
1502x–5002x inverters without disconnects 12
Available with Smart Module Mode for Tigo 18
570–800 @ 400 Vac
2
Adjustable: 120–350 Vdc available. Electrical specs are identical and Ampt compatibility 19
98% CEC efficiency @ 400 Vac
3
Adjustable: 250–500 Vdc for x and xi models 13
With optional PSD disconnect 20
P400 power optimizer
4
Wiring box is available in multiple product variants 9
Integrated Tigo Energy Maximizer 14
DC disconnect dimensions: 12 × 7 × 7.5 in. 21
P600 power optimizer
5
MPPT 1/MPPT 2 Management Unit 15
DC disconnect weight: 8 lbs. 22
P700 power optimizer
6
600 Vdc, 150–500 Vdc MPPT model available 10
Supplies PV power at < 550 Vdc 16
DC disconnect dimensions: 11.7 × 7.3 × 7.5 23
-40–140°F version available
7
Connector approved as load-break disconnect 11
Module-level MPP tracking 17
With SMA Connection Unit 1000-US DNR = Did not report
solarprofessional.com | S O L A R P R O 43
String Inverter Guide
44 S O L A R PR O | January/February 2016
New technology,
crafted with Old World values.
We’ve been developing heat pump water heaters since the mid-
1970s. In energy-conscious Germany, with a tolerance for only
the finest engineering, our heat pump water heaters
have been the best-seller for over 35 years.
German
Engineering
Accelera® 220 E
58-gallon
heat pump water heater
800.582.8423 solarprofessional.com | S O L A R P R O 45
www.stiebel-eltron-usa.com
Solar Workforce
Development
2.0
By Matthew Hirsch
i S t o ck
46 S O L A R PR O | January/February 2016
To come of age,
the solar industry
needs new work-
force development creating opportunities for people to bootstrap themselves
into leadership positions. As solar starts to converge with
strategies.
other cleantech industries, competing for talent and mar-
ket share in the evolving smart GRID technology space, the
industry will have to confront a new workforce development
challenge. Companies can no longer rely on creating jobs and
letting the biggest stars on staff shine brightest. They will have
solarprofessional.com | S O L A R P R O 47
Workforce Development 2.0
11
12
13
14
20
20
20
20
86%
FOUR YEARS in each of the last two years by of the solar industry and lose sight of warning
solar jobs added
50K
since 2010 2.7% and 6.2% signs. After all, the solar workforce is outpacing the
RESPECTIVELY
0 national average job growth rate. The solar indus-
try’s growth rate accelerated from 13% in 2012 to
TOTAL JOBS BY TYPE 20% in 2013 and to 22% in 2014.
BY COMPARISON... SOLAR COAL
For years, a historically weak labor market in the
ALL OTHER
48 S O L A R PR O | January/February 2016
Powered by:
PV CONFERENCE
& EXPO
S h a wn S c h re in e r
brought a lot of its own volunteer trainees on staff
as it increased employee headcount from 100 to
250 over the last few years. Erika Symmonds, direc-
tor of workforce development at GRID Alternatives,
notes that her supervisor, currently in senior man- On the rise Installation companies account for the majority of US solar
agement, started out in the SolarCorps Fellowship, jobs. SolarCity, for example, employed more than 14,000 people in the
one of GRID Alternative’s career development pro- US as of October 2015, having added, on average, more than 500 new
grams. “Definitely, this is a part of our culture. If you employees per month over the calendar year.
go to our staff summit, most of the people you talk
to are going to say, ‘I started out as a volunteer,’”
Symmonds says. Energy Council released an updated version of its Solar Career
Part of her job is to track volunteers once they enter the Map (see Resources), which charts routes for advancement
workforce. She says a lot of recruiters tell applicants there within the solar field. Using 40 occupations, the map shows
are opportunities to move up from entry-level installer to that with continuing education, experienced installers can
crew lead within 6 months. GRID Alternatives is building move up to become project managers, commercial and util-
out its online volunteer portal and back-end databases so ity solar technicians, contractors and instructors, or they can
that former volunteers can provide feedback about where jump directly into work in PV system design and engineering
their career paths take them. One person in the office makes for utility interconnections. The map also illustrates how to
phone calls for hours daily to collect this information. “It’s progress between industry sectors, parlaying experience in
important that the career piece is there,” Symmonds says. operations into manufacturing opportunities, for example.
“Even though lower-level jobs in solar pay better than a retail The door is open for people to customize their career path.
job, I want to see people moving up in their solar careers.” Improve training opportunities. Ted Fawcett did not use a
At the 2015 Solar Power International convention and map to chart out his professional journey. His career stops
exhibition in Anaheim, California, the Interstate Renewable included work at a startup that reduced postal junk mail, a
position in the corporate division at Apple and a stint as a
boat captain in Hawaii. “I have about as nonlinear a career as
“Given the stark differences among employ- a person could have,” he says. In 2009, Fawcett looked at his
ers in their reporting regarding the use of skill set and interests, and decided to pursue sales positions
on-the-job training, third-party training and in the solar industry.
credentials, it is becoming clear that the solar He joined Sungevity with the idea that rapid growth at
the company would create opportunities. Soon Fawcett was
industry is searching for a consistent frame- leading the sales team and building a division to manage sales
work for training and evaluating talent. This originated by Sungevity’s installer partners. Success there
may become a problem quickly as the growth led Fawcett to join Clean Power Finance (CPF), bringing on
of the industry accelerates.” top-tier partners and reselling third-party products through
—The Solar Foundation, the CPF platform. After taking a leave from the industry to
National Solar Jobs Census 2014
take care of his newborn child, Fawcett picked back up with
Admirals Bank, helping the organization form a national
50 S O L A R PR O | January/February 2016
Ca r a mi a D e si g n
Employee retention As the solar industry scales, it has to compete with other industries—including electric utilities
and technology companies—for talent. The solar industry needs high-quality jobs and well-defined career paths to retain
skilled employees.
strategy and a sales team for a solar loan product to rival for more than 3 years gave the company a five-star review,
lease financing in the residential market. In March 2015, he calling it a “great place [with] room to grow,” but noted that
accepted an invitation to join Mosaic, another solar finance “there are no up-trainings for those who have been here for a
provider, as vice president of sales. while.” A SolarCity employee in senior management struck a
Looking back at his career in solar so far, Fawcett notes similar note in another recent Glassdoor review, describing
that he found the most effective training program not at the company as a “great place to work” but giving this advice
the technology-driven solar companies, but at Admirals to management: “More training for sales reps—quick growth
Bank—a 28-year-old institution that provides a variety and hiring may be hurting our brand.” A SunEdison consul-
of core banking services, including checking and savings tant recommended the company and highly rated its chief
accounts. “Training and development is maybe not the executive officer. Pros included the company’s “great sales
biggest priority for very small or rapidly growing or lightly tools,” and cons indicated that training “was minimal. Learn-
funded startups,” he says. At Admirals Bank, Fawcett partici- as-you-go type environment.”
pated in a yearlong series of management training sessions Foster diversity. Diversity is a huge topic in the solar
consisting of monthly meetings and homework assignments industry right now, and it has a big impact on employee
related to each month’s topic. retention. Erica Mackie, GRID Alternatives’ chief executive
The concept might seem simple, but Fawcett says imple- officer and co-founder, and Ahmad Chatila, SunEdison’s
mentation takes commitment from leadership, not merely a chief executive officer, have both made a strong case for the
change in perspective. Creating a training program requires business value of gender, racial and ethnic diversity in the
pulling back from current business models, analyzing the workplace (see Resources). Their organizations have taken
competitive landscape and executing new strategies to win. steps to address the fostering of diverse talent, launch-
“There’s a cost to it,” he says, adding that solar companies have ing the Women in Solar Initiative and the Realizing an
reached a point where some, including Sungevity and CPF, Inclusive Solar Economy program, supporting mentorships
have started making the investment. “It’s something we are and professional networking organizations such as Women
thinking about at Mosaic, to be a leader in the industry with in Cleantech and Sustainability, and hosting events to
a diverse talent pool and, given our size, provide training and stimulate the exchange of ideas and increase visibility for
advancement for our employees,” Fawcett says. people with diverse perspectives.
Companies without the resources to develop in-house While the solar industry is making some progress in
training programs can take advantage of third-party ser- terms of inclusivity, it still has a long way to go. According
vices. HeatSpring, for example, is an online platform that to the latest National Solar Jobs Census, the demographic
partners with industry experts, including SolarPro, to offer breakdown of the workforce is as follows: 22% women, 16%
a selection of solar-specific e-learning content. These digi- Latino and Hispanic, 7% Asian and Pacific Islander, and 6%
tal assets are similar to those found at Coursera, Udacity African American.
and Lynda.com. Several HeatSpring courses are available at Elena Lucas, chief executive officer of UtilityAPI, who also
no charge, while others require an enrollment fee. The next serves on the board at Women in Cleantech and Sustainability,
step is for top solar employers to join tech leaders—not just says she focused on gender diversity as the company grew
Google and Facebook, but also AT&T and General Electric— from 2 to 11 people during the past year. Four members of the
in driving the ongoing revolution in corporate training. team are women—but she readily admits the need to refo-
The need for better training is evident. On the jobs and cus on racial and ethnic diversity in the next round of hiring.
recruiting website glassdoor.com, in September 2015, an Another challenge is identifying people from diverse back-
anonymous reviewer who has been a Vivint Solar employee grounds to serve as high-level advocates. As Lucas started
solarprofessional.com | S O L A R P R O 51
Workforce Development 2.0
assembling an executive advisory board, she could think of The research and consulting firm Great Place to Work
only two women in leadership roles who had built companies (see Resources) publishes industry data showing that com-
in solar or cleantech and who were not potential UtilityAPI panies with a strong workplace culture experience less vol-
customers and therefore ineligible to serve on the board. untary turnover, reducing recruitment and training costs
Retain skilled workers. Employee retention is a huge topic and improving financial performance. Employers under-
among Fortune 500 companies right now. Consider the find- stand the return on investment of workforce development
ings of Deloitte University’s “Global Human Capital Trends policies. As the Deloitte human capital report shows, many
2015” report (see Resources), which is based on a labor mar- of them are doing something about it. Pfizer, AOL, Facebook
ket survey of 3,200 respondents. The survey asked business and others are using people analytics to identify workplace
leaders to rate the importance of workforce challenges and factors affecting high-performer retention. BP is using
their readiness to meet those challenges, and then it priori- analytics to evaluate its training programs. The value of
tized the results, starting with the most important topics company-specific training goes beyond skills development
requiring the greatest attention. Employee retention and for employees and managers. It contributes to employee
engagement topped the list. engagement and performance.
52 S O L A R PR O | January/February 2016
getting the message that employee retention is good busi-
ness. It is never too early, however, for business leaders in
solar to start addressing employee retention. They can take
Co ur te sy RE C So l a r
solarprofessional.com | S O L A R P R O 53
Workforce Development 2.0
54 S O L A R PR O | January/February 2016
Get the PV Training
and Education You Need
...in Paradise
56 S O L A R PR O | January/February 2016
over decades in the heavy equipment the notion of cyber attacks had even however, racking companies need to
industry, allows us to deliver a robust, occurred to anyone.” He interviews be more comfortable with construc-
reliable product to our partners while Craig Fugate, an administrator of tion practices. There’s a statistical
giving us the experience we needed to the Federal Emergency Management nature to using localized pull tests
become tracker experts. Agency, saying, “If someone was to generalize site-wide foundation
knowledgeable about the functioning designs, and there’s always going to
SP: What was the driver behind the addi- of a SCADA system and succeeded in be an element of “whatever it takes”
tion of O&M to SunLink’s service offering? hacking into it, that individual could to solve challenges encountered dur-
How does it improve project economics? engineer ‘a series of events that seem ing construction. By better under-
KT: With utility-scale systems, we often totally unrelated’ but which could, standing the priorities of installers,
get only a sliver of insight into how cus- according to Fugate, ‘turn the lights we’re able to put our project solution
tomers are comparing different technol- out very quickly over large areas.’” So recommendations in context, offering
ogies and how that’s affecting the overall for us, the priority is to deploy a com- best-practice guidelines from the util-
financials of a project. We’ll frequently plete next-gen SCADA solution, where ity segment to the commercial side of
hear, “What’s your racking price, and we offer unparalleled energy secu- the industry.
I’ll plug that number in.” But what we’ve rity through both tamper-resistant
seen since expanding our end-to-end hardware on-site and a hyper-secure SP: What are some of SunLink’s more
project solutions for the commercial cloud-based architecture. Basically, sophisticated considerations in engineer-
and small utility projects is that we can we’ve taken the lessons learned from ing analyses?
affect a lot more than just the steel price. FinTech and applied them to energy. KT: For instance, with roof-mount
O&M costs become interesting We also need to coexist with legacy project engineering, the load-sharing
when you start talking to the stake- SCADA systems, since the last thing assumptions of a particular system
holders who own the systems. Owners we want is to be another proprietary are both complicated to get right and
may have three monitoring systems box. So with new or retrofit projects, essential for proper engineering. To
on one site—the inverter’s system, the we offer the full security solution. But understand how strong each indi-
SCADA portal and a cloud-based data with any other project in a portfolio, vidual component of a product needs
monitoring system—and then those there’s still front-end compatibility to be, we have to do significant testing
three monitoring systems are com- and data analytics for superior busi- on the stiffness of the system. This is
pounded across a multitude of sites. ness intelligence. Now you have an something that can get pushed aside
Trying to figure out how to determine O&M offering for solar installations on in the race toward reducing balance of
values like portfolio-level IRR, or what a whole new level. system costs, but it is something that
is actually happening in the systems SunLink takes very seriously. No mat-
they own or whether they should send SP: What role does geotechnical testing ter the size of the project, we’re analyz-
someone out to a site to service equip- play in SunLink’s service offering? Do you ing the structural behavior of every
ment can be extremely difficult. There’s think that geotech is being adequately element when subjected to wind load
just so much data, and it’s all propri- addressed industry-wide? gusts and unbalanced snow loads.
etary in very closed boxes that can’t KT: Several racking providers offer
talk to each other. SunLink is focusing geotechnical services, and preproject SP: How has SunLink’s testing influenced
on the services and technology that we pile-pullout testing is more often requirements for roof-mount ballast-only
can offer to affect issues like these. than not a requirement, even before array mounting systems?
a racking supplier secures a purchase KT: When I first started at SunLink
SP: How is SunLink addressing pain order. For us, geotechnical services as an engineer on our R&D team, I
points such as compatibility issues offer a way to work closely with the headed our shake-table testing. To my
between PV plant data monitoring and customer early in the process. We knowledge, SunLink is still the only
command and control platforms? can better configure our products to solar company to have tested full-scale
KT: The key to this issue is to create more optimally suit the needs of a models of systems on a shake table.
a secure platform that maintains an project when we know exactly how Together with Rutherford + Chekene,
open environment. I recently read Ted the foundations will be engineered; we developed a displacement-based
Koppel’s bestseller Lights Out, where and we can take risk off the installer, analytical model that we verified
Koppel articulates the concern that which has the added benefit of reduc- through full-scale testing. We built out
SCADA systems were designed “before ing project costs. To see the benefits, roofs with different surface conditions
solarprofessional.com | S O L A R P R O 57
Interview
on the field station shake table at the the scale we’re currently seeing. Since doesn’t take into account energy pro-
UC Berkeley PEER laboratory and did a structural engineers typically learn the duction. When a module is mounted
week of full-scale seismic testing with most after a series of failures, the low in landscape, the bottom, middle and
our ballasted products. This testing, volume of installed solar projects and top substrings contain two rows of 12
underwritten in part by the California relatively short timeline of operation of cells each. In this orientation, a panel
Public Utilities Commission, proved these systems has inhibited the drawing with shade on the bottom row of cells
that our models accurately predicted of research conclusions. To avoid the functions at 66% of its rated output.
how much a ballast-only system would failures that would spur changes, we’re However, a module mounted in por-
move during an earthquake. This using analytical models to determine trait with shading on the bottom row
research then became the basis for the frequency of our systems, check- of cells stops producing power entirely.
guidelines published by the Structural ing against full-scale installed projects We thought it was important to con-
Engineers Association of California to ensure accuracy, and then running tinue to offer both solutions to serve
PV Committee, which in turn served those models against various wind the needs of customers with different
as the basis for the solar provisions in scenarios. The conclusion is always a project priorities.
the 2015 International Building Code direct correlation: more stiffness equals Given that most manufacturers are
(IBC). Because earlier versions of the a more robust system. However, adding moving to a portrait orientation, we
IBC required that all rooftop equipment stiffness adds cost. That’s unacceptable wanted to differentiate our portrait solu-
be fastened to the building, the solar from a project economics perspective, tion. For example, we can follow a grade
industry was hampered with a code- and a tough sell to customers when the of up to 20%, whether it is constant
compliance issue that was not intended requirements are not written in any or rolling terrain. That helps reduce
for PV. The 2015 IBC allows the use of structural code. Therefore, the most project cost because it eliminates some
a displacement-based seismic design recent approach we’ve taken is the abil- civil engineering work and site grading.
approach for ballasted nonpenetrat- ity to actively monitor a system in real Because of drought issues, site grad-
ing rooftop arrays, although ultimately time, using accelerometers to gauge ing is not permitted in some areas, and
local AHJs have control over the inter- how our systems are performing in the existing vegetation must be left in place.
pretation of the code. SunLink is con- field. When we match behavior to the Terrain-following systems can make the
tinuing to be a leader for this issue, and wind data we’re getting from the site, we difference between whether sites like
we are working today to bring greater can use machine learning to teach our these are developed or not.
clarity to the standards for ballasted systems to move out of the way of the
roof systems in high seismic zones. wind. In this way, we achieve multiple SP: There appears to be a significant
goals: We save cost by reducing metal; transformation under way at SunLink.
SP: Is the structural design of roof- and we ensure that our system can with- KT: We’re very proud of our racking
ground-mounted arrays relatively stan- stand any wind event without hitting and mounting legacy, and we believe
dardized at this point, or are new struc- resonance; and, by altering the tracker’s it’s that legacy that sets us apart as
tural design challenges still coming across angle slightly rather than going to stow, energy solutions providers. Making
your desk? we limit the extent to which our tracker projects successful from a holistic
KT: As an industry we’ve come a long is at a suboptimal tilt. perspective has always been our goal,
way, but we still have a lot to learn. Our whether through engineering and
R&D program is as active as ever. Right SP: SunLink recently introduced the project management, geotechnical and
now, for example, we’re working with Large-Scale GMS Portrait ground-mount installation services or, most recently,
our customers and thought leaders in system. What design advantages does a complete next-gen SCADA platform
the industry to continue to improve the portrait system offer? and O&M resources. Our focus is on
understanding of the implications of KT: The industry has been debating solving the energy industry’s big-
ground-mount racking systems’ stiff- whether portrait- or landscape- picture challenges, which are diverse.
ness and frequency, for both fixed tilt oriented modules are the best They include driving solar costs down
and trackers. approach in fixed-tilt ground-mount so renewable energy is more competi-
Structural engineers have long systems. We decided to exit that tive in more markets, and improving
thought about the dynamic response debate and provide both. Many of our grid stability and security for peace of
of bridges and skyscrapers, worrying competitors have abandoned land- mind when you turn the lights on. It’s
that resonance could (and has) caused scape for portrait because it’s inher- only once we’ve solved these issues
collapse of otherwise sound designs. ently lower cost, since it eliminates that the solar industry truly will be
But solar has never been deployed at a layer of structure. However, that able to dominate the energy mix.
58 S O L A R PR O | January/February 2016
The Magazine of Residential-Scale Renewable Energy—from the Publishers of SolarPro
Holiday Special
Subscribe or Renew to
Home Power & Receive a
FREE
homepower.com/holiday
Projects System Profiles
60 S O L A R PR O | January/February 2016
Equipment Specifications
MODULES: 888 Canadian Solar
CS6X-305P, 305 W STC, +5/-0 W, 8.41
Imp, 36.3 Vmp, 8.97 Isc, 44.8 Voc
INVERTERS: 3-phase, 277/480 Vac
service; nine Fronius Symo 24.0-3
480, 23,995 W rated output, 1,000 Vdc
maximum input, 500–800 Vdc MPPT
range, 200–1,000 Vdc operating range
ARRAY 1: 18 modules per source
circuit (5,490 W, 8.41 Imp, 653.4 Vmp,
8.97 Isc, 806.4 Voc), six source circuits
per inverter (32.94 kW, 50.46 Imp,
653.4 Vmp, 53.82 Isc, 806.4 Voc)
ARRAY 2: 18 modules per source
circuit (5,490 W, 8.41 Imp, 653.4 Vmp,
8.97 Isc, 806.4 Voc), five source cir-
cuits per inverter (27.45 kW, 42.05 Imp,
653.4 Vmp, 44.85 Isc, 806.4 Voc)
ARRAYS 3 & 4: 19 modules per
source circuit (5,795 W, 8.41 Imp,
and safety requirements for PV systems Aethercomm with a “Commercial PV 689.7 Vmp, 8.97 Isc, 851.2 Voc), five
on commercial buildings. System Users Guide,” including a com- source circuits per inverter (28.98
The project’s decentralized power plete structural and single-line plan set; kW, 42.05 Imp, 689.7 Vmp, 44.85 Isc,
conditioning systems include nine roof- system specifications; warranty informa- 851.2 Voc)
mounted 3-phase Fronius Symo string tion; system operation, monitoring and ARRAYS 5–9: 20 modules per source
inverters, each with its own disconnect O&M protocols; and emergency shut- circuit (6,100 W, 8.41 Imp, 726 Vmp,
at the inverter location. The installation down procedures. 8.97 Isc, 896 Voc), five source circuits
per inverter (30.5 kW, 42.05 Imp, 726
team located a master disconnect at “We are proud of the results of Aether-
Vmp, 44.85 Isc, 896 Voc)
ground level with the system’s switchgear comm’s commercial solar project. The
and point of interconnection with San installation is an example of how proper ARRAY INSTALLATION: Ballasted
roof mount, modified bitumen roofing,
Diego Gas & Electric. design, the right suppliers and experi-
SunLink Precision-Modular RMS rack-
RA Power & Light installed Fronius enced crews can deliver predictable out-
ing, 180° azimuth, 10° tilt
weather sensors that provide real-time comes for complicated projects. RA Power
SYSTEM MONITORING: Fronius
meteorological data, augmenting the & Light completed this 12-week project
inverter-integrated dataloggers,
system’s inverter-level performance opti- in 9 weeks—a testament to the experi-
environmental monitoring, Fronius
mization and monitoring. The sensors ence and safety awareness of our teams,
Solar.web online platform
upload data to a Fronius Solar online combined with the benefit of working with
platform that enables project stakehold- knowledgeable staff at local municipalities
ers to access revenue-grade produc- and fire departments.”
tion data and system status details. RA —Michael Campbell, CEO,
Power & Light provides clients such as RA Power & Light
solarprofessional.com | S O L A R P R O 61
Advertiser Index
Company Page Company Page
AEE Solar 2 Roof Tech 62
Array Technologies 7 Seaward Solar 1
Chint Power Systems IFC SMA America 37
Fronius 9 Solar Pathfinder 62
Ginlong Solis 3 SolarBOS 11
Home Power Subscription 59 SolarEdge 41
Intersolar N.A. 25 SolarPro Subscription IBC
Magnum Energy 15 Solmetric 17
MidNite Solar 53 Solar Power PV Conference & Expo 49
MREA 27 Standing Seam Roof Anchor 53
NABCEP CE Conference 55 Stiebel Eltron 45
Panasonic 23 Ten K Solar 19
Pegasus Solar 31 Trojan Battery 5
Phocos 16 Yaskawa-Solectria Solar BC
Quick Mount PV 13
www.roof-tech.us
62 S O L A R PR O | January/February 2016
Projects
Assured Solar Energy
Maine Beer Company
C ou r te sy A ssu re d S ola r E n e r gy
Overview
DESIGNER AND LEAD INSTALLER:
T he Maine Beer Company (MBC) is
an award-winning brewery located
in Freeport, Maine. MBC approached
traffic, and the system has become a
local landmark.
The rooftop array experiences
Rob Taisey, president, Assured Solar
Energy, assuredsolar.com Assured Solar Energy (ASE) in late 2014 intermittent shading from grain silos
DATE COMMISSIONED: June 2015
with the goal of producing as much adjacent to the building, so the project
renewable power as possible at its Beer team chose SolarEdge 3-phase 480 Vac
INSTALLATION TIME FRAME: 60 days
Barn facility. ASE determined that by inverters and optimizers for the entire
LOCATION: Freeport, ME, 43.8°N
fully utilizing the southwest-facing roof system. The installers connected mod-
SOLAR RESOURCE: 3.76 kWh/m2/day of the building and locating two AllEarth ules in pairs to P600 optimizers, provid-
ASHRAE DESIGN TEMPERATURES: Solar Trackers on the lawn next to the ing individual MPPT for every pair while
86°F 2% avg. high, -10°F extreme min. facility, MBC could offset approximately mitigating the effects of partial shading.
ARRAY CAPACITY: 55.12 kWdc half of its power consumption with Using 480 Vac inverters and a step-
ANNUAL AC PRODUCTION: on-site PV generation. down transformer allowed the project
69,500 kWh MBC is located on a heavily trav- to employ half the number of inverters
eled section of US Route 1, and MBC and double the string length compared
co-founder David Kleban wanted the to a 208 Vac 3-phase inverter system.
Do you have a recent PV system to pop visually. He selected poly- Site drainage needs dictated the
or solar heating project crystalline REC Peak Energy modules to steep and uneven slope of the lawn.
we should consider for match the blue MBC sign and wanted To accommodate the trackers’ precast
publication in SolarPro?
the trackers to be visible from the road. concrete foundations, which installers
Email details and photos to: Since installation, the MBC tasting had to bury to a depth of 6 feet, they ter-
projects@solarprofessional.com room has seen a noticeable increase in raced the lawn with a stone retaining wall.
solarprofessional.com | S O L A R P R O 63
Projects
Equipment Specifications
MODULES: 212 REC Peak Energy
Series REC260PE, 260 W STC, +5/-0 W,
8.50 Imp, 30.7 Vmp, 9.01 Isc, 37.8 Voc
INVERTERS: 3-phase, 208 Vac service;
64 S O L A R PR O | January/February 2016
Built to Last...
Starting with SolarPro’s September/October 2015 issue, we began
charging for US and international subscriptions to the print edition, as
well as access to our full digital issue archive. This change will offset
a portion of our growing printing and shipping costs and allow us to
continue to dedicate significant resources to developing the in-depth
technical content that makes SolarPro so valuable.
Stay Connected...
Subscribe Today
• All print subscriptions include complimentary access to SolarPro’s
digital edition
solarprofessional.com/subscribe
Phone 800.707.6585 or 541.512.0201 • Monday–Thursday, 8am–4pm Pacific
Questions? subscribe@solarprofessional.com • solarprofessional.com/faq
SIMPLIFYING SOLAR
11,500 Employees
www.solectria.com | inverters@solectria.com