SISA AC-BC LEVELING YANG BELUM DI KERJAKAN

KM-9 POSISI KANAN


UKURAN
LEBAR TEBAL BJ BERAT
No. LOKASI / KM. Ki / Ka PANJANG LEBAR LUAS KETERANGAN
RATA2 RENC. CAMP HOTMIX
(m) (m) (m) (m2) (m) (ton/m3) (ton)
A B C D E F G = DxF H I J = GxHxI
RUAS JL. BTS. KOTA SEMARANG - BTS. KOTA DEMAK
1 09+000,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
2 09+025,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
3 09+050,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
4 09+075,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
5 09+100,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
6 09+125,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
7 09+150,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
8 09+175,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
9 09+200,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
10 09+225,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
11 09+250,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
12 09+275,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
13 09+300,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
14 09+325,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
15 09+350,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
16 09+375,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
17 09+400,00 KA 7,50
25,00 7,50 187,50 0,070 2,320 30,45
18 09+425,00 KA 7,50
25,00 7,50 187,50 0,070 2,320 30,45
19 09+450,00 KA 7,50
25,00 7,50 187,50 0,070 2,320 30,45
20 09+475,00 KA 7,50
25,00 7,50 187,50 0,070 2,320 30,45
21 09+500,00 KA 7,50
25,00 7,50 187,50 0,070 2,320 30,45
22 09+525,00 KA 7,50

JUMLAH 525,00 3.937,50 639,45


JUMLAH SD HAL INI 525,00 3.937,50 639,45

13
KM-17 POSISI KANAN
UKURAN
LEBAR TEBAL BJ BERAT
No. LOKASI / KM. Ki / Ka PANJANG LEBAR LUAS KETERANGAN
RATA2 RENC. CAMP HOTMIX
(m) (m) (m) (m2) (m) (ton/m3) (ton)
A B C D E F G = DxF H I J = GxHxI
RUAS JL. BTS. KOTA SEMARANG - BTS. KOTA DEMAK
1 17+045,00 Ka 7,50
5,00 7,50 37,50 0,070 2,320 6,09
2 17+050,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
3 17+075,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
4 17+100,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
5 17+125,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
6 17+150,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
7 17+175,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
8 17+200,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
9 17+225,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
10 17+250,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
11 17+275,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
12 17+300,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
13 17+325,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
14 17+350,00 Ka 7,50
25,00 7,50 187,50 0,070 2,320 30,45
15 17+375,00 Ka 7,50
17,00 7,50 127,50 0,070 2,320 20,71
16 17+392,00 Ka 7,50

JUMLAH 347,00 2.602,50 422,65


JUMLAH SD HAL INI 872,00 6.540,00 1.062,10

14
KM-20 POSISI KIRI
UKURAN
LEBAR TEBAL BJ BERAT
No. LOKASI / KM. Ki / Ka PANJANG LEBAR LUAS KETERANGAN
RATA2 RENC. CAMP HOTMIX
(m) (m) (m) (m2) (m) (ton/m3) (ton)
A B C D E F G = DxF H I J = GxHxI
RUAS JL. BTS. KOTA SEMARANG - BTS. KOTA DEMAK
1 20+400,00 Ki 7,50
25,00 7,50 187,50 0,072 2,320 31,32
2 20+425,00 Ki 7,50
25,00 7,50 187,50 0,072 2,320 31,32
3 20+450,00 Ki 7,50
25,00 7,50 187,50 0,072 2,320 31,32
4 20+475,00 Ki 7,50
25,00 7,50 187,50 0,072 2,320 31,32
5 20+500,00 Ki 7,50
25,00 7,50 187,50 0,072 2,320 31,32
6 20+525,00 Ki 7,50
25,00 7,50 187,50 0,072 2,320 31,32
7 20+550,00 Ki 7,50
25,00 7,50 187,50 0,072 2,320 31,32
8 20+575,00 Ki 7,50
25,00 7,50 187,50 0,072 2,320 31,32
9 20+600,00 Ki 7,50
25,00 7,50 187,50 0,072 2,320 31,32
10 20+625,00 Ki 7,50
25,00 7,50 187,50 0,072 2,320 31,32
11 20+650,00 Ki 7,50

JUMLAH 250,00 1.875,00 313,20


JUMLAH SD HAL INI 1.122,00 8.415,00 1.375,30

15
KM-20 POSISI KANAN
UKURAN
LEBAR TEBAL BJ BERAT
No. LOKASI / KM. Ki / Ka PANJANG LEBAR LUAS KETERANGAN
RATA2 RENC. CAMP HOTMIX
(m) (m) (m) (m2) (m) (ton/m3) (ton)
A B C D E F G = DxF H I J = GxHxI
RUAS JL. BTS. KOTA SEMARANG - BTS. KOTA DEMAK
1 20+400,00 Ka 7,50
25,00 7,50 187,50 0,072 2,320 31,32
2 20+425,00 Ka 7,50
25,00 7,50 187,50 0,072 2,320 31,32
3 20+450,00 Ka 7,50
25,00 7,50 187,50 0,072 2,320 31,32
4 20+475,00 Ka 7,50
25,00 7,50 187,50 0,072 2,320 31,32
5 20+500,00 Ka 7,50
25,00 7,50 187,50 0,072 2,320 31,32
6 20+525,00 Ka 7,50
25,00 7,50 187,50 0,072 2,320 31,32
7 20+550,00 Ka 7,50
25,00 7,50 187,50 0,072 2,320 31,32
8 20+575,00 Ka 7,50
25,00 7,50 187,50 0,072 2,320 31,32
9 20+600,00 Ka 7,50
25,00 7,50 187,50 0,072 2,320 31,32
10 20+625,00 Ka 7,50
25,00 7,50 187,50 0,072 2,320 31,32
11 20+650,00 Ka 7,50

JUMLAH 250,00 1.875,00 313,20