Professional Documents
Culture Documents
INSPECTION REPORT
1.0 GENERAL
STEP DESCRIPTION Accept/Reject
1.1 Bogie Fabrication is completed and ITP signed off.
1.2 Inspect for corrosion protection with no sign of bare metal.
1.3 Inspect and confirm Bogie Identification.
1.4 Inspect overall of paint quality.
1.5 Inspect Bogie been placed on transport stand prior for
packing and shipment
ACCEPTED / REJECTED
Comment:
References:
Production Manager
Quality Control