MASONRY
Vertical Horizontal Module Cost 40%Labor
Mark Area No. of 6" CHB Cement Sand 10mm @ 0.60m 8mm @ 0.60m TW 25cm
Front 40.24 503 40.76312 3.395451 85.7112 86.516 1.0563 ₱25,589.37 ₱10,235.75
Side 43.9 548.75 44.4707 3.704282 93.507 94.385 1.152375 ₱27,916.83 ₱11,166.73
Rear 36.4 455 36.8732 3.071432 77.532 78.26 0.9555 ₱23,147.44 ₱9,258.98
Firewall 53.34 666.75 54.03342 4.500829 113.6142 114.681 1.400175 ₱33,919.90 ₱13,567.96
Total 2174 176 15 370.3644 373.842 4.56435
say 370 374 4.5
per 100 21.74 n x 6m = 62 62