Professional Documents
Culture Documents
SNOC - CM - MOP - SDR HOT Patch Activating and Deactivating Guide - ZTE - v1.0
SNOC - CM - MOP - SDR HOT Patch Activating and Deactivating Guide - ZTE - v1.0
Document Details :
Domain
Document No. Document Title Author
Owner
VIL/SNOC/MOP/20179/ Hot patch SNOC CHM ZTE BSS- Hot patch Swajeet
Sumit Nangia
activation and deactivation activation and deactivation Shukla
Reviewers:
Reviewed
Name Version Approved Position
Date
Approvers:
Name Version Approved Position Approval Date
Distribution List:
Name/Position / Available at Published Date
SNOC, Circle BSS team, Corporate team
Next Review*:
Next Review Date Domain Owner
Sumit Nangia
*Document should be reviewed once every quarter or whenever there is a major change, whichever is
Contents
1. Purpose of Document.....................................................................................................................3
2. Objective.........................................................................................................................................3
3. Scope...............................................................................................................................................3
4. Resources........................................................................................................................................4
5. Impact on Service...........................................................................................................................4
1. Purpose of Document
This technical document covers the activity of Hot patch activation and deactivation in the
OMMB for Circles. The purpose of this document is to describe the actions needed for
Activation & Deactivation of Hot patch in OMMB
2. Objective
The objective of this MOP is to provide the user as to how to perform Hot patch activation and
deactivation in OMMB.
3. Scope
The scope of this process document is to present the process Hot patch activation and
deactivation in OMMB, which is to be observed by SNOC, for ZTE based circles and
Corporate Team.
This process is for Vodafone Managed Circles Only.
4. Resources
5. Impact on Service
Outage Involved: YES
Outage Severity: Major
Outage Severity in case of fallback: Total
Outage Time & Duration: 20 mins
Preparation:
Totally we need to load 2 hot patch, and these 2 hot patch are based on version:
V4.17.10.20P50
PLAT: COMMON_HOTPATCH_4.17.10.20P50H01
LTE: LTE-FDD-SW-4.17.10.20P50.HP.637.1106
Check the running version of the sites, the running version should be V4.17.10.20P50
After uploading, we can see the 2 hot patches are in the version package list:
Sr
Execution Outage Time Duration for Activity in
No Activity Process
Time Inv mins
.
Checking CR if all required data
1 Day No 20
provided
2 Validate the plan Day No 10
Hot patch Activation & Deactivation
3 Night yes 20
activity
5 Post check Night Yes 10
6 For Roll Back Night Yes 20
S. Statu Remark
Points need to be checked
No. s s
1 Verification all running Hot patch at planning sheet
2 Cross check all cell services
3 Ensure after activity no alarm in network