CODELCO CHILE
INNOVATION, PROJECTS
& GOVERNANCE
René Orellana Flores,
Water & Tailings Corporate Manager
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 2
CODELCO TECH + ENGAGEMENT
Subsidiary merger
Challenges
Solutions
To add value!!!
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 3
TAILINGS CHALLENGES
EXTERNAL
Regulations
Higher tonnage treatment
ICMM
More storage capacity Mining Council
Programa Tranque
Reduce footprint
Best Practices
Increase water recovery
NEW
NEW WAY OF TAILINGS
MANAGING GOVERNANCE
TAILINGS SYSTEMS
Sustain physical & chemical
INTERNAL
stability
PMS
Improve relationship with
Tailings Policy
community Internal Standards
Operation Guidelines
Aplication of Best Practices
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 4
CODELCO TAILINGS DEPOSITS
OVEJERÍA ACTIVE
PIUQUENES INACTIVE
CARÉN ACTIVE
CAUQUENES SEMI-ACTIVE
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 5
EXAMPLE FROM THE PAST
Chuquicamata make up evolution Ministro Hales make up evolution
Concentrator processing, fresh water, & make up evolution Make up concentrator Ministro Hales (m3/Ts)
Chuquicamata (1988-2016) 2015-2018 monthly average
65 1,20 0,69
Concentrator Processing /Fresh Water
60 1,10
0,64
55
1,00
0,59
50
0,90
Make Up
45 0,54
0,80
40 0,49
0,70
35
0,44
0,60
Ene-15
Feb-15
Mar-15
Abr-15
May-15
Jun-15
Jul-15
Ago-15
Sep-15
Oct-15
Nov-15
Dic-15
Ene-16
Feb-16
Mar-16
Abr-16
May-15
Jun-16
Jul-16
Ago-16
Sep-16
Oct-16
Nov-16
Dic-16
Ene-17
Feb-17
Mar-17
Abr-17
May-17
Jun-17
Jul-17
Ago-17
Sep-17
Oct-17
Nov-17
Dic-17
Ene-18
Feb-18
Mar-18
30
25 0,50
20 0,40
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
Concentrator processing Mton/year Fresh water Make up m3/Ton
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 6
TAILINGS & WATER CURRENT PROJECTS :
WATER TREATMENT AND RECOVERY OF VALUES
Zero liquid discharge: by capturing and treating Recover value components from tailings
infiltrations, under existing conditions and produced by copper mining companies, by
post-closure, including interaction with developing and/or adapting technologies
surface water. technically and economically viable, and
ensuring waste disposal is chemically and
Treatment and neutralisation of tailings before
physically stable.
disposal and potential industrial use of tailings.
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 7
ONLINE RHEOMETER - DMH (CSIRO)
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 8
TALABRE - THICKENED TAILINGS PROJECT
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 9
NORTH DISTRICT FILTERED TAILINGS PROJECT
END POSITION
BELTS (ESTIMATED)
TAILINGS LINES
(ESTIMATED) EB TAILINGS DMH
(IN PLACE)
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 10
MINISTRO HALES
FILTERED TAILINGS MAKE UP
MINISTRO HALES CONCENTRATOR MAKE UP (M3/T) 2015 - 2018 MONTHLY AVERAGE
0,69
0,64
0,59
0,54
0,49
0,44
Ene-15
Feb-15
Mar-15
Abr-15
May-15
Jun-15
Jul-15
Ago-15
Sep-15
Oct-15
Nov-15
Dic-15
Ene-16
Feb-16
Mar-16
Abr-16
May-15
Jun-16
Jul-16
Ago-16
Sep-16
Oct-16
Nov-16
Dic-16
Ene-17
Feb-17
Mar-17
Abr-17
May-17
Jun-17
Jul-17
Ago-17
Sep-17
Oct-17
Nov-17
Dic-17
Ene-18
Feb-18
Mar-18
2025
0.15
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 11
OTHER KEY PROJECTS
• VII Phase – Carén Embankments – El Teniente
• VIII Phase - Carén Embankment Prefeasibility
• VIII Phase – Talabre Embankments – Chuquicamata
• IX Phase - Talabre Embankment Prefeasibility – Chuquicamata
• Pampa Austral Tailings Deposit Works (PRI) – Salvador
• New Filtered Tailings Deposit at Protrerillos - Salvador
• Infiltration Capture Systems for Tailings Deposits (all).
• Works at Ovejería to operate over 640 embankment level – Andina.
• Closure Plans
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 12
NEW TAILING GOVERNANCE PROJECT
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 13
OVERVIEW
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 14
INTERNATIONAL BEST PRACTICES
Tailings Governance Framework (ICMM):
focuses on preventing catastrophic failures
• Accountability, Responsibility &Competency
• Planning and Resourcing
• Risk Management
• Change Management
• Emergency Preparedness & Response
• Review & Assurance
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 15
GOVERNANCE
Corporate
Water & Tailing
Management
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 16
2018 - 2020 ACTION PLAN
Competency+ Experience+
CAPABILITY+
Resources+ Empowerment
EXPOMIN I TAILING SYSTEMS I COPYRIGHT © 2018 CODELCO CHILE I TODOS LOS DERECHOS RESERVADOS 17
THANK YOU