You are on page 1of 3

CONTINUED FROM PAGE 7 the water distribution system as well as the

sanitary and storm sewer systems.


detection programs are not necessary in the
sectors where the water distribution lines are A majority of North American cities are recog-
constructed with PVC pipes. “This fact allows nizing the efficiency and high reliability of PVC
us to concentrate our limited resources pipes by authorizing their use for infrastructure
where they are most needed, in the sectors construction. The Burroughs of Sainte-Foy
built with iron pipe,” states Mr. Perreault, Sillery decision makers have gone one step fur-
who points out that flushing is also a thing of ther in recognizing the superior performance
the past for the PVC sectors. of the PVC material by specifying its sole use in
order to promote sustainable development.
To this day, the Technical Services officials for
the West Infrastructures Division of Quebec In addition to the citizens living in the bur-
City, which includes the Burroughs of Sainte- roughs, all Quebec City citizens are benefit-
Foy-Sillery and Laurentien, are specifying PVC ing from the superior performance of PVC Mr. Perreault (right) was one of the decision makers who
pipes for constructing and rehabilitating its water pipes; their use allows the city engi- laid the groundwork for lasting infrastructure by using
PVC for the Burrough of Sainte-Foy. Mr. Desrosiers (left) is
water distribution system. While Mr. Proulx is neers to devote their efforts to the sectors
a part of the current team that continues the legacy of
lasting infrastructure by using PVC for Quebec City’s
“THIS FACT ALLOWS US TO CONCENTRATE OUR LIMITED
RESOURCES WHERE THEY ARE MOST NEEDED, IN THE SECTORS cities are struggling to breach the infrastruc-
ture gap, which is caused mainly by corro-
BUILT WITH IRON PIPE” sion, there are solutions available that will
allow the building of reliable infrastructure
now enjoying a well-deserved retirement, Mr. where conventional materials are currently within a sustainable development concept.
Perreault is supported by a new technical failing due to corrosion, knowing that the The professionals of the Sainte-Foy-Sillery
team, which includes Mr. Donald Desrosiers, P. PVC sectors will continue to offer their supe- Laurentien Burroughs of Quebec City have
Eng. Mr. Desrosiers also recognizes the sever- rior level of performance. shown it is possible. Follow their lead and
al qualities of PVC pipes that make it a reliable you will soon be writing one of the most
investment for underground infrastructure for At this juncture where all North American durable chapters of your own city’s history.

PVC Pressure Pipe


Endures Over
Ten Million
Cycles
Figure 1:
Test Apparatus for cyclic testing. The blue pipe is AWWA
C900, DR18, from Phase I. The white pipe is ASTM D2241,
SDR41, introduced in Phase II

By Craig Fisher, P.E. over 10 million cycles without which has a Pressure Class of 150 the AWWA C900 specimens fail-
Technical Director any failures. Ten Million! That psi, between 185 psi and 235 psi ing. The pump and the pressure
is a one with seven zeros after for exactly 10,209,535 cycles. At relief valve did not fare as well.

N
o, it is not a typographi- it: 10,000,000! 18 cycles per minute, it took a During the testing, USU failed six
cal error. Ten specimens total of 394 days and two research pumps and five relief valves in
of six-inch, DR 18, The researchers at Utah State phases to finish the testing. The order to log ten million cycles on
AWWA C900 pipe endured University (USU) cycled the DR 18, test was stopped without any of
CONTINUED ON PAGE 10

P V C P I P E N E W S • S P R I N G 2 0 0 4 9
TABLE 1. TEST PRESSURES AND STRESSES

Test Specimen Description Minimum Pressure Maximum Pressure Mean Stress Stress Amplitude
(psi) (psi) (psi) (psi)

One DR 18, AWWA C900, PC 150 psi 185 235 1787 213

Two SDR 41, ASTM D2241, PR 100 psi 82 123 2000 400

Three SDR 41, ASTM D2241, PR 100 psi 0 154 1500 1500

Four SDR 41, ASTM D2241, PR 100 psi 56.5 149 2000 900

CONTINUED FROM PAGE 9 Uni-Bell first contracted with edition of The Handbook of PVC lished his finding in February of
the PVC pipe. The test set-up is USU in 1999 to re-evaluate the Pipe: Design and Construction 2001. That testing showed that
shown in Figure 1 on page 9. The cyclic capabilities of PVC pres- shows Vinson’s theory.) The the cyclic life of PVC was a func-
blue pipe is the AWWA C900 sure pipe. At the time, there Europeans had a competing the- tion of two variables - not one.
pipe, and the white pipe is six- were two competing theories. ory that stated the cyclic life was PVC pipe fatigue is a function of
inch, SDR 41, ASTM D2241 pipe. both the mean stress and the
stress amplitude. (The fourth
This testing was a part of Phase II DURING THE TESTING, edition of the Handbook, pub-
of USU’s research project on the lished in August of 2001, shows
cyclic capabilities of PVC pres-
UTAH STATE UNIVERSITY FAILED SIX PUMPS
Moser’s 2001 theory.)
sure pipe. In the Spring 2001 AND FIVE RELIEF VALVES IN ORDER TO LOG TEN
edition of the PVC News, we Phase I
reported on the research results MILLION CYCLES ON THE PVC PIPE .
The first phase involved only
from Phase I and said that more
AWWA C900 pipe. As mentioned
data points would be collected.
earlier, this pipe was cycled from
Well the data is in, and the The first theory was developed a function of only the stress
185 psi to 235 psi, which resulted
results are impressive. by Vinson and stated that the amplitude. Dr. Moser complet-
in an average stress of 1,787 psi
cyclic life of PVC was a function ed the first phase of the testing
Background and a stress amplitude of 213 psi.
of peak stress only. (The third in the summer of 2000 and pub-
Vinson’s formula predicted failure
at 322,000 cycles. After success-
fully logging 3.5 million cycles, the
Stress Amplitude (psi)
first phase of testing was conclud-
ed and a new cyclic theory for
PVC was published. However, Dr.
Moser stated that more data
points were needed in order to
fine-tune the design chart that he
developed.

Phase II

So in April of 2001, Uni-Bell


entered its second contract on
this project with USU in order to
continue the work begun in
Phase I. This time, ASTM D2241
PVC pipe would be subjected to
pressures and amplitudes well
beyond that recommended in
the design standards. Also, the
testing on the AWWA C900 pipe
would be re-started.

SDR 41, ASTM D2241 pipe, with a


Number of Cycles Pressure Rating of 100 psi, was
selected for the abusive cyclic
Figure 3: New cyclic design chart updated after collecting extra data points from the second phase of testing.
CONTINUED ON PAGE 19

1 0 P V C P I P E N E W S • S P R I N G 2 0 0 4
The How-To
Handbook of PVC Pipe
522 PAGES

The only complete reference


for those who plan, design,
install and operate PVC sys-
tems for municipal water
mains, sanitary sewer and
storm water drainage systems.
If you are planning, or now
operate a PVC pressure or
non-pressure system, this
handbook is a must!

O N L Y $ 4 0 P E R C O P Y
(Includes postage and handling for US and Canadian orders.)
Figure 2: The cyclic pressures applied during testing followed a sawtooth pattern. Payable in US Funds, Texas Residents add 8.25 percent sales tax.

Plus air mail charges:


CONTINUED FROM PAGE 10
❑ Mexico $16/bk ❑ All Other Countries $28/bk
pressure combinations. Using pipe with a higher dimension
Mail coupon with your check to:
ratio allowed higher stresses to be generated in the pipe wall
at lower pressures. Generating the same stresses in DR 18 Uni-Bell PVC Pipe Association
would require a prohibitively expensive pumping system. 2655 Villa Creek Drive, Suite 155
Also, the researchers learned in Phase I to expect equipment Dallas, Texas 75234
failures. The extreme pressures take their toll on the equip- Indicate preferred format:
ment, and so, replacement pumps were a large part of the
❑ Hard-Bound ❑ CD-ROM
equipment cost in the research budget.
PC Requirements for Electronic Version:
Table 1 on page 10 shows the average pressure and
amplitude for the four pressure combinations. The corre- • I386, I486, Pentium or Pentium Pro processor-based personal
sponding wall stresses are also listed. computer
• Microsoft Windows 95 or Windows NT 3.51 or later
The pattern of cyclic pressure applied was a sawtooth. • 8 MB of RAM (16 MB for Windows NT) available to Acrobat
Reader
The computer screen in Figure 2 (above) displays the • 10 MB of available hard disk space
pressure wave applied. The minimum and maximum pres- • CD-ROM drive
sures on Test One were regulated to within +/- 5 psi. A
more accurate control system was used on Test Two, Macintosh Requirements for Electronic Version:
Three, and Four. Pressures were regulated to within +/- 3 • 68020 or greater processor or Power Macintosh
psi. Temperature was 22°C +/- 2 (71.6°F +/- 3.6). • 3.5 MB of RAM (5 MB for Power Macintosh) available to
Acrobat Reader
Cyclic Design Graph • Apple system software version 7.0 or later
• CD-ROM drive
With the help of the new data points, a fine-tuned design
graph is now available. It appears in Figure 3 on page 10. Name ____________________________________________________
Company __________________________________________________
The chart is a wonderful design tool for engineers Address __________________________________________________
involved in turf irrigation or sewer force main design. City ______________________________________________________
Those types of systems sometimes see surges of greater State/Province ______________________________________________
magnitude with greater frequency. We plan a follow-up Zip/Postal Code ____________________________________________
article that provides a cyclic design example for a force Country____________________________________________________
main system.
Phone: ____________________________________________________
Fax: ______________________________________________________
E-mail: ____________________________________________________

P V C P I P E N E W S • S P R I N G 2 0 0 4
L------------------------J 1 9

You might also like