You are on page 1of 1

1*D14 1899 1*D14

LF/9 L50*5
25

25
24 1851 24

No. 58, Marked LF/9

1583
24 1535 24

1*D14

LF/10 L50*5 1*D14


25

No. 60, Marked LF/10

1457
24 1409 24

1*D14

LF/11 L50*5 1*D14


25

No. 28, Marked LF/11

STRUCTURAL CONSULTANT Consultant :


ENGINEERING CONSULTING OFFICE

E C O Consultant Eng. Moustafa Hamed

2 EL Shahid . Fouad Abd EL Hakim EL Gammal- Nasr City - Egypt


TEL : (+202) 24043808 : E-mail : ecomoustafa@yahoo.com

Contractor : MAIN CONTRACTOR :

Phase Building Release Group Alpha job number : J1830 STRUMIS:


Tekla structures

Ph W 40 Project Name : WADI ELNEEL 1001


LF/10 L50*5 ST-37 60 1582.6 0.31 6.0 Job site location : MANSOURA 3
LF/11 L50*5 ST-37 28 1457.0 0.28 5.5
Drawing Name : BRACING REV. Dwg. NO.
LF/9 L50*5 ST-37 58 1898.7 0.37 7.2 1 0 6/1/2019 ISSUED FOR APPROVAL 3
Text Size Grade No. Length Area Weight No Revision mark Revision date DESCRIPTION 0