A-A

129

Stripping = 0.00 sqm

Excavation = 0.00 sqm

Embankment = 0.00 sqm 125


Soding = 0.00 m

bidang persamaan
reference level
123.00
128.812

128.558

128.394

128.023

127.665

127.180

126.773

126.301

125.708

125.068
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (m)
5.93 4.11 5.29 5.11 5.15 5.57 5.43 5.98
DISTANCE (m)

B-B

Stripping = 0.00 sqm

Excavation = 0.00 sqm

Embankment = 0.00 sqm 125


Soding = 0.00 m

bidang persamaan
reference level
123.00
128.558

128.335

127.927

127.277

127.018

126.531

126.057

125.420
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (m)
6.75 6.78 6.85 6.23 5.52 5.15 6.55 4.99
DISTANCE (m)