BILL OF QUANTITIES FOR To construct garden Gazebo at the faculty of Science and Technology Caz Desenption Unt Geant Fate z ] Xcavation and Earthw Excavation 1. Footing not exceeding 800mm deep M3634 $4,500.00 $28,530.00 Backfil 2 To back fil around wall Footing Ma, 12 $2,500.00 $330,000.00 Hardcore 3. To dump up floor with selected materials M3608 $1,500.00 $7,620.00 Super Structure, Concrete Work Nominal Concrete Mix in Accordance with BSCP 114: 1957 Min. Compressive cube Strerath 21,00 MN/M3 in 7days and Max. WIC ratio of 0.45 in: 4 Foundation footing M3104 $25,000.00 $26,000.00 5 150mm ground foor slab M2 835 $7,500.00 $62,625.00 6 100x100 mm. hollow section column (3.3m tong) M 19.8 $8538.00 $169,052.40, 7 100.x50mm bracket welded to 100 x100mm holow section No 6 $2,500.00 '$18,000.00 8 13mm diax 100mm. Nut and bolt no 12 $720.00 $8,640.00, 8 Je Mash in floor slab M2 835 $3,200.00 $26,720.00 or $374,167.40 10 " Walling and Masonry 1150 mm thick te block wall witht:3:6 concrete in all ts, in 1:3 coment and sand motor joint and built around reinforcement (mis) 4160 mm Block wall Reinforcement 19 mm dia, Steel bar set vertical in block wall Roof Structure 100 x 100mm plate 50x 180mm rafters Wood ornamental spire PVC lattice 16mm ply board soffit 25x100mm cornice board 25x100mm fascia board Hurricane strap ROOF FINISH Fiber ftt Cedar shingles To install metal ashing cr Me 23 54 2 2 " $6,300.00 $240.00 2300 390 2500 4500 5200 590 1750 220 1250 13024 2300 $374,187.40 $51,849.00 $12,960.00 23,000.00 185,800.00 2,500.00 37,360.00 62,400.00 18,340.00 17,850.00 5,280.00 16,000.00 186,288.00, 25,300.00 $985,104.40 29 30 31 2 BF Wall Finishing and Painting Rendering 13 mm thick cement and sand motor as rough cast and grat Was labour to Arises To construct step Painting Walls Ceiling Finishing, Painting ‘Apply three (3) coats of emulsion paint to render soffit of caling Metal Work All steel and Iron shall have rust and scale removed by scraping and steel wire brushing immediately before painting, All welding shall be neat and uniform in size. AlLwelded joint shall be painted with two coats of approved. ‘metal primer, To fabricate and install balcony rails, made from 1° x1" Hollow section and 1/2 square bar Painting Apply two (2) coats of ol paint to all metal works cir Me Ps M2 m2 M2 832 44 aaz 2 23 ‘$1,800.00 $250.00 $420.00 $540.00 $5,090.00 $320.00 $885,104.40 $14,976.00 $11,000.00 $18,000.00 $3,494.40 $6,480.00 $61,080.00 $7,360.00 $51,007,494,80 33 35 36 Hand Rail Construct 2" x4" W.P.P top rail and paint with ol paint SENERAL ITEMS To supply and lay 12mm crush white ime stone as walk way around Gazebo 900 wide and 150mm thick Clear away all rubble, debris, garbage ete. from Inside the house and cart away from site, Preliminary Work ‘Add 5 % for preliminary work Total Estimate Cost BF Me TEM Item 10 a4 $1,007,494.80 $1,250.00 $12,500.00 83,500.00 $29,400.00 $20,000.00 $52,600.00 $1.121,994.80

You might also like