‘QATARGAS Qatar Liquefied Gas Company Li Mailing Address: P. O. Box 22666 Doha Qatar Telephone: +974 474 1500 Fax: +974 474 1600 DOCUMENT TRANSMITTAL To: 1, KURODA, SITE MANAGER CONTRACTOR - SITE OFFICE (CTJV) P.O. BOX 22483, RAS LAFFAN, QATAR From: Frank H. Milburn ‘Onshore Sub Project Manager Phone: +974 474 1501 DATE: 17/10/2006 OUR REF.NO.: QGX-T-QR-CS-2856 Response Required - Date Response Required : The documents REVIEW/ APPROVAL COMPLETE cated below are transmitted for. Comments Code Legend A- Approved B - Approved - (With Comments) R - Not approved C - Reviewed - (With No Comments) D - Reviewed - (With Comments) Document No. Rev. No. Title Comment Code. Ref. Number 0151-Ms-01 3 MS FOR CONSTRACTION OF THE A QGX-T-CS/QR-03403 MARINE FLARE SUPPORT STRUCTURE USING SELF ELEVATED PLATFORM (SEP) Remarks: NONE. Review Coordinator DAVID DUPCHAK ee Regards, ‘Onshore Sub Projekt Manager Qatar Liquefied Gas Company Limited (Il) Page | of | CHIYODA TECHNIP JOINT VENTURE - QGX QGII LNG Onshore Facilities Project, Maling Access: POBox 22485 Teleghone: 0874 474 1110 Ras Lafon Ste Oftce Fax 9744741128 DOCUMEN To: Mr. Frank Milburn DATE: 11" October, 2008 Onshore Project Manager 2 Qatar Liquefied Gas Company Lid. (I) REFNO: QGX.T-CSIQR- O54?OS Ras Laffan Contract: GTC-QGI-ONS-15 From: |. Kuroda Job No, Sr. Site Manager Su ee nds Subject: METHOD STATEMENT Response Required: OH Yes 1 __No__ Requested Date: SHES | Process &SRU__| | Upstream, Utilities, & Offsites QAsQC. | Engineering @ | CLP/OFplot | camp &TSF__ Management _| 1 | Business & Admin_| O1 | Planning & Controls D1 | Interface | Building | | Material Management Issued for: pe eee [CO Approvat 1 Review &Comment Information LO Construction __—_—*L_ Record fed : Qty. DocumentNo | Rev. Title ionee 192 Ot61-MS-01 3 | MIS For Construction of the Marine Flare Support Structure i ing Self Elevated Platform (SEP). z Remarks: Distribution: WA: ASI(u), DCC, Originator-WK/kav GATARGRE OPERATING 9) nine 8 Co ff o recip bit ett ~ Gx Received by: Title: ______ Date: Ke ARCHIRODON CONSTRUCTION OVERSEAS CO. S.A. METHOD Document Ref. | see | o1si-Ms-01 Revision 3 Page lo 12 ras | PROJECT MANAGEMENT SYSTEM L CER --_QGX GGH LNG ONSHORE UTE MOET 7 ered Ww a > [Rotowed | heat m4 08 Berth 4 # Marine Flare Support Structure For QG I LNG Onshore Facilities PROJECT A Ras Laffan, Qatar. Method Statement For the Construction of the Marine Flare Support Structure Using Self Elevated Platform (SEP) ‘Tsswe Status & | Issued for approval. 7 Description Hi Hl Prepared by | Reviewed by | Approved by ‘Document, | Ren | Isene Date | Comsiraction | Project ec Project Section Section Manager ‘0151-MS-01 3 | 15 July 2006 M. Wate | M. Naguib K Pieniazek Appendix A. 3 | 15July2006 | Appendix B 1 | 13 June 2006 ix C 1 | 13June2006 | ‘Appendix D 3 | 15 July 2006 PON “Appendix B 2 | 29 June 201 ‘Appendix F 1 | 29 Sune 2006 Appendix G 1_|15 July 2006 ARCHIRODON CONSTRUCTION (OVERSEAS) Co. SA ‘METHOD ‘Document Ref, i : STATEMENT 0151-MS-01 Revision 3 Page 2 of 12 M.S, FOR MARINE FLARE SUPPORT CONSTRUCTION _ LIST OF CONTENTS 1.0 Introduction. 2.8 Document Control. 3,0 Health, Safety and the Environment 3.1 Health and Safety Hazards....... 3.2 Adverse Environmental Impacts. 3.3 Transportation. 3.4 Communications. 3,5 Noise Monitoring. 3.6 Dust control. 4.0 Al 42 5.0 References... 6.0 Methodology 61 Schedule of Work. 6.2 Construction Works 62.1 Construction Scope. 62.2 — Sequence of Installation of Piles. 623 Construction of RC. Structure Platform. 62.4 Miscellaneous Items... 7.0 Quality Control... Appendix A Safety Hazard Control Programme and Job Safety Procedure ‘Appendix B Environmental Impact Statement ‘Appendix C Inspection and Test Plan / QC Forms Appendix D Drawings ‘Appendix E Equipments ‘Appendix F Schedule of works ‘Appendix G Night Shift Procedure CORP-GEN-15 Rev. 1 an eae aa STATEMENT 0151-MS-01 1.0 LL 12. 20 21. 22. 23. 3.0 34 ARCHIRODON CONSTRUCTION (OVERSEAS) Co, SA 1 Meee Document Ret | Revision 3 Page 3 of 12 MS. FOR MARINE FLARE SUPPORT CONSTRUCTION INTRODUCTION “This method statement presents an overview of the principal methods and equipment to be used to construct the three main elements of the Works related to Berth # 4 Marine Flare Support Structure, © Piles Reinforced Concrete Platform ‘Miscellaneous Items ‘This method statement and job safety analysis are hereby developed within these elements to describe in more detail the methods used, the resources deployed and the Goutrols put into place to eliminate or mitigate safety hazards end adverse environmental impacts. DOCUMENT CONTROL “This method statement is a controlled document as required by the system procedure Quality Planning and issued in accordance with the system procedure Control of Documenis and Data. “The method statement is subject to amendment during the execution of the Works as a result of periodic review and whenever circumstances require subject to CTV approval. Revisions will be issued in accordance with the system procedure Control of Documents and Data whenever the main text changes or when. an appendix is chided or removed. Revised appendices for substitution will be issued separately and, ‘where appropriate, will inctude a separate schedule of contents. ‘This document's revision and appendix issue status is shown in the Project Register of Management Sysiem Documents, a copy of which may be obtained from the Project Office upon request.. HEALTH, SAFETY AND THE ENVIRONMENT Health and Safety Hazards ‘As required by the Project Health & Safety Plan, the significant heelth and safety hazards of this work have been analysed in accordance with the general. procedure Hazard Analysis and Environmental Impact Assessment and ere listed below. Security Hazard / Possible unauthorized access Traffic aocidents Falling of personnel and equipment into the sea, drowning Lifting bazard / Falling object Noise level ‘Night time working STATEMENT 0151-MS-01 ARCHIRODON CONSTRUCTION (OVERSEAS) Co. SA METHOD DocumentReE | Ran; Revision 3 Page 4 of 12 | 3.42 32 3.21 3.2.2 33 342 34 341 MLS, FOR MARINE FLARE SUPPORT CONSTRUCTION, cial ‘© Exposure to concrete » Electrical hazards / Welding (working near or over watcr) Controls wil be implemented to minimise these hazards as set cut in the form Safety ‘Hazard Control Programme included in Appendix A. Adverse Environmental Impacts ‘As required by the Project Environmental Plan, the significant averse Gavircnmental impacts of this work have been analysed in accordance with the general procedure Hazard Analysis and Environmental Impact Assessment snl are listed below. Waste and debris disposal Pollution from equipment due to leakage or during refuelling Pollution from the washing out of the concrete track mixer Pollution from hydraulic hose leakage / burst Noise level Controls will be implemented to minimise these adverse impacts, #8 set out in the form Environmental Impact Statement included in Appendix B. ‘Transportation. ‘The transportation of ell project materials such as the fibricated piles, concrete ete. 10 the MFL #4 area will be by Sea via tug boats and barges. “The access for equipment and personnel to the working area, for the MFL # 4 area Will be through the existing jetty temporary at Archirodon Lay down area inside Ras Laffan Port See appendix-D. Communications. Marine Equipment will be provided with VHF station, They shall co-ordinate each Giher ia VH Frequency different than the one used at Ras Laffen Port in order not to Saterfore swith their operations. Communication between CTIV and Archirodon shall te held through mobile telephones. sw | Company Name Title Mobile No. 1 | RLIC | Harbour Master Hasbour Mester eae 7 Ten [ean Pierre Tholozan Construction Manager | 5570327 [> [enw [Michal hewry | Matin Ae? stanagor | _ 5895028 @ [ARCO | KarotPieniazck _| Project Menager 5886015 [5 [ARCO | Maged Wadie Construction Manager | ARCHIRODON CONSTRUCTION (OVERSEAS) Co. SA METHOD ‘Document Ref. ue | : STATEMENT 0151-MS-01 Revision 3 | PageSof 12 | iF M.S, FOR MARINE FLARE SUPPORT CONSTRUCTION 7] 3.5 Noise monitoring. 3.5.1 Periodio noise monitoring will be carried during construction of MEL. # 4. 352 Whenever noise level exceeds the 85 (Dba) all employees will be instructed to wear PPE (earplugs). 3.5.3 The noise level range produced by the construction ‘equipment will be as follows: EEE CHE-eHe-PEEeeEE Pearse Sato Sommer | Piling rotary drilf ~ 36-90, Crawler crane 70-94 “| ‘Vibro ee 85-102 WMobilecane 7-102, ‘Concrete truck mixer / Pump Tessthan 85 — ‘Welding set / Air 92 3.6 Dust control. 3.6.1 Personnel exposed to dust sball wear dust masks. ARCHIRODON CONSTRUCTION (OVERSEAS) Co. SA METHOD Document Ref. ei y 7 STATEMENT 0151-MS-01 | Revision 3 [_ Page 6 0F 12 | NLS, FOR MARINE FLARE SUPPORT CONSTRUCTION | 40 RESOURCES 41 Equipment 4:1. The rain equipment envisaged forthe above works include the following: ‘Fable 4.1 Plant List Equipment Make/Size —_|No. Task | Fackoup barge equipped | Jay Robertson 1 | Work platform for with cantilever platform driving, drilling and |__| concreting of piles. Floating Crane Tima 2400 (30 | 1 | Concrete platform | Grawler crane Maniiowoe 4100W [1 | Handling of piles on con deck of jack-up jack-up platform and : barge (1801) _ driving ‘Fransport barge ‘Minimum T | Transport piles and dimension 9m x conerete fo jack-up Aon platform Mobile crane 30 ton T | Onshore handling of P ‘Vibratory hammer ice sI5 1 Driving of piles Impact hammer THC.90 1_[ Driving of piles Piling rotary drill with | Bauer BG-30 T | Dailling for socket associated drills, stabilizers, casings, etc. Transit mixers, remie Placing of concrete pipes i Tug boats 700 — 1000 HP | 4.1.2. Water, lubrication and fuel services, to the above equipment will be provided from “Archizodon facilities at the temporary Project Lay down Area, located inside Ras Laffan Port. 4113. Workshop services equipment will be provided from the workshop facilities et the Project Lay down Area. Area. located inside Ras Laffan Port. 4.14 All equipments stall be holding valid certificate from a third party inspector and shall be subject to CTSV inspection. 4.2 Personnel ~ Responsibility ~ Work pattern. 42.1 The Construction Manager is responsible for the organization and coordination of the entire work. 4.22 "The responsible Site Engineer will overses the pile and concrete actvitics. He will be responsible for instructing the foreman about the requirements of the contac ARCHIRODON CONSTRUCTION (OVERSEAS) Co. SA METHOD Document Ref. , SOATEMENT ast aelo | Revision 3 | Page 7 of 12 | ‘WLS. FOR MARINE FLARE SUPPORT CONSTRUCHON | 423 424 425 42.6 427 428 429 Note: Safety Officer shall be permanently on Barge. including all restrictions, safety regulations, and work-scope and time schedule. In sadition, he will be responsible for related logistic matters. ‘The foreman is responsible for implementation of the intemationel regulations regarding the safety in all activities. “The Safety Officers are responsible to assist the construction {earn fo develop safe weeds of working and to monitor implementation of the controls putin place- The PM is responsible for the management and co-ordination of ll the sub- ae detors and concerned authorities, so as the works on the project to be carried out saree sad environmentally way f meet contract requirements, in particular for ime and quality. Construction activities will be carried on a 24-hours basis. Night Shift Procedure Shall be adopted. (Refer to Procedure CORP-GEN-15 Rey. 1 included in Appendix G) “The activities will be coordinated closely between Archirodon and crv. Bach shift has total duration 12 hrs but actual working hours ate 10 with a total break down of 2 Hrs. ‘The manpower for this work includes the following: Manpower Deployment Schedule Description No Site Engineer ee Foreman, a ‘Asst, Piling Foreman Piling Technicians ‘Land surveyor ‘Drill rig operator Grane operator [Concrete pump operator Concrete mixer driver Qualified Welders ‘Asst. Concrete Foreman Labourers cette “Mason | Carpenter Steet fixer Safety offiver for each shift we) a} el! | | | if | a | ARCHIRODON CONSTRUCTION (OVERSEAS) Co. SA ‘METHOD ‘Document Ref. STATEMENT. 0151-MS-O1 Revision 3 | Page 8 of 12 6.0 64 612 612 6.2 624 MLS. FOR MARINE FLARE SUPPORT CON STRUCTION _ 4 REFERENCES ‘system procedure CORP-SYS-01 Quality Planning ‘System procedure CORP-SYS-02 Control af Documents and Data General procedure CORP-GEN-04 Procurement of Materials and Services General procedure CORP-GEN-12 Hazard Analysis and Environmental Impact Assessment Project procedure 0151-SP-01 Control of Inspection and Testing project procedure 0151-SP-02 Control af Quality Records Project plan 0151-PQR-O1 Project Quality Plan Project plan 0151-PSP-01 Project Health, Safety &Security Plan Project plan 0151-PEP-O1 Project Environmental Plan EHIV procedure QGX/20/00/QA/SWINA/O16 Welding Requirement of Site CCTIV procedure QGX/20/00/QA/PCINA/002 Enspection Coordination Procedure (With Subcontractor) e CTIV procedure QGX/20/00/QA/PCINA/O20 QA/OC Requirements for Subcontractors « CTIY specification for concrete material, mix and construction, QGx/120/00 {CLDBINN/008, CITY specification for lifting procedure QGX/120/00/SA/PCINA/104 CTIV IFC list of drawing : (Refer to Appendix C) © QGX/2T/74/MP/DRIPP/001 ~ 003 “Plot Plan” © OGX/27/74/ST/DRIGAISOL © QGX/27/74/STIDR/DT/502 to 506 eesbere METHODOLOGY Schedule of Work Construction activities will be caried on 4 24-bours basis, and each shift het total cont of 12 hrs but actual working hours vill be for 10 hrs. Detel schedule is attached to Appendix F “The activities will be coordinated closely between Archirodon and CTV. Construction Works Construction Scope 6.2.11 Prior to commencing the work, a valid PTW (Permit Of Work) shall be obtained. $2.12 The scope of work of this project consist of the following:- «Anos, raked steel piles anchored to the competent rock in accordance with drawings QGX/27/74/S UDRIGA/SO1. « eaNetoed concrete strocture platform supporting flare stack, bridge & maintenance platform. ARCHIRODON CONSTRUCTION (OVERSEAS) Co. SA ‘METHOD Document REE | Revisi T STATEMENT misraaeor _| Sevisien_ 3 | Page 9 of 12 3S, FOR MARINE FLARE SUPPORT CONSTRUCTION ® Miscellaneous works such as +~ 9. Bridge support plinth 2 Flare stack foundation including anchor bolts installation using template. Maintenance steel platforms. Fabrication & painting of piles (wil be the subject of separate MS) Concrete surface protection ACW. Pads Cathodie protection to piles via sacrificial Zine Anode, ©2000 62.2 Sequence ef Installation of Piles: 622.1. Steel Pipes 12 mits, Long, 12 n08, will be delivered by CTV fo Archirodon se etides Yard, Ajmon, UA. for blasting & painting in accordance with painting specification and spproved MAR. Fabrication and welding will be as per WPS prepared in accordance with AWS D1.1 Standard. 6.2.2.2 Completed piles 4 nos. will be transported to site location at Ras Laffan via deck barge towed by tug boat from Archirodon Facilities Yardy Ajman, UAE. 62.2.3 A self elevated platform ie. “Jay Robertson” ~ IR will be mobilized for the ‘nstallation of piles, Installation will follow the construction steps 8s itlustrated in. ‘Appendix-C drawing no. # 9001 (Sheet 01 of 02 & 02 of 02) Piling Works Sequence, Step 1. Positioning JR ie. self elevated platform Jay Robertson for diling of pile #1, 2 & temporasy pile, 9, Toxiallation of temporary pile in the centr of the 4 racked piles which wit be rt for bracing, purposes of the raked piles. The temporary piles will be tastalled by pre-boring a socket length of 5 mir. & drive the ple in pre-boring socket with vibro hammer. 3, Installation of pile # 1: srs atfonrol the angle of piles, a pile guide frame “template” shall be jpstalled and positioned by Surveyors. ‘The frame will be fixed in position ‘by welding to the drilling platform of IR”. tb. Tooalling the temporary casing 1220mm OD, using drilling tools 1160mm Ob, t0 seat on the competent rock level expected to be 0 to 7.5m deep below sea bed depending on soil condition. ¢. Drilling the socket with 900mm dia drilling tools, & Placing the permancat stel pile 1067mm dia x 25.4 mm thick in position tsing tibro hammer ICE 815 or impact hammer THC 90, For details please refer to Section 4.1) Equipment List ofthis MS. fe. Bracing between the temporary pile and pile # 1. £ Airlift to the drilied socket. ARCHIRODON CONSTRUCTION (OVERSEAS) Co, SA METHOD ~ Document Ref. an STATEMENT ‘O151-MS-O1 Revision 3 Page 10 0f12 | [ RLS, FOR MARINE FLARE SUPPORT CONSTRUCTION 4 623 623.1 6.23.2 4. Tnstlltion of steel reinforcement rebar onge using the fens of IR. Steel tage will be lowered down up to the foe level using long wite slings, cee ected to the steel cage via quick release hook shackles. hh. Pouring conorete to the pile socket minimum Lm higher than the design requirement level. 4, Tnstallation of pile # 2: sas e control the angle of piles, a pile guide frame “template shall be oucled and positioned by Surveyors. The frame will be fixed in position by welding to the drilling platform “IR”. bb. Dotaling the temporary casing 1220mm OD, vsing drilling tools 1/8miy OD, to seat on the competent rock level expected to be 2m deep ‘below sea ded depending on soil condition, ¢. Drilling the socket with 900mm dia drilling tools. 5: Underwater cuting of temporaty easing approx 2m higher from the sea bed. Step B 5, Positioning of JR for drilling of pile #3 & 4. 6. Repeat activity 1 t0 4 as per step A. Step C 7. Positioning of JR near to pile location #2. & 4 2 racing of permanent casing 1067cam dia, fabricated with steel spacer inf the temporary casing. >, Bracing to temporary pile. c. Airlift to the drilled socket, & alltion of steel reinforcement and pouring concrete fo the pile socket as per design requirements. ce. pill the annulus gap between the 2 casings by grout underwaiet, G. Fv Maelee wt ture. e (Pema hole Le puperad ovo) Egnstruction of Reinforced Conerete Structure Platform Bip ere be Fendued - For this purpose a temporary steel structure as per the approved design, shall be rot gravted to support the formwork ofthe reinforced concrete platform ‘and its own Cveight ill the achievement of the required concrete strengsh. (Refer to Appendix C — Drawings 0011-P-O1 & 0011-P-03 Rev. 2) Jnstallation will follows the construction steps : = (Refer to Appendix: C— Drawing 000151-OD-C8-9002 Rev. 1) Construction of reinforced concrete platform steps: a, Welding of fabricated stee! oollar brackets to the piles. b. Bracing between piles. c, Removal of temporary pile. ARCHTRODON CONSTRUCTION (OVERSEAS) Co. SA C “METHOD | Document Ref. a : [ sheremenr|__onsi-nason_| Reviion a Page 11 of 12 | +LS- FOR MARINE FLARE SUPPORT CONSTRUCTION 4. Installation of main and secondary girders. S Placing of soffit and side DOKA formwork pre-assembled at lay down area. £ Placing of steel reinforcement and embedded items. F,Casting of concrete by sea using 2 barges, Each barge will have one concels fanny and 4 sansemixer, One barge will be pouring conerete to the sructive Pee fhe other barge will under loeding with trans-mixer using Archirodon lay down area temporary jetty. bh. Casting of concrete will be in one stage. ter casting, the concrete platform surfaces will be covered by polyethylene sheets and wel Flessian cloths. j. Side formwork will be removed after 36 brs. 1 Soffit formwork will be removed after 21 days. L 624 624.1 624.2 6.243 6.2.44 624.6 6247 Wet suring will continue 21 days from the pouring dato by keeping the hessians elways wet by spraying water. vm. Tnfort are set up on top of the superstructure, Their wires are passed through S0mm dia PVC pipe which have been cast in the superstructure for the purpose of removing the soffit formivork and pile touch up. a, The tirfors wire will be connected to the main girder. ©. Brackets, bracings and collar will removed. Formwork to soffit including secondary and main girders will lower down to qpproximately 2-ms below the sofit for repair of painting at collar position q. After completing all repair and concrete surface protection as required the ‘whole formwork will be lowered to the water level. t The material will then dismantle on 2 pontoon and remove to a barge ‘Miscellanéous Items Bridge flare plinths and maintenance platform will be constructed 2 days after the casting of concrete platform 2s per normal practice, ‘Anodes as per approved MAR will be installed with the help of divers in Anotienee vith IEC drawings, following the RLIC diving regulations in accordance with the approved diving procedure. [All stel reinforcement as per approved MAR will delivered to the site eut & bend as por bar bending schedule prepared as per IPC drawings, Maintenance steel platform will be fabricated and delivered to site ready for installation by Archirodon, Protection coating will be applied to bottom, sides and top surfaces of concrete pletform as per manufacturer instructions. Conerete will be produce ftom Archirodon Batching Plant at the lay down area inside RLIC Port area. Concrete mix design approved by CTIV will be used for piles and concrete platform. ARCRIRODON CONSTRUCTION (OVERSEAS) Co. SA STATEMENT O151-MS-01 70 Td 12 13 ty Lele Document Ref. | Revision 3| Page 12 of 12 | MLS. FOR MARINE FLARE SUPPORT CONSTRUCTION } QUALITY CONTROL ‘The construction and installation works will be surveyed and inspected in ne dence with IFC drawing, Project specifications and TTP’s. Notification to eCEIV", of an Inspection, Test or Survey Activity will be done -with the nse of the foun 0151-SP-01-FOI Noification and Report of Inspection, Test oF Survey Activity (NBD) to we00rd documentary evidence. (Refer to Appendix €—ITP/QC Forms) ‘AIL surveys, inspection and testing will be controlled. by the project procedure Control of Inspection and Testing. Records generated by the inspections and tests will be controlled by the project procedure Control of Quality Records. we Htexpasol, oe ba Wolen Arbee Ghote dete PI 1 beipelel locate + pew ate fe “P? SND OF TEXT - ARCHIRODON CONSTRUCTION (GVERSEAS) Co. SA METHOD ‘Document Ref. | Tse 3 ‘See sections 2.2 & 2.3 for J |_ STATEMENT O151-MS-O1 control of this appendix WLS. FOR MARINE FLARE SUPPORT CONSTRUCTION | APPENDIX A HAZARD CONTROL PROGRAM Title Reference Rev. | Pages Havard Control Program i i 7 ‘CTIV Job Safety Analysis Form 01S7-MS-01APPAISA | _ 1 & ARCRIRODON GROUP NV — CORPORATE MANAGEMENT SYSTEM Generel Provedare CORP-GEN2 Hazard Analysis and Ervironmentl Impact Assessment Safety Hazard Control Programme Project 0151 Berth 4 Marine Flare Support Structure Works for QGII, Ras Laffan, QATAR. SECTION A - WORK ANALYSIS: _ o Part Al Name of Company Archirodon Construction (Overseas) Co. S.A. Date Prepared 13/06/2006 Document Ref. _0151-MS-O1 ‘Name of Supervisor in Charge _Mir. Maged Wadia - Numbers and Disciplines of Personnel Carrying Out the Task Marine / Workshop /Transport PartA2 Scope of Work Marine Flare Support Structure Constraction Works Part A3 Sequence of the Work and Significant Potential Safety Hazards ‘Activity Mobilization of Marine Persounel and Marine eqttipment ‘Hacard “Uncertified personnel or untrained personnel not fil for the task. Hazard _Nian over Board Hazard Equipment Failures. Activity 2 Installation of Piles Hazard _ Heat stress : ‘Hazard “Falling of personael and equipment into the sea, drowning. ‘Hazard Lifting hazard / Falling object Hazard Noise level Hazard _ Night time working 7 ‘Hesurd ”lectzical hazards / Welding (working near of over water) Hazard Exposure to concrete Activity 3 _ Construction of B.C. Structure Platform ‘Hoard Felling of personnel and equipment into the sea, drowning. Hazard Exposure to concrete. Hazard "Lifting hazard / Falling object Hazard “Feat stress “Activity 4 _ Miscellaneous Items — Plinth and Maintenance Platform Construction ‘Hazard “Falling of personnel and equipment into the sea, drowning. _ Hazard Lifting hazard / Falling object Hazard Part Ad Details of Equipment to be Used Cranes _Crawler crane - Manitowoe 4100W on deck of jack-up barge (1800), Mobile crane Plant _Jack-up barge, Tugboat Boat, Piling rotary dill with associated equipments. ‘Vibratory hammer, Impact hammer, Transit mixers tremie pipes, Transport barge Lifling Tackle Only 3" party certification lifting tackle wil be used. Ponable Equipment Survey instruments, Generator, Diesel Welding machine, Light towers “Air compressor, cufing sets, mechanical & electrical hand tools. Sheet 1 of 7 Document ref. CORP-GEN-12-F 0] Rev.2 ARCHIRODON GROUPNV. CORPORATE MANAGEMENT | ‘SYSTEM Genet Procedure CORP-GEN12 Hazard Analy ned Eostrormental Impact Asttsrien Safety Hazard Control Programme WOU AUVeEnA Part AS Check List Response delete inapplicable responses Response Permit to Work Yes 11 Training required Yes Adjacent operations No | 12. Temporary access/work platform Yes Hazardous materials Yes | 13, Personal protective equipment Yes Waste disposal Yes 14 Safe access & standing for plant Yes Material storage Yes 15. Emergency contingency plan Yes ‘Communications Yes 16 Weather limitations Yes Underground utilities Yes 17 Process areas No Overhead power lines No | 18. Lighting Yes Noise Yes 19° Electrical equipment Yes 10. Radiation No | 20. Tagout & lockout (mech/elec:) No | Part A6 Provide farther information if Yes to any of the above, oF as necessary 1. Approval of MS from CTJV & PTW from REC. : : F- Hecardous material fom potential oil spill by equipment. Refer to Appendix B of tho MS. ‘S/S/L1/12/13 — Necessary due to nature of operations 74/16 ~ Safe Berthing /Mooring coordinated with port by Marine Superintendent 1 HISES factor for safe completion & coordination of Marine & Transport ‘operations. 18/19 _ Night Shift Operations will require adequate lighting, oll electrical equipment to be inspected by competent electrician, 7 Note T Taentify any Material Safety Data Sheets in Part AT Note 2 Provide details of any third, [parties involved, e.g. scaffolders, electricians etc. PartA7 List the name of each attachment and the | number of pages pages — pages = pages EEE ree pages Tonal number of pages including this Safety Hazard Control Programme pages Part AS Review and approval _ “Aa Prepared Name Company Archirodon Position __ Signature f Date ‘ASb HSE review Name Seer Company _Archirodon Position Signature _ Date _13/06/2006 ‘Ate Approved Name Company _Archirodon, ape Construction Manager Signature ____ Date Part A9 This Safety Hazard Control Programme has ben commnnicated to and understood by all personnel associated with the task. Approved Name _Karol. Pioniazek ____ Company _Arehirodon Project Manager Signature Date _13/06/2006 Sheet 2 of 7 Document Ref. 0151-MS-01 Documsnt ref: CORP-GEN-12-F01 Rev.2 ay TOs E1ND-aHOO st wemNeCT £ Joc 18008 Lo aa a oF L 6 g L _ ee L L_] | eee Cs ¢ SRST ST TSH ATH Oy PT OTA oH HOT we HO HHO 04 TA SOP aA past vile cl La |b | morndinbe 29 Goumyoeny 2p sqesson ‘suonepnios vo doyspom BopoNary ws wouoo UEC. fq, wonwuypioop | © iy rle[ rie ado Shep UO pasn 9G [ILM WOUTBOS 7 SHOHENAIS Pieog Jodo Way Uy pauTEN yauuosied | 7 elel ele Tsai Bp Wo PSST o¢ [fa wOUTeSS ay AVOWERHS Pivot JNO WON tH POUINH JouoSd T Shaman La ays a ‘espa ae aamipayy of S9INSwIPA, [0.70 | qT Tai: - z Elz urd aL | Some aa re cla weutiosieg PIBOET JOAO THIN € ele pauostog “ay ay oy Ty Toe oTIOATEN pac Zo fouTOST pouTN | T d{ila O(N i 7 SaINSWO|AL [OXI O10}Oq ot ‘AST Je Sf FETAL LO OTLAL, samnswayAl TONED ex0saq SPIEZETT A39}US PUL WITH pawogriis Eee Faoondpabs OupTeTAL Ee 900z-90-E1 aC pakuga x porelaig pie youwossog ourMpA Jo WOHUTINGOH "TON Anan TO-SWEISTO Jou sHOUIOCG SUUASVSW TORLNOO UNV LNGWSSISSY MSTA ~ < NOLLOTS aurmvsBo1g ore prezey ATES WELSAS LNIEDVNVIN ALYWORUOD "AN ANOYD NOCOUHIAY AD YOETNID HOO if woumnood L Joy Rous ay ta eqn 2H) dad HON FRM UTES OF O8Opo BUP OM plelzielelel » sookojdugr “peoydop 04 TIP amnsodxe 1940] o5fOU _y8iy Supeoypm suBig ASH SsorqToM Yopem 2g * yea pute jag, povoadsur 0g tres Kou, owe wonoodsts Asad PAM AAT qs 83 € vlel{zirlyi ye ssouery ‘sappoet Suny “Bemgy mo Arse YA soonanrd BuPpIOM oF0s JO yuomnarmbar oxy TIM Teyuny PaUBOSIod jean || aq qe 3009 poadg “paordap 0g hus SH age “Pasm 24 TIA siayoef ayy panouddy “s08po oy} 07 9809 00} BUPYON |Z plelcleleleols tony wwaaand of ‘AyAn}ow Sp UE panto ousted Pe ‘pramdinbo amp Yoxv09 1t6 soy dovs 30 / pu WoUISUPE SERA[SHSTA "3 WORRAPATOD Jo WOUNHIN 10] BS HO PPLAONE aq fae) | mm yeni “suonmys JareAs pow “STEN PLA spopraoid 2° sore popes “Sywayg sores oAey TTA yatmoszed ny | ‘yshe ou sonpay! 0} So.MSLIFAL FOITCD | 6 eheets jaa SNIOPHOM (Gaia BAS TOT UPON) HNP ATCA OHA | S| € SOIOPHON i ‘yarouoo 07 smnsodxq | L € SoIOPTOM Feng S50H] E/T MEAPAT parser | T paSTAMTAE/OSIOPHON. “Sapo Say WISIN | “S € SaTOPHO NL : ce yeaa] SION | efzje\t THOMASH HON, parca] oagua KG Toalgo Sue /PHereY BUTT | eferele SURE TABE, SOTO PHO AN “TER "OST aap OTE SUAS pe ouUOSTAT JO MUHA) C elelzle SSIOBHOM sean won | T ae et sa ye a x perenne ae camevapy svar 920904 SDIWZTE AHS PE WIESEL FHESUTEAIS | ‘900T-90°E1 SPC pokegta aA powdotd song Jo woREIEMT "7 “ON ATANOW TOSAFTSTO Jou ToMMOOG SaINSVANE TOMINOD NY ANGHSSASSY NSPI~ NOLLORS | aunmesSorg joxuep paezepy Leyes esq omdum aqui = pa wd seOpOMT = Ek adam yonamsgns = 2a - ronda sTaBsqOR= 1g SopOOAHONTSSNSS srt ops nd pneu po sUy PIPED C1-NED"EIOO APSOAE TPO é WELLSAS LNINBOWNVN ELVBORLOS "AN JNOYD NOGOWH DEY HON 1OsE-LTNIO HOD fos wonatood L Jos 190NS poedun aan ga edu ages = pd yea THOPOU = Ea oodion jonas =z soudam 2ygezqonar= fq "S9pOD AHaunssosH TT | or 6 T “GTOHERTo Buipjem FaLmnp jomuosIsd pazjiowpaeen Kq ayqisseoo" 0g 10U! rs seats Sopa ‘Sbore Fugpjow rans poaouTas oq THI PHOT fqountry “Yay 1991100 YALA SOTBIOR pw SoAos ‘Seypjom tEA papraosd oq YIM SFSPIOA sposynn aq TEM su0pfom paouiopsadxe pure paysrenb ATU ‘aBeyeoy jenuarod “aiogy Ho AE pjoy o} JoyexoTe ayy WpeauTEptm past oa ITH Fowexoua8 amy £q past fro xp 50 Axoedeo %OST 10 ingoq y ‘Zopro BuBPOM poow wy pue pouresniow ANMSTOHENS “oqesouet £q papraosd ag ys saasod Azesodusay, “SOW srndowlte pe asodnd soy oyqzns Buger pire 25 pes “prepress won Ieee ‘01 9q [ILM Saqeo ITV ‘soueNsts9 stom! | 8 ‘BayAyryutopt poould aq yTLAs suBls paw parent 24 (eouymns aofod ONS ISHS] 1) PoHNG 04 THA. sayguc“posn oqo} ary stoNJSaKUO9 TeoINDa[s ZoopMO Yodosd TONER oud payeato 94 TM Seyqeo TTY “SuUIDENoT® | ‘poousnadeo Aq opr0 ays pu reuopezedo wy panera oa Tk A wou | ‘node te so 09 TM pony Sn} Soyqno pasoxo 10 Sumy ROT glelzlrlelrlel "nest aqetop 24 Ta 424 pasa 81008 SHOMOYE SHAM, BOAOT EA TE 100) seus0d pug ‘ofdyousd wy “HORiptido ofes # uf pauTeyayeia oq puie WORT UHC \ jon Ago ys guonudinbe pom good ry Eta I=NP Poe cossof2 Ayapes ‘S}00q 389 TBH ‘SOAOTS SULA og | L lee | c| [ov | |msuon smnno mt eatoant youuoszed yry “SyHOA goz01I00 ae amp WE Post oF TES yarruosied pootopradxe ATUO | | H aie BupOm sip OMA PoMOT}e 9 [TH TOUTOSIEG poutens MIO «qouuosted paonstiedyo pure pouren Aq pasonuont pre “paper Aqsnonimuos aq THM To OmMEAPAT/ATD JO Aqqenb pun) 9 ple late |e Le |» | noperade ramon somo us ot ‘ond paxooye 24 I Sasoy Ty “BIE yoau09/ason Jo Maas ayonbape amsts, ~ ~ : “SigeTRIAG 0q Tia ouTOSiad parley ryoA Kourafixourey “osama ojous pus SrOpEP 1ST Amp ayrus aye 6g porwan 9g TIE yapLore Tenaerog ‘powmentany Apsnsqo 29 TGS ‘Syajod zoysnur pure sezyed “79 Jo sTuzOd IV “ONS & ‘paw yoroy 8 yA S| yplelzir| rl ele papraoad paw yoxou! Amp fry Sapw94s oq THM ooxoydura YO spoyuemrapduny 99 THA XN TOOT senysy WNT, | oe La iva 1 Sai ‘a "yspar ou compart 07 SOINSEOpY FONLOD | | Jo worreprodstest 203 a ‘Gpanitypoy) Soyer Fo MoPeyTENSHY Z “ON SAROW WEILSAS LNAWHDYNVI ALYYOTUOO "AN ANOWD NOCOUTHIUY sassy odin owns PUD SIMU APIO CYNE HOO 179200 PPP é coy TOC END aUOO ‘fos mrowmood ondary amy — sa roedwr opqaroyon = pa Hovde aznsopowt = Ed yooduur yoUmsqns = Za ovdurE e1qessqown £ yogxeays Ta sSepoo TUOWUSSASSH STL ‘TOTTDASD Jo HSTAIaH 305 STIS WO POpIACHT 34 TH Braiqes es SayKjon9a|e “Oy svar papery ‘Syvorg Joyen ase yA yetruoszad TTY sqeqroye pre yssp ‘SuONUNS Tone PUB ‘SMES UIA «popyaord 2q, “power joa par sontariob Bunya arojaq porooeur 9g TH AOL “aHOTRTE? rnowodsmy Kued pin © asen ia sBuns ‘SOpMYS | Tener ‘sopon SurgrT Mv Bunt ino Aared yyw soonousd SurHOm aTeS Te ‘wrotmarqniban omy yyias xoMLUNN JOUUOSIE plelz| piri “GoRpuoo ofas w UT pouTeaIHTT 34 put LOFT auing AD gnbo paw 7 gsm yop pe sosin Avex 53009 0 BIH ‘SOAOTR BUHOM 09 THM SOM EIT | z riclzlelriely tr poxgoaus auuosted [TV “HON o}evouo uoHaNsSTe DU ow Pos! 28 TEN yoouosiad poouoyradxe AIO “afaeTTEAE | qj 3009 poadlg “pooydop 9g 11 SUE apr “Post 29 TAA syomoel apy peaouddy “sofipe orp 01 asofo oor BuppOm | ‘aot mosaad 0} Ayatie su uf paafoaut jouuoszed pee wourdibe emp Yorno9 TH $80 doys so pus uoeasyure ¥ alta lots [oN “semnaeaqy fONUOD Jaye TST “spar aus aompanl 07 sosNsEapY OCD 5 : ¢ € ra ‘SaITON wore we | € ett STAB SAIOP HOA 7 oslo Sipe / ez BURNT |e £ elt BOIOPPIOM H B}OIDTIOS OF amsodxg |Z € tit. TuoTT Mb E/SaIOPTON, “rajamanp "85s amp Ont TuRTUBS pu yeuuoRed Jo Suiiiea | 1 {ae stat Sos ‘sta ye 5] TUTAL 10 OLA, | gaunsvapy oro; a0yoq SPIEZNH APES pele IPTOOKT 5H ruts i : Soe wre 90oz-90-€1 RCL podvgta poredata among “O°H Je woRINAWHED *E “ON AUATOY TO-SMEISTO Jeu weuMDOCL SMANSVAW TOULNOD GNV INAWSSASSY ASNI~ NOLLOS aummresSorg yore} prezep AS prowssossy woody o;annunaaus plo sBGDUY PAMEEF] 21ND EHO APT yes a WATSAS LNTWADVNVIN AEVAOTEOD ‘AN ANOW NOTOWHTAV

You might also like