Project Name Upgrading of the sewage Network at KKIA Consultant WPS
WSP Comments AWPT Rectifications
Attached puddle flange details for both
1. Bespoke made D.I pipes with puddle Flanges have not yet been defined. PS1 and PS2 for the wall between the wet well and the valve room (Header Room) Not required as the HDPE pipes will be Stepped adapter for VC to HDPE pipe diameter transitions would need to be submitted in going through the walls of the chambers 2. a separate MAR if reqiured. as per the meeting held between WSP and AWPT.