You are on page 1of 3

TAHALOF ENGINEERING CO.

ELECTRICAL

Contract Quantity
Item Description
Qty. Unit Unit rate Amount (SR)

1 DIESEL GENERATOR SET


Supply and installation of an emergency power generator(750KVA,(13.8/.4) KV ), including the
generator control panel, in addition to circuit breakers, grounding, bases, supporting materials,
control devices, daily fuel tanks, diesel and all necessary equipment, supplies and related works 1

PANELBOARDS

Supply and install the following main distribution boards and submain distribution board
with all busbar, circuit breakers, meters, surge arresters, electrical and mechanical
2
interlock, billing metters and ancillary equipment complete all as described and as shown
on schematics.
2-A Panelboard (MDP-AC )-400 amps, 36 lines 1
2-B Panelboard (MDP-TRAINING BUILDING )-125 amps, 42 lines 1
2-C Panelboard (DP-WORK SHOP SHEL TER )-250 amps, 36 lines 1
2-D BATTERY FOR COMMUNICATION TOWER 1
3 In linear meter, supply, installation, testing and operation of the main cables,
including drilling, backfilling, racks, as well as racks for racks if necessary,
and all accessories necessary to finish the work according to the terms and
specifications.

3-A (4c 300mm² CU/XLPE/PVC )+(150mm2 CU ECC) FOR (MDB-AC ) 175 M


3-B (4c 50mm² CU/XLPE/PVC )+(25mm2 CU ECC) FOR TRAINING BUILDING 175 M
3-C (4c 50mm² CU/XLPE/PVC )+(25mm2 CU ECC) FOR FIR WATER PUMP 70 M
3-D (4c 120mm² CU/XLPE/PVC )+(70mm2 CU ECC) FOR WORK SHOP SHEL TER 65 M
3-E (4c 16mm² CU/XLPE/PVC )+(16mm2 CU ECC) for ( STREET LIGHT ) 600 M
3-F ( 3C 10 mm² CU/PVC ) FOR Air conditioner machine 550 M
3-G 200 mm Gl. S CABLE TRAY 45 M

lighting outlets:
Supply and installation of a lighting outlet on the ceiling or on the wall in the streets, and the connection
boxes, installation tools and related pipes, boxes, sockets and tests on the item, as well as the connection
4 from the outlet to the outlet with copper wires, a section of 3 x 4 mm2, as well as the connection to the 159 NO
distribution panels and all that is needed to complete the work in the best way

lighting units:
Supplying and installing LED lighting units, including communication boxes,
5 installation tools, pipes, boxes, wires, tests, and all that is needed to complete the
work properly.
5-A LED lighting units of 60X60, 30 watts, voltage 220, frequency 60 Hz, and the connection
boxes, installation tools, and related pipes, boxes, wires, tests and all that is needed to 133 NO
complete the work are loaded on the item.
5-B A circular sounding unit 20 watt LED spot lite for ladders and bathrooms of the type that
is resistant to dust and water vapor. The item includes installation, pipes, wires, control
16 NO
switches and other things that are needed to operate according to technical principles and
specifications
5-C Exit sign unit illuminated by a fluorescent lamp 8 watts, voltage 230, frequency 60 Hz,
degree of protection (54), supplied with a battery for 3 hours 6 NO

5-D LED spotlight 100 watt suspended in the ceiling and fixed with a chain FOR (WORK
60 NO
SHOP SHELTER)
5-E STREET LIGHT, 1x100W LED, 230V, 60H ,LUMINAIRE MOUNTED ON 10M
HEIGHT, 1M,LONG SINGLE ARM BRACKET WITH 15 DEG,ANGLE FROM 9 NO
HORIZONTAL STREET LIGHTING,POLE. CAT. #BGP323 OR APPROVED EQUAL
Fluorescent lamp unit 2*36 watts, 230V, 60Hz, protection degree (54) FOR
ELECTRICAL SWITH YARD 25 NO

5-D Emergency lighting unit of 2 * 20 watts equipped with a battery 6 NO

5-E A lighting unit installed externally to the exit doors. The item includes installation of pipes, wires,
control switches, connection boxes and other things that are required for operation according to 4 NO
technical principles and specifications.

DATE : Nov 20,2020 Page 1 01-Bill General Notes


TAHALOF ENGINEERING CO.

ELECTRICAL

Contract Quantity
Item Description
Qty. Unit Unit rate Amount (SR)
6 light switches
6-A Switch one-way one gang, 15A, 220V 28 NO
6-B Switch one-way two gang, 15A, 220V 1 NO
6-C Switch two-way two gang, 15A, 220V 4 NO
6-D Switch three-way two gang, 15A, 220V 1 NO

Braes and forces outlets


The supply and installation of the outlet outlets, including the outlet and all accessories
from the chassis, the outer face, etc., and the necessary pipes, boxes, sockets, the sub-
7 circuit from the outlet to the other and the general circuit up to the distribution panels
(3×4) mm2 copper, as well as installation tools, tests, etc., and all that is needed To
complete the work to the fullest extent according to the drawings and specifications

7-A Single receptacle 16A, 220V, 2P grd. 22 NO


7-B Duplex receptacle 16A, 220V, 2P grd 33 NO
7-C Powerful dual output socket 20 amps - 250 volts 5 NO
7-D SINGLE SOCKET OUTLET, 13A, 220V, WITH RESIDUAL CURRENT DEVICE 2 NO
FLOOR BOX ( 1 NO. DUPLEX POWER OUTLET+1 NO. DATA OULET + 1 NO. IP
7-E TELEPHONE OUTLET ) 23 NO

THREE PHASE SINGLE SOCKET OUTLET 20A, 380V, GROUNDING TYPE FOR
7-F (WORK SHOP SHELTER). 12 NO

DISCONNECT SWITCHES
8 Supply, installation and testing of disconnect switches and the item includes all
accessories and other things, and the necessary pipes, boxes and sockets, as well as
installation tools, tests, etc., are loaded on the item, as well as installation tools, tests, etc.,
and all that is needed to complete the work properly.

Supply and installation of a disconnect switch for air conditioning units with a capacity
8-A (32 amp-250 volts) to be installed next to the air conditioner 25 NO

Supply and installation of a disconnect switch for heater units with a capacity of (26 amps -
8-B 1 NO
250 volts)
Disconnect Switch for (WORK SHOP SHELTER) 40 A (3-ph) 2 NO
Disconnect Switch for (WORK SHOP SHELTER) 50 A (3-ph) 2 NO
Disconnect Switch for (WORK SHOP SHELTER) 63 A (3-ph) 2 NO
9 Grounding System
Supply and installation of a ground system consisting of several grounding points. Each
grounding point is a copper rod and copper conductors, and all necessary pipes, copper
wires, earth rods, connection to electrical distribution panels, metal parts, excavation,
backfilling, manholes and testing rooms, according to industry principles and
specifications.

9-A 70 MM2 GREEN/YELLOW COPPER CONDUCTOR 300 M

TEST BIT WITH 16MMᴓX2400MM LONG.COPPER CLAD, GROUNDROD including


9-B 10
chemical material to reduce ohm resistance
9-C 16 MMᴓ X 2400 MM LONG.COPPER CLAD, GROUNDROD 4
THERMIT WELD GROUNDROD CONNECTION including chemical material to reduce
9-D 14
ohm resistance

10 Supply, installation, testing and commissioning of a fire detection and alarm system
consisting of a smart addressable alarm system, sound emitting devices, detectors, control
devices, bells and intake stations, modules including cables and related wires, connecting
pipes, connection and overlap works

Supplying and installing a smoke detector of the addressable type, with high sensitivity to smoke, and the
10-A sensitivity of which can be controlled, and all necessary for installation, delivery, tests, etc., shall be 21
loaded on the item.

DATE : Nov 20,2020 Page 2 01-Bill General Notes


TAHALOF ENGINEERING CO.

ELECTRICAL

Contract Quantity
Item Description
Qty. Unit Unit rate Amount (SR)

upply and installation of a thermal detector of the addressable type, with high sensitivity to heat, and its
10-B sensitivity can be controlled, and all necessary for installation, connection, tests, etc., shall be loaded on 1
the item.

Supply and installation of a glass breaker unit of the same quality as the reagents, and all necessary for
10-C 6
installation, connection, tests, etc. are loaded on the item.

Supply and installation of a fire alarm bell and attached to the item all that is necessary for installation,
10-D 6
connection, tests, etc.

communication system

UTP PATCH PANE 1

WIFI 6

10
8 To Collection SR.. -