NAME OF PROJECT : Construction of Flood Control Structure along Bislak River, Sitio, Magabobo, Brgy.
LOCATION : Salsalamagui, Vintar, Ilocos Norte
SOURCE OF FUND : GAA 2020
APPRO./CONTRACT COST : PHP 20,427,120.50
DATE STARTED : September 29, 2020
DATE COMPLETED :
PROJECT INSPECTOR : RODRIGO F. AGUSTIN
PROJECT ENGINEER : MARK LOUIE B. GALIZA
CONTRACTOR : DJCM Construction Corporation
We the undersigned members of the Inspectorate Team, conducted a joint inspection of the above-stated
project and found the same to be satisfactorily completed/ongoing in accordance with the Plans and Specifications
of the Contract.
-
REMARKS 11,866,302.97