E-E

128

Stripping = 0.00 sqm

Excavation = 0.00 sqm

Embankment = 0.00 sqm 125


Soding = 0.00 m

bidang persamaan
reference level
123.00

122.618

122.601

122.653

122.627

122.608

122.626

122.614

122.571

122.589

122.598

122.623

122.617

122.641
122.58
ELEVASI TANAH ASLI

122.7
ORIGINAL GROUND LEVEL

JARAK (m)
5.07 5.08 3.79 6.55 4.29 5.48
DISTANCE (m)

F-F
129

Stripping = 0.00 sqm

Excavation = 0.00 sqm

Embankment = 0.00 sqm 125


Soding = 0.00 m

bidang persamaan
reference level
123.00
122.621

122.616

122.627

122.622

122.611

122.622

122.648

122.637

122.591

122.643

122.653

122.664

122.616

122.626

122.606

122.632

122.663

122.673

122.647
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (m)
4.70 3.27 10.65 3.62 3.98 3.11 2.86 4.10 5.73
DISTANCE (m)

SKALA :1:100 DIGAMBAR : SELY SALYINDRI KETERANGAN :


SATUAN : MM NPM : 19731031
TANGGAL : 31 Oktober 2021 DIPERIKSA : Ir.H.Surprapto,M.P.

PERENCANAAN NO.10