SKAU 4112
PENGATURAN KONTRAK DAN TAKSIRAN
– Duration of use 5 yr
– Diesel (daily) RM 50
– Grease (daily) RM 5
Operation Cost
Operator cost = RM 40
Diesel = RM 50
Grease = RM 5
TOTAL OPERATION COST FOR 5 YEARS (RM 350 000 + RM 35 000 + RM 175 000 +
RM 130 625)
= RM 690 625
excavation should not exceed 300mm depth (average depth is 150mm) for a 900 m2
field area. Type of soil is sand, and all excavation works to be done manually. If gross
profit required is 15%, how much cost for the site clearing is needed.
Given information:
Labour constant
Total = 1.9hrs