You are on page 1of 10

Bar Bending Schedule - RCC Slab

mm
230
6 Dia @ 180 mm C/C

300
mm 8 Dia @ 170 mm C/C

mm
230
Designed By: #BOSS PLAN For More
About Surveying & Civil Engineering Join Us @ www.fb.com/LandSurveyors

4000

230 100
mm mm

230 2000 230 Ends Cover =


Note: All Input data Cells mm mm
are in Red Color Top Cover =
Bottom Cover =

Cut Length of Bar Dia No Length (m) Total Length (m) Weight in Kg/m
100 - 2 x 13 2410 + 18 x 8 Pi 8 2
- 8= 66 + 0.414 x 66 2.5813 x 27 4 x 1000 x 7860
8 4410
170 + 1 = 2581.32
= 2.58132 m 69.696 0.39489 Kg/m
2000 + 2 x 230 - 2 x 25
= 2410 mm 27 No Additional Length for each
crank = 0.414d

2410 + 1 Pi 6 2
4.41 x 15 4 x 1000 x 7860
4000 + 2 x 230 - 2 x 25 6 180 4.41 m
= 4410 mm 15 No 66.150 0.22212 Kg/m
Total Weight =

Bar Bending Schedule of RCC SLAB (Practice Sheet)


Cut Length of Bar Dia No's Length of Bar (m) Total Length (m) Weight in Kg/m
Span + 2BW - 2CC Total Length x No Pi/4 x (d/1000)2 x 7860
[(Span - + 18d + 0.414h
EC)/(Spacing
C-C)]+1
[(Span -
EC)/(Spacing
C-C)]+1

Bentup Bars

Straight Bars

Total Weight =
300
mm

For More

100
mm

230
mm

Ends Cover = 25 mm
Top Cover = 13 mm
Bottom Cover = 13 mm
ht in Kg/m Total Weight in Kg

0.3949 x 69.696
7860
27.522 Kg

0.2221 x 66.150
7860
14.693 Kg

Weight = 42.215 Kg

Sheet)
ht in Kg/m Total Weight in Kg
2
/1000) x 7860 Weight Kg/m x Length
Weight = Kg
Downloaded from http://CivilEngineeringBible.com
Downloaded from http://CivilEngineeringBible.com

Downloaded from http://CivilEngineeringBible.com

Downloaded from http://CivilEngineeringBible.com


Downloaded from http://CivilEngineeringBible.com
Downloaded from http://CivilEngineeringBible.com

You might also like