Professional Documents
Culture Documents
17 December 2010
Condition Manual
60156808
Prepared for
Fremantle Ports and Port of Melbourne Corporation
Prepared by
Maunsell Australia Pty Ltd
Level 9, 8 Exhibition Street, Melbourne VIC 3000, Australia
T +61 3 9653 1234 F +61 3 9654 7117 www.maunsell.com
ABN 20 093 846 925
17 December 2010
60156808
The information contained in this document produced by AECOM Australia Pty Ltd is solely for the use of the Client identified on
the cover sheet for the purpose for which it has been prepared and AECOM Australia Pty Ltd undertakes no duty to or accepts
any responsibility to any third party who may rely upon this document.
All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically
stored or transmitted in any form without the written permission of AECOM Australia Pty Ltd.
Condition Manual
C:\Condition Manual - RevC.docx
Quality Information
Document Condition Manual
Ref 60156808
Date 06/01/2011
Rev A (2007): Tahlia Griffin
Prepared by
Rev C (2010): Eamon Sullivan
Rev A (2007): Sandy Muir
Reviewed by
Rev C (2010): Gary Rykers
Revision History
Authorised
Revision
Revision Details
Date
Name/Position Signature
James Bandt
A 19/03/2007 Final Condition Manual Principal
Consultant
Condition Manual
C:\Condition Manual - RevC.docx
Table of Contents
1.0 Background 1
1.1 About this Manual 1
1.2 Condition Assessment Methodology 1
1.3 Use of Condition Rating 2
1.4 Description of Key Definitions 2
1.5 Relationship with Asset Management System 3
1.6 Asset Hierarchy 3
1.7 Condition Assessment Frequency 8
2.0 Buildings 9
2.1 Structural 9
2.2 Services 9
2.3 Sub-Structure 10
2.4 Fittings 10
3.0 Roads 11
3.1 Pavement 11
3.2 Furniture 12
3.3 Verges 12
3.4 Kerb and Channel 13
4.0 Sewerage 14
4.1 Pipes 14
4.2 Manholes 14
4.3 Pump Station Structure 14
4.4 Pump Station Mechanical and Electrical 15
5.0 Drainage 16
5.1 Pipes 16
5.2 Pits 16
5.3 Traps Structural 16
5.4 Traps Mechanical and Electrical 17
6.0 Water 18
6.1 Pipes 18
6.2 Water-main Fittings 18
7.0 Wharves/Jetties 19
7.1 Piles 20
7.2 Sub Structures 21
7.3 Deck 22
7.4 Furniture 23
7.5 Fenders 23
7.6 Cathodic Protection 23
8.0 Structures 24
8.1 Structural 24
8.2 Mechanical and Electrical 24
9.0 Navigational Structures 25
9.1 Lights / Day-marks 25
9.2 Supporting Structure 25
Condition Manual
C:\Condition Manual - RevC.docx
9.3 Piles 26
9.4 Footings 26
10.0 Telecommunications 27
10.1 Cables 27
10.2 Pits 27
11.0 Power 28
11.1 Street Lighting 28
11.2 HV Cabling 28
11.3 LV Cabling 28
11.4 Substations 29
11.5 Switchboards 29
Condition Manual
C:\Condition Manual - RevC.docx Page 4
1.0 Background
1.1 About this Manual
This Condition Manual (Manual) provides standard condition rating criteria for Fremantle Ports’ and
Port of Melbourne Corporation’s (PoMC) assets. These condition rating criteria have been developed
to facilitate consistency and repeatability when assessing a condition grading for assets / asset
components.
The first version of the Manual (Rev A) was completed in 2007 by Maunsell (now known as AECOM).
In 2010, the Manual was jointly reviewed by Fremantle Ports and PoMC. The 2010 update (Rev C)
addressed improvement opportunities common to all asset classes and involved an update of Section
1 (Background) only. A second stage update is proposed for 2011, to address further improvement
opportunities that are asset class specific and will involve update of all remaining sections.
The condition grading criteria have been developed through workshops with Fremantle Ports and
PoMC and are based around industry standards. It is intended that this document will be used by
Fremantle Ports and PoMC as a guide for conducting condition surveys of their major assets / asset
components.
The condition rating criteria provided are intended to cover all major asset groups and components.
The major asset groups are:
Buildings
Port Interface Structures (e.g. wharf, jetty, pier, landing)
Navigational Aids
Roads
Supplemental Structures (e.g. tower, gantry, gangway, other)
Services (e.g. sewerage, drainage, water, telecommunications, power, oil)
Railways
Cargo Handling Equipment (not included in the scope of this Manual)
The condition data collected is used to support core asset management activities such as, risk
management, predictive modelling, planned maintenance and rehabilitation, asset valuation, works
prioritisation and budget forecasting. The process of collecting consistent and repeatable condition
data forms a core part of the application of asset management, as defined in Figure 1.
Condition Manual
C:\Condition Manual - RevC.docx Page 1
DATA COLLECTION /
EXISTING DATA MEASURE PERFORMANCE
•Environmental •Customer
•Strategic LEVEL OF ASSET MANAGEMENT
•Financial
•Legislative SERVICE •Political PLAN
IDENTIFY OPTIMUM
CONDITION SOLUTION
ASSESSMENT
EVALUATE
TREATMENT OPTIONS
This Manual provides criteria to assess asset condition on a rating scale of 1 - 5 (excellent to very
poor), linked to standard definitions describing physical condition of the assets.
In providing a condition assessment methodology, it is essential that the assessments are reliable and
consistent so asset managers can be confident in the data.
Condition Manual
C:\Condition Manual - RevC.docx Page 2
Term Description of Key Definitions
Asset Hierarchy An infrastructure framework for segmenting an asset portfolio into
appropriate classifications. The asset hierarchy can be based on asset
function, asset type or a combination of the two.
Condition Rating Scale The standardised classification system used to identify the current condition
of an asset component (which forms part of a particular asset).
Inspection Frequency The inspection frequency defines how often a condition rating survey will be
conducted for each asset group (or potentially each asset category). The
inspection frequency can be different for each inspection type.
Inspection Type Level 1 – Routine inspection performed in accordance with a pre-prepared
checklist, typically conducted by a maintenance technical officer.
Level 2 – Periodic visual condition survey performed in accordance with a
consistent and repeatable process (this Manual), typically undertaken by an
engineer. Level 2 condition rating results are typically stored in an Asset
Management System and used to drive needs based forward programs.
Level 3 – Detailed engineering testing, analysis and assessment, likely to
involve specialised equipment and/or a high level of technical expertise.
Location Referencing A structured referencing system that identifies the position of individual
components or assets. The location referencing system may vary according
to the asset class. Condition rating survey outputs are recorded in
accordance with the adopted location referencing system. ‘Return to field’
activities rely on the location referencing system to re-locate defects
identified during the condition rating survey and to ensure repeated
inspections are recorded against the same component or asset.
Start Datum The start datum is an integral part of the location referencing system. The
start datum is a clearly defined location or reference point, used as the
starting point for subsequent location referencing measurements.
In general, the asset management system will categorise assets using a number of asset classes,
asset categories and asset components. For each asset category, a number of individual assets may
be listed.
Whilst asset hierarchies are often separated by asset class, the hierarchy can also take a spatial
approach whereby asset classes in the same location are grouped together (e.g. “Berth 1” could
contain not only the structural components but also supporting infrastructure such as electrical
services, water supply etc).
Condition Manual
C:\Condition Manual - RevC.docx Page 3
Although each port may structure their hierarchy differently within the asset management system, it is
important that the hierarchy be setup in such a way as to facilitate essential business functions such
as maintenance management, financial reporting and data management.
The table below outlines the specific asset classes, asset categories and asset components covered
by this Manual. Condition assessment will be consistently undertaken at the component level; with
condition assessment being undertaken only for asset components that are considered materially
significant. That is, asset components which have a material value (to be determined by each
organisation) relative to the total value of the asset should be subject to condition assessment.
It should be noted, however, that some asset components of low value may be critically important to
the ongoing serviceability of the asset as a whole. In this instance, the component should be included
in a condition assessment regime regardless of direct monetary value.
Condition Manual
C:\Condition Manual - RevC.docx Page 4
Asset Class Asset Category Asset Component Material Type Reference
Services 2.2
Substructure 2.3
Fittings 2.4
Appurtenance 7.4
Timber
Concrete
Steel
Revetment and scour
protection TBD Stage 2
Rock
Concrete
Sheet pile wall TBD Stage 2
Concrete
Steel
Beams and cross heads 7.2
Timber
Concrete
Steel
Navigational Aids
Beacon (water-based)
Condition Manual
C:\Condition Manual - RevC.docx Page 5
Asset Class Asset Category Asset Component Material Type Reference
Navigation light / day mark 9.1
Structure 9.2
Pile 9.3
Footings 9.4
Buoy (water-based)
Navigation light / day mark 9.1
Buoy TBD Stage 2
Directional wave rider TBD Stage 2
Coastal monitoring device
AWAC TBD Stage 2
Tower (land-based)
Navigation light / day mark 9.1
Structure 9.2
Footings 9.4
Lighthouse (land-
based)
Navigation light 9.1
Structure 9.2
Equipment TBD Stage 2
Footings 9.4
Roads
Pavement
Public road 3.1
Asphalt
Concrete
Granular with
Sprayed Seal
Unsealed
Stacking area 3.1
Asphalt
Concrete
Granular with
Sprayed Seal
Unsealed
Parking area 3.1
Asphalt
Concrete
Granular with
Sprayed Seal
Unsealed
Minor drainage Kerb and channel 3.4
Path Footpath / Bike path TBD Stage 2
Environment Medians 3.3
Shoulders 3.3
Verge 3.3
Linemarking 3.3
Furniture
Signs 3.2
Light poles 3.2
Bollards 3.2
Barriers 3.2
Guardrails 3.2
As per VicRoads Bridge
Condition Inspection
Manual – Level 2
Bridge Inspections Not In Scope
Supplemental Structures
Land-based structure
Condition Manual
C:\Condition Manual - RevC.docx Page 6
Asset Class Asset Category Asset Component Material Type Reference
(e.g. tower, gantry,
gangway)
Structure 8.1
Mechanical and electrical 8.2
Seawall
Structure TBD Stage 2
Services
Sewerage
Gravity main 4.1
Rising main 4.1
Manhole 4.2
Pump station - structure 4.3
Pump station - mechanical
/ electrical 4.4
Drainage
Pipe 5.1
Pit 5.2
Trap 5.3
Water
Pipe 6.1
Pump station - structure 4.3
Pump station - mechanical
/ electrical 4.4
Valve 6.2
Hydrant 6.2
Telecommunications
Cables 10.1
Pits 10.2
Poles TBD Stage 2
Power
Street lighting 11.1
HV Cabling 11.2
LV Cabling 11.3
Substations 11.4
Switchboards 11.5
Oil
Equipment TBD Stage 2
Railways
Railway
Track TBD Stage 2
Sleepers TBD Stage 2
Ballast TBD Stage 2
Signalling equipment TBD Stage 2
Condition Manual
C:\Condition Manual - RevC.docx Page 7
Asset Class Asset Category Asset Component Material Type Reference
Receival hopper Not in scope
Unloading hopper Not in scope
Loading chutes Not in scope
Crane rail Not in scope
Crane rail beam Not in scope
These objectives can best be met where there is a defined frequency of condition data survey, for
each asset class. As a supporting document to this Manual, it is proposed that a separate guideline be
developed to define the recommended survey types and frequency for each asset class. The guideline
will undergo detailed review by Australian port authorities to ensure that appropriate practices are
adopted and to optimise the return on investment with respect to condition assessment.
Condition Manual
C:\Condition Manual - RevC.docx Page 8
2.0 Buildings
2.1 Structural
This component includes roof, walls and flooring.
2.2 Services
This component includes mechanical, electrical and plumbing services.
Condition Manual
C:\Condition Manual - RevC.docx Page 9
2.3 Sub-Structure
This component includes floor slabs and footings and any part of the structure ground level and below.
2.4 Fittings
This component includes all interior fittings and furnishings.
Condition Manual
C:\Condition Manual - RevC.docx Page 10
3.0 Roads
3.1 Pavement
Rating
Longitudinal / No visible signs of Maximum crack Maximum crack Maximum crack Maximum crack width
Transverse cracking width < 5 mm width 6 - 10 mm width 11 - 15 mm > 15 mm
Cracking
Crack Pattern Crack Pattern Crack Pattern
No visible signs of Crack Pattern < 4%
Pattern 5 - 10% of 11 - 25% of > 25% of pavement
cracking of pavement area
pavement area pavement area area
No visible signs of < 3 potholes 3 potholes 3 - 5 potholes > 5 potholes
Disintegration Potholes pavement
disintegration every 100 m every 100 m every 100 m every 100 m
No visible signs of
Distortion Rutting, Heaving pavement < 20 mm deep 20 – 30 mm deep 31 - 50 mm deep > 50 mm deep
distortion
No visible signs of
Edge Breaks Edge breaks < 50 mm deep 51 – 100 mm deep 101 - 200 mm deep > 200 mm deep
edge breaking
Material Loss, Texture loss Texture loss Texture loss Texture loss extends
Surface Texture No visible signs of
Scabbling, extends up to 5% of extends 6 – 10 % of extends 10 - 20% of > 20% of pavement
Loss texture loss
Peeling pavement area pavement area pavement area area
Pavement shows Pavement shows
Pavement shows Appearance of the
Pavement looks in some signs of numerous signs of
Appearance signs of significant road is unpalatable to
‘as new’ condition patching on road patching on road
patching the community
surface surface
Condition Manual
C:\Condition Manual - RevC.docx Page 11
3.2 Furniture
This component includes signs, light poles, bollards, barriers and guard rails.
3.3 Verges
This component includes nature strips, grassed areas trees and footpaths.
Condition Manual
C:\Condition Manual - RevC.docx Page 12
3.4 Kerb and Channel
Rating
Distress Mode 1 2 3 4 5
Joint Extensive joint
Joint
Longitudinal Some joint Displacement displacement
Displacement
Profile No visible signs of displacement between 20 - 40% (>40%) of length
< 20% of length of
(Vertical joint joint displacement over < 10% of of length of kerb of kerb and
kerb and channel
displacement, and ponding length of kerb and and channel channel segment
segment
sagging, ponding) channel segment segment resulting in many
individual failures
Condition Manual
C:\Condition Manual - RevC.docx Page 13
4.0 Sewerage
4.1 Pipes
Asset Life: 80 years
4.2 Manholes
Condition Manual
C:\Condition Manual - RevC.docx Page 14
4.4 Pump Station Mechanical and Electrical
Condition Manual
C:\Condition Manual - RevC.docx Page 15
5.0 Drainage
5.1 Pipes
Asset Life: 80 years
5.2 Pits
This component includes outfalls and end walls.
Condition Manual
C:\Condition Manual - RevC.docx Page 16
5.4 Traps Mechanical and Electrical
Condition Manual
C:\Condition Manual - RevC.docx Page 17
6.0 Water
6.1 Pipes
Condition Manual
C:\Condition Manual - RevC.docx Page 18
7.0 Wharves/Jetties
Introduction
Given the number of asset items and sub items it is envisaged that a sample area of each wharf will
be selected for assessment. The assessment criteria will take into consideration two factors being the
severity of the defect and the extent of the defect (area affected). When assessed the asset will be
assigned a percentage against each of the ratings of 1 – 5, an example output is given below:
The table displays the results of a sample assessment of a deck. In this example the results identify
that 10% of the decking has been rated as a condition 1, 30% as a condition 2 etc. It is intended that
this information be mapped onto the table below to identify the works required. The colours below
indicate the type of work to be undertaken when the condition and percentage area affected coincide
with a colour. For example a condition 3 with a percentage area affected of 31-40% would require
further investigation. However should a condition 5 with a percentage area affected of 11-20% also
occur on the same asset, then the replacement would be required and this would take precedent over
the investigative work.
% Area Affected
Condition 0 - 10 11 - 20 21 - 30 31 - 40 > 40
1
2
3
4
5
Example of outcomes:
Repair
Detailed Replace
No Works Required Reinspect within 5
Investigation Immediately
years
This table is a sample only, the ratings and actions are suggestions and they will need to be
formulated following a non detailed assessment of the Levels of Service and Business Risk associated
with the wharf structures.
Condition Manual
C:\Condition Manual - RevC.docx Page 19
7.1 Piles
Asset Life: 50 years
Rating Definition % Estimated Steel Timber Concrete (Steel Cased)
Remaining Life
1 Excellent 61 - 100 As new. As new. As new, some minor surface corrosion present.
2 Good 31 - 60 Acceptable physical condition. Minor Acceptable physical condition. Minor wear and Acceptable physical condition. Minor wear and tear. General
wear and tear. Slight rusting tear. Little or no rot or decay, though there may corrosion and loss of paint above water. No work required.
(corrosion), loss of paint above water. be minor cracks, splits or checks having no
No work required. affect on the strength of the component. No
works required.
3 Average 21 - 30 Some heavy corrosion present with Minor signs of rot or decay. Moderate necking Some heavy corrosion present. Estimated remaining life 10-
rust scale build-up. Estimated evident, 350mm diameter remaining, cracking 15 yrs however conduct a more detailed assessment to
remaining life 10-15 yrs however extends beyond connections and splitting is define this more accurately.
conduct a more detailed assessment to <10mm wide.
define this more accurately.
4 Poor 11 - 20 Deterioration evident. Heavy corrosion Deterioration evident. Extensive decay, checking Significant deterioration evident in the form of corrosion
above and / or below water. Failure or splitting (<20mm wide). Heavy necking, related holing of steel casing and exposure of concrete
unlikely in the near future but further 300mm of diameter remaining along with heavy above and / or below water Failure unlikely in the near
deterioration likely. Remedial work cracking that extends along the member. Failure future but further deterioration likely. Remedial work
likely to be required in the next 5 yrs unlikely in the near future but further required in next 5 years, could include – patch repairs and /
could include - replacing anode below deterioration likely. Remedial work required in or the need for cathodic protection or in the case of existing
water or wrapping pile above water. next 5 years. cathodic protection, a check to see if it is still functioning,
replacing anode below water or wrapping pile above water.
5 Very Poor 0 - 10 Failure likely in the next 3 years. Asset failed or failure imminent. Asset represents Asset failed or failure imminent. Asset represents a risk.
Significant loss of steel section through a risk. Major work or replacement required Major work or replacement required urgently or Failure likely
corrosion either surface or pitting. urgently or Significant necking of piles down to in the next 3 years. Significant holes in steel section to an
Fatigue failure of steel or welds. 200mm diameter. They may also have large extent that the concrete is exposed and showing signs of
Substantial work required short term or splits, especially under load bearing areas, deterioration. Substantial work required short term.
Asset failed or failure imminent. Asset heavy decay or checks which may have a
represents a risk. Major work or reduction in strength of the member. Substantial
replacement required urgently. work required in very short term.
Condition Manual
C:\Condition Manual - RevC.docx Page 20
7.2 Sub Structures
This component includes beams and crossheads.
Condition Manual
C:\Condition Manual - RevC.docx Page 21
7.3 Deck
Asset Life: 50 years
Condition Manual
C:\Condition Manual - RevC.docx Page 22
7.4 Furniture
This component includes bollards, ladders and the like.
7.5 Fenders
Condition Manual
C:\Condition Manual - RevC.docx Page 23
8.0 Structures
8.1 Structural
The Structures asset group includes gantry, gangways and towers. The structural component includes
a focus on steel, capturing lattice towers, bolts, coatings and the like.
Condition Manual
C:\Condition Manual - RevC.docx Page 24
9.0 Navigational Structures
9.1 Lights / Day-marks
Condition Manual
C:\Condition Manual - RevC.docx Page 25
9.3 Piles
9.4 Footings
Condition Manual
C:\Condition Manual - RevC.docx Page 26
10.0 Telecommunications
10.1 Cables
This component includes conduits.
10.2 Pits
Condition Manual
C:\Condition Manual - RevC.docx Page 27
11.0 Power
11.1 Street Lighting
This component includes steel poles and wiring, footing corrosion, cabling wear and tear and stability.
11.2 HV Cabling
This component includes power poles.
11.3 LV Cabling
Condition Manual
C:\Condition Manual - RevC.docx Page 28
11.4 Substations
PoMC to Supply
11.5 Switchboards
PoMC to Supply
Condition Manual
C:\Condition Manual - RevC.docx Page 29