Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


st
ILOCOS NORTE 1
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE I
Cavit, Laoag City, Ilocos Norte

CERTIFICATION OF FIRST PARTIAL PAYMENT

Date

NAME OF PROJECT : Construction of Flood Control Structure along Bislak River, Sitio, Magabobo, Brgy.
LOCATION : Salsalamagui, Vintar, Ilocos Norte
SOURCE OF FUND : GAA 2020
APPRO./CONTRACT COST : PHP 20,427,120.50
DATE STARTED : September 29, 2020
DATE COMPLETED :
PROJECT INSPECTOR : RODRIGO F. AGUSTIN
PROJECT ENGINEER : MARK LOUIE B. GALIZA
CONTRACTOR : DJCM Construction Corporation

We the undersigned members of the Inspectorate Team, conducted a joint inspection of the above-stated
project and found the same to be satisfactorily completed/ongoing in accordance with the Plans and Specifications
of the Contract.

ITEM DESCRIPTION OF WORK QUANTITY UNIT COST TOTAL


-
A.1.1(8) Provision of Field Office for the Engineer 4.00 7,475.56 29,902.24
B.5 Project Billboard/Signboard - 2,526.03 -
B.7 Occupational Safety and Health Program 4.00 19,265.88 77,063.52
B.9 Mobilization & Demobilization - 55,311.10 -
B.15(1) Detour/Access Road - 90,717.18 -
1700(2) Clearing and Grubbing - 110,381.70 -
1704(1) Embankment 3,730.25 338.10 1,261,197.53
1712 (2) Concrete Slope Protection 62.43 5,705.56 356,169.58
1713(1) Rubble Concrete 354.00 3,115.43 1,102,862.22
1717(2)a Sheet Pile 3,762.00 2,402.74 9,039,107.88

-
REMARKS 11,866,302.97

ANGELITO A. DIAN ROBERT G. RABAGO


Representative Representative
Construction Section Maintenance Section

LEON C. DAQUIOAG ERWYN R. ALOG


Representative Representative
Planning & Design Section Quality Assurance and Hydrology Section