Gravel Road (800')
Gravel Road (800')
SUMMARY OF COST
1 ေက်ာက္ေရာေျမျဖင့္လမ္းခင္းျခင္း
လု ပ္င န္း 1 9,514,896 385,740 972,820 10,873,456
MATERIALS LIST
1 Earth Sud 162.00 10000 1620000.00
2 Crushed Rock (max.Size 1") Sud 20.45 85000 1738250.00
3 Sandy Soil Sud 13.64 10000 136400.00
4 River Shingle or Chaung Gravel(max.1") Sud 34.09 95000 3238550.00
5 Sand Sud 6.82 16000 109120.00
P.O.L forOperation
6 Diesel Gal 581.98 4200 2444316.00
7 Engine Oil Gal 8.73 20000 174600.00
8 Gear Oil Gal 1.31 16000 20960.00
9 Hydraulic Oil Gal 1.96 15000 29400.00
10 Grease Lb 1.65 2000 3300.00
Cost Of Materials 9514896.00 9514896
LABOUR LIST
1 Head Worker Nos 3.74 9500 35530.00
2 Worker Nos 12.34 7500 92550.00
3 Operator Nos 22.89 9500 217455.00
4 Helper Nos 7.31 5500 40205.00
Cost Of Labours 385740.00 385740
MACHINE LIST
1 Compactor Hr. 2.95 30000 88500.00
2 Grader Hr. 13.36 30000 400800.00
3 Smooth Wheel Roller (8-10 Ton) Hr. 9.56 35000 334600.00
4 Tipper Hr. 4.89 12000 58680.00
5 Water Bowzer Hr. 10.68 8000 85440.00
6 Water Pump Hr. 2.40 2000 4800.00
Cost Of Machine 972820.00 972820
4
Name of Owner - အမွတ္(၅) ဓာတ္ေျမၾသဇာစက္ံ (ကန္ၾကီးေထာင့္)
5
0.00
6
7
Name of Owner - အမွတ္(၅) ဓာတ္ေျမၾသဇာစက္ံ (ကန္ၾကီးေထာင့္)
1 Construction of Subgrade
Using Transported soil Cft 12000.00 214.96 Cft 2579493.00
8
Name of Owner - အမွတ္(၅) ဓာတ္ေျမၾသဇာစက္ံ (ကန္ၾကီးေထာင့္)
Name of Project -ေက်ာက္ေရာေျမျဖင့္လမ္းခင္းျခင္းလု ပ္င န္း (800'x15'x6")
BUILDER'S ESTIMATE
1 Construction of Subgrade
Using Transported soil 12000.00 Cft
Material
Earth 162.00 Sud 10000 Sud 1620000.00
P.O.L forOperation
Diesel 71.59 Gal 4200 Gal 300678.00
Engine Oil 1.07 Gal 20000 Gal 21400.00
Gear Oil 0.16 Gal 16000 Gal 2560.00
Hydraulic Oil 0.24 Gal 15000 Gal 3600.00
Grease 0.20 Lb 2000 Lb 400.00
1948638.00
Machine
Compactor 2.95 Hr. 30000 Hr. 88500.00
Grader 5.68 Hr. 30000 Hr. 170400.00
Smooth Wheel Roller (8-10 Ton) 4.77 Hr. 35000 Hr. 166950.00
Tipper 4.89 Hr. 12000 Hr. 58680.00
Water Bowzer 5.68 Hr. 8000 Hr. 45440.00
Water Pump 2.39 Hr. 2000 Hr. 4780.00
534750.00
Labour
Head Worker 1.14 Nos 9500 Nos 10830.00
Worker 4.55 Nos 7500 Nos 34125.00
Operator 3.41 Nos 9500 Nos 32395.00
Helper 3.41 Nos 5500 Nos 18755.00
96105.00 2579493.00
P.O.L forOperation
9
Name of Owner - အမွတ္(၅) ဓာတ္ေျမၾသဇာစက္ံ (ကန္ၾကီးေထာင့္)
Name of Project -ေက်ာက္ေရာေျမျဖင့္လမ္းခင္းျခင္းလု ပ္င န္း (800'x15'x6")
BUILDER'S ESTIMATE
10873456
10
Name of Owner - အမွတ္(၅) ဓာတ္ေျမၾသဇာစက္ံ (ကန္ၾကီးေထာင့္)
Name of Project -ေက်ာက္ေရာေျမျဖင့္လမ္းခင္းျခင္းလု ပ္င န္း (800'x15'x6")
DETAIL MEASUREMENT
Measurement
No Particular No Dedu; Content Unit
L B H
1 Construction of Subgrade
Using Transported soil
Road 1 1 800'- 0'' 15'- 0'' 1'- 0'' 12000.00 Cft
12000.00 Cft
11
Name of Project -ေက်ာက္ေရာေျမျဖင့္လမ္းခင္းျခင္းလု ပ္င န္း (800'x15'x6")
DETAIL MEASUREMENT
Measurement
No Particular No Dedu; Content Unit
L B H
12
Name of Project -ေက်ာက္ေရာေျမျဖင့္လမ္းခင္းျခင္းလု ပ္င န္း (800'x15'x6")
DETAIL MEASUREMENT
Measurement
No Particular No Dedu; Content Unit
L B H
13
Name of Project -ေက်ာက္ေရာေျမျဖင့္လမ္းခင္းျခင္းလု ပ္င န္း (800'x15'x6")
DETAIL MEASUREMENT
Measurement
No Particular No Dedu; Content Unit
L B H
14