You are on page 1of 4
fh ~ CEM RESIDENCES CROUNES Ref. No: P20080-ASVA-TR-0328-21 GRIDLINES MGS CONSTRUCTION & PROJECT MANAGEMENT, INC. Unit 1206 Capital House, 9 Ave. Cor 34% St. BGC, Taguig City +#63 (2) 8637 0359 | info@gridlines. mgs. com.ph | www gridlines.com. ph. Date: September 21, 2021 Transmittal Form Dear Sir / Madam, Please find attached the following item (s): Drawing Title/Description NoJReferense No, | Copies| Remarks ‘Altention to: Arch, Jonathan Victor R. Vivit Thru: Arch, Prince Reyes Proposed Additional 150 Diameter Dp_ | P200S080 17 PSRFA-) 3 | For Approval Piping Layout to Connect 150 Diameter “ DS at 8th Floor, GL F/11 to 7th Floor, Fs nothing folows — | D for information O for action O for tender 1 for construction © for other: for approval/ comments Received by: Time: F-OPS-006-0 EFF: 07/27/20 Page 1 of 1 Tov GEM |(@) stectromecn Be; resipences | ‘ld’ CORP. a Ref. No.: P20030-CPT7-PS-RFA-0110-21 REQUEST FOR APPROVAL (RFA) Contract Package PLUMBING SANITARY WORKS Contractor MC MONTGEAR ELECTROMECH CORP. For Submission To | AS¥A ea Name, Date and Time: Submited 3y: JW. B98 0 Received By CONTRACTORICH, Description for Approval: i PROPOSED ADDITIONAL 1503 DP PIPING LAYOUT TO CONNECT 150 3 DS@8™ FLOOR, GL F/11 TO 7™ FLOOR, GL F/13. Yes No i Romans With Cost plications? a o With Time Implications? a o Oisctamer: The flowing Roms are hereby submits for view. Wie also cert that the tems submited ere in ull compliance with the Contract documents, (NB: Any devtions ere tobe submited separately under a Request or Deviation). Reports _£ Drawings nufacturers Literature Tcertticates “Test Procedures Samples other (Pls. Speciy) Company Responsible Person Date Received Bate PUG (CM Pri = Client/Designer/Consutant: ‘Approver's Comments on Submittal: Remarks (Ps. check) ‘Approved ‘Approved with Comment, Resubmit by. ‘Approved with Comment, Resubmission not required Resubmit Rejected NB. 1) Approve or review hereunder shal ot be construed fo relive to Cartractor f his responsbiltios and labilty undor tho Contact ‘atonal Comment Tfyou consider that a change in the Contract Amount or Contract Time is required, nolily the Project Management Group within 48 hours from your receipt of the above response and prior to your proceeding with affected work. ‘Submit a Change Order Proposal to the Project Management Group within seven (7) days from your notification sgement ——tentactor Name and Signature Name and Signature OD comace = Ooms =O F-OPS-008-1 EFF : 01/22/21 Page | of 1 F-OPS.008-1 EFF: 01/22/21 Page 2 of 2 ©) dasOdoud 4 a wooly Ghd

You might also like