You are on page 1of 4

Pressure Vessel Certification

The Pressure Vessel Certification article provides you with information


about the ASME stamp holder process for manufacturers and third
party inspection companies.

Do you what the pressure vessel certification process is? Do you know
how pressure vessel manufacturers can be ASME stamp holders?

How Third Party inspection companies can be certified by ASME and be


Authorized Inspection Agencies? What is a “U” stamped pressure
vessel?

Pressure Vessel Manufacturer Certification:

You may know pressure vessel manufacturer certification is the same


as authorization for an ASME Stamp.

The pressure vessel manufacturers can implement an ASME Quality


Control System and then apply for the ASME Stamp.

This means that if a manufacturer is accredited by the ASME


organization for pressure vessels per ASME Code Section VIII Div. 1,
they can stamp the letter “U” in the pressure vessel nameplate.

See the following Fig. for Pressure Vessel Certification (The Stamp
Item)
This is the process for ASME stamp accreditation:

1. Obtain Application Forms from ASME

2. Sign a Service Agreement with an Authorized Inspection Agency


(AIA)

Authorized inspection agencies are third party inspection companies,


which have accredited by an ASME organization and their inspectors
are certified by the National Board Inspection Code (NBIC).

These inspectors are named authorized inspectors and hold


commission cards issued by NBIC organization.

Summary: AIAs are accredited by ASME, but these inspectors are


certified by NBIC.

3. Submit Application Forms to ASME and transfer Fees

4. Purchase ASME Code Books

5. Describe a QC-System according to the ASME code quality control


manual and have the procedures prepared by the manufacturer.

6. Prepare a Demonstration Item

A representative demo pressure vessel needs to be constructed and all


drawings, calculations, part lists, purchase orders, material test
reports, fabrications, inspections, tests and reporting shall be based on
ASME code section VIII requirements.

7. Qualify Procedures and Personnel

Quality control procedures and personnel also need to be approved by


the manufacturer.

8. Pre-Joint Review by the Supervisor of AIA

It takes almost 4 months to fulfill the above requirements. Then an


audit needs to be conducted by a supervisor authorized inspector,
which is designated by an authorized inspection agency, which is
under contract with the manufacture.
This auditor would report non-conformities found in the audit process,
and then the manufacturer would have some time to correct them.

9. Joint Review (Audit) with ASME Designee, Inspector and Supervisor

Finally, the audit would be conducted by an ASME designated person,


supervisor authorized Inspector and authorized inspector.

That is the reason this audit is named a joint review.

10. Issuance of Certificate and Stamp by ASME

If the result of Audit was satisfactory, the certificate would be issued


by ASME and then manufacture would be authorized to stamp name
plate with “U” Stamp.

What are the Different Pressure Vessel Stamps?

Manufacturing of Pressure Vessels (Shop and /or Field): U

Alternative Rules Section VIII, Division 2(Shop and /or Field):U2

Manufacturing of High Pressure Vessels (Shop and /or Field):U3

What is the Quality Control System that Needs to be


Implemented in Pressure Vessel Certification?

For U the stamp, the quality control system needs to be based on


ASME section VIII Div. 1 Appendix 10.

What is the Benefit for a Pressure Vessel Purchaser to Order a


Stamped Pressure Vessel?

When a purchaser orders stamped pressure vessel from a stamp


holder manufacturer, it is not necessary to hire a third party inspector.

Because this pressure vessel would automatically be inspected by an


AI(Authorized Inspector) and its data report would be signed by him.

Another benefit can be the purchaser's assurance of the quality of the


pressure vessel, because of the manufacturers responsibility to the
ASME organization.
At the same time, ordering a stamped pressure vessel would be more
expensive than a non-stamped pressure vessel.