You are on page 1of 1

MAIN PIPE 3/4" SEWAGE PIPE RWP Ø10

COLD WATER PIPE 1/2" GULLY WITH COVER


HOT WATER PIPE 1/2" GULLY
HOT WATER IN TAKE
COLD WATER IN TAKE MAINHALL
water heater
down from
water tank
ventalation pipe
up to water tank
RWP Ø10
SEPTEC TANK
RWP Ø10
FROM MAIN SORCE
SECCPOOL
‫ﻣﺨﻄﻂ اﻟﻤﺎﺋﯿــــــﺔ‬ ‫ﻣﺨﻄﻂ اﻟﻤﺠــﺎري‬
1/100 1/100
NOTES CONSULTANT WORK DRAWING DRAWING NO.
1. ALL DIMENSIONS ARE IN CENTIMETERS
3 XX/XX/007 X X X
(WORKING DRAWING) X X X X
2. 2 XX/XX/007 X X X ‫ﻣﺨﻄﻂ اﻻﻋﻤــﺎل اﻟﻤﺎﺋﯿــــــﺔ‬
PART WORK NO. ‫و ﻣﺨﻄﻂ اﻋﻤﺎل اﻟﻤﺠــﺎري‬
1 XX/XX/007 X X X
‫دار اﻟﺴــــﻜﻦ‬ 7 008
DATE DESCRIPTION DESIGN CHECK DESIGN CHECK OWNER LOCATION SCALE SHEET SIZE DATE
REVISION 1/100 A3

You might also like