QUANTITY COMPUTATION SHEET

VARIATION ORDER NO. 1


ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL :
STATION :
PAY ITEM : CONCRETE DEMOLITION

SKETCH COMPUTATION QTY. UNIT

5.00 Vol = 5.00 X 3.50 X 0.15 2.63 cu.m.


5
3.50

t= 0.15

COMPUTED BY: MARIVIC B. ZAMORANOS


ENGINEER B
SHEET NO. TOTAL QUANTITY
CONCURRED BY: KADER S. MODAPIL 1 2.63
P.E. / CONTRACTOR SIDE 1 UNIT cu.m

EVALUATED BY:

LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL :
STATION :
PAY ITEM : 3000 psi Plain Concrete

SKETCH COMPUTATION QTY. UNIT

5.00 Vol = 5.00 X 3.50 X 0.15 2.63 cu.m.


5
3.50

t= 0.15

COMPUTED BY: MARIVIC B. ZAMORANOS Sub- total


ENGINEER B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 1 TOTAL QUANTITY 2.63 2.63
P.E. / CONTRACTOR SIDE 1 UNIT cu.m.

EVALUATED BY:

LIA M. MAYLON
Engineer A
INSPECTION AND INVESTIGATION SUMMARY
VARIATION ORDER NO.1

Contract No. : NIAREG9-03102020-676 LINEPROGRAMS-EXTENSION Contract Description: CONSTRUCTION OF CANALIZATION & CANAL STRUCTURES
Contractor : LAKEWOOD CONSTRUCTION COMPANY

Name of Project : LOWER SIBUGUEY II RIS EXTENSION PROJECT


CY2016 REMAINING WORKS Date of Astake Survey :
Location of Project : SIAY, ZAMBOANGA SIBUGAY

Attachments:
Written Notice of the Contractor Variation Order No. 01,Plan & Profile if change in Stationing & Grade
Justifications Geotagged Pictures
Variation Order No. 01 N/A Variation Order No. 01, PERT/CPM Network Diagram
Variation Order No. 01, Masterlist of Work Items N/A Variation Order No. 01, Detailed Computation of Contract Time
Computation of Quantities N/A Logbook
Detailed Estimate of Unit Cost Joint Resolution of Salinding Barangay Officials
Plans and or Revised Plans
Variation Order No. 01 General Layout, if change in location

Prepared: Checked: Recommended: Submitted:

RODEL J. YUNTING JADE J. BAGTASOS MA. GERTRUDES P. GANIA GIRLIE M. DETALLA


Project In-charge Senior Engineer A/CMU Supervising Engineer A Acting Division Manager
Republic of the Philippines
National Irrigation Administration
Region IX
Zamboanga Sibugay Irrigation Management Office

JUSTIFICATIONS
Proposed Variation Order No. 01
NIAREG9-03102020-676 LINEPROGRAMS-EXTENSION

ORIGINAL (FROM) PROPOSED VARIATION NATURE OF VARIATION REMARKS / REASONS


(AS PER BID) ORDER 01

TEMPORARY WORKS, TEMPORARY WORKS,


CONSTRUCTION AND CONSTRUCTION AND
INSTALLATION OF INSTALLATION OF
I BILLBOARD, CONSTRUCTION BILLBOARD, CONSTRUCTION NO CHANGES
PLANT, MOBILIZATION OF PLANT, MOBILIZATION OF
CONSTRUCTION EQUIPMENT CONSTRUCTION EQUIPMENT
& DEMOBILIZATION & DEMOBILIZATION

II CANALIZATION CONDITION, APPROVED CROSS-


Common Excavation Mech. Common Excavation Mech.
INCREASED OF QUANTITY SECTION AND RECOMPUTATION
(569.82 cu.m) (571.89 cu.m) OF EARTHWORK QUANTITIES

Common Backfill Mech. BASED ON ACTUAL FIELD


Common Backfill Mech.
(496.23 INCREASED OF QUANTITY CONDITION, APPROVED CROSS-
(498.31 cu.m) SECTION AND RECOMPUTATION
cu.m)
OF EARTHWORK QUANTITIES
EMBANKMENT
II.a CONSTRUCTION AND
COMPACTION
BASED ON ACTUAL FIELD
CONDITION (DECREASED
VOLUME IS DUE TO ADDITIONAL
CANAL STRUCTURE), APPROVED
Haul Borrow Haul Borrow CROSS-SECTION AND
(14,245.07 (13,850.35 DECREASED OF QUANTITY RECOMPUTATION OF
cu.m) cu.m) EARTHWORK QUANTITIES
REINFORCED CONCRETE PILE REINFORCED CONCRETE BASED ON ACTUAL FIELD
(0.20m x 0.20m x 6.0m) PILE (0.20m x 0.20m x 6.0m) CONDITION, APPROVED CROSS-
INCREASED OF QUANTITY SECTION AND RECOMPUTATION
(2122.00 ln.m) (2,160.00 ln.m) OF CONCRETE
CONDITION, QUANTITIES
APPROVED CROSS-
Gravel Bedding
Gravel Bedding
(73.60 INCREASED OF QUANTITY SECTION AND RECOMPUTATION
(69.56 cu.m) OF EARTHWORK QUANTITIES
cu.m)
HDPE 355mm Dia. w/ HDPE 355mm Dia. w/
Accessories Accessories NO CHANGES
(112 pcs) (112 pcs)

CONCRETE

Class A Concrete (3000 psi) PLAIN Class A Concrete (3000 psi) PLAIN BASED ON ACTUAL FIELD
CONCRETE CONCRETE DECREASED OF QUANTITY CONDITION, APPROVED CROSS-
(4.03 cu.m) (3.42 cu.m) SECTION AND RECOMPUTATION
OF CONCRETE QUANTITIES
BASED ON ACTUAL FIELD
RSB (Reinforcing Steel Bars) CONDITION, APPROVED PLAN
RSB (Reinforcing Steel Bars)
(778.16 DECREASED OF QUANTITY AND CROSS-SECTION AND
(906.83 kgs) RECOMPUTATION OF
kgs)
REINFORCING BAR QUANTITIES
III CANAL STRUCTURES

BASED ON ACTUAL FIELD


Structure Excavation (Manual) Structure Excavation (Manual) CONDITION (ADDITIONAL CANAL
(32.65 (51.52 INCREASED OF QUANTITY STRUCTURE), APPROVED CROSS-
cu.m) cu.m) SECTION AND RECOMPUTATION
OF EARTHWORK QUANTITIES

BASED ON ACTUAL FIELD


Structure Backfill (Manual) CONDITION (ADDITIONAL CANAL
Structure Backfill (Manual)
DECREASED OF QUANTITY STUCTURE), APPROVED CROSS-
(49.66 cu.m)
(34.29 cu.m) SECTION AND RECOMPUTATION
OF EARTHWORK QUANTITIES
BASED ON ACTUAL FIELD
Gravel Bedding CONDITION (ADDITIONAL CANAL
Gravel Bedding
INCREASED OF QUANTITY STUCTURE), APPROVED CROSS-
(4.56 cu.m)
(11.03 cu.m) SECTION AND RECOMPUTATION
OF EARTHWORK QUANTITIES

BASED ON ACTUAL FIELD


Boulder Bedding CONDITION (ADDITIONAL CANAL
Boulder Bedding
(38.22 INCREASED OF QUANTITY STUCTURE), APPROVED CROSS-
(18.24 cu.m)
cu.m) SECTION AND RECOMPUTATION
OF EARTHWORK QUANTITIES
HDPE 355mm Dia. w/ Accessories HDPE 355mm Dia. w/ Accessories
(8.00 (8.00 NO CHANGES
pcs) pcs)
CONCRETE

BASED ON ACTUAL FIELD


Class A Concrete (3000 psi) PLAIN CONDITION(ADDITIONAL CANAL
Class A Concrete (3000 psi) PLAIN
CONCRETE INCREASED OF QUANTITY STUCTURE), APPROVED CROSS-
CONCRETE (16.69 cu.m)
(1.81 cu.m) SECTION AND RECOMPUTATION
OF CONCRETE QUANTITIES

BASED ON ACTUAL FIELD


RSB (Reinforcing Steel Bars) CONDITION(ADDITIONAL CANAL
RSB (Reinforcing Steel Bars)
(705.93 INCREASED OF QUANTITY STRUCTURE), APPROVED PLAN
(70.22 kgs)
kgs) AND CROSS-SECTION AND
RECOMPUTATION OF
REINFORCING BAR QUANTITIES

Prepared: Checked: Recommended: Submitted:

RODEL J. YUNTING JADE J. BAGTASOS MA. GERTRUDES P. GANIA GIRLIE M. DETALLA


Project In-charge Senior Engineer A /CMU Supervising Engineer A Acting Division Manager
MASTERLIST OF WORK ITEM
ILISAN SIP CY 2019
Alicia, Zamboanga Sibugay
CONTRACT NO. NIAREG9-11092019-599

Common Side Borrow Rock Structure Structure Structure Structure Concrete


STATIONING Length UNIT 3000 Psi 3000 Psi Excavation RCP Excavation Backfill Excavation Backfill
2400 Psi Reinforced Reinforced (cu.m) Excavation Demolition 3000 Plain
ITEM OF WORK Name of Canal Reinforced ( cu. m. ) ( cu.m. ) ( cu.m. ) ( cu.m. ) ( cu.m. ) Concrete
Concrete Concrete Concrete (Minor)
(Major) (Minor)
Inlet Outlet ( m. ) Ls. Manual Manual 61 cm dia. Mech. Mech. Mech. Manual Manual (cu.m.)

1 TEMP. WORKS, CONSTRUCTION PLANT, MOBILIZATION 1.00


OF CONSTRUCTION EQUIPMENT & DEMOBILIZATION

Sub - total = 1.00


2 CANALIZATION
Bench Flume Main Canal 2+664.00 2+774.00 110.00 28.67 5.92 86.33
Bench Flume Main Canal 2+844.00 3+104.00 260.00 54.32 3.80 387.65
Bench Flume Main Canal 3+104.00 3+164.00 60.00 12.56 5.00 12.60
Bench Flume Main Canal 3+164.00 3+324.00 160.00 28.25 2.60 126.50
Bench Flume Main Canal 3+324.00 3+464.00 140.00 29.26 26.70 116.60
Sub - total = 730.00 153.06 44.02 729.68

3 CANAL STRUCTURES
Prop. Combination Cut & Cover and T.O.( LS) Main Canal 2 + 774 2 + 844 70.00 36.27 0.19 48.20 217.43 218.28 2.63 2.63
Prop. Check & Turn Out Ls Main Canal 3 + 104 0.37 0.40 0.48
Prop. Drainage Crossing Main Canal 3 + 144 - 3.00 2.98 Err:509
Prop. Check & Turn Out Ls Main Canal 3 + 164 0.65 2.14 1.26
Prop. Overchute Main Canal 3 + 204 1.44 3.52 2.08
Prop. Drainage Crossing Main Canal 3 + 324 #REF! 2.00 #REF! #REF!

Prop. Elev. Flume Main Canal 3 + 464 3 + 580 116.00 36.08 18.98 69.36 21.42

Sub - total = 186.00 72.35 #REF! 5.00 67.18 286.79 239.70 #REF! Err:509 2.63 2.63
916.00 1.00 153.06 72.35 #REF! 44.02 729.68 5.00 67.18
TOTAL 286.79 239.70 #REF! Err:509 2.63 2.63

Prepared by: Concurred by: Checked by : Reviewed by: Approved by:

MARIVIC B. ZAMORANOS DEXTER W. TSANG JADE J. BAGTASOS MARIA GERTRUDES P. GANIA GIRLIE M. DETALLA
Engineer B Contractor Senior Engineer A Supervising Engineer A Acting Division Manager
QUANTITY COMPUTATION SHEET
ILISAN SIP
Alicia, Zamboanga Sibugay
CONTRACT NO. NIAREG9-01222019-599
CONTRACTOR : LONG ISLAND BUILDERS AND CONSTRUCTION
NAME OF STRUCTURE/CANAL : ELEVATED FLUME
STATION : 3 + 464 3 + 580
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT


SIDING 1- inlet
0.87
V= L x W x t x 2 sides
0.5 V= 0.87 0.5 0.13 2.00
0.11
t= 0.13 0.11 cu.m.
SIDING - outlet
0.92
V= L x W x t
0.51
Vol = 0.92 0.51 0.13 2
t= 0.13 0.12 0.12 cu.m.
FLUME VOLUME = AREA(FLUME) x LENGTH

AREAS
A. 0.14 x 0.45 0.06
, 0.14 0.14 B. 0.14 x 0.45 0.06
C. 0.12 x 0.63 0.08
0.45 0.20
0.45 A B
VOLUME= 0.20 x 113.70
, 0.12 C = 22.74
0.35
L=113.70 m. 22.74 cu.m.
FLUME SEAT
0.83 Area = 0.83 x 0.40
0.63 = 0.33

0.1 Area rec.= 0.63 x 0.10


= 0.06
0.15 Area tri.= 0.15 0.29 2.00 0.50
0.40 = 0.04
0.15
, 0.29 Total Area = 0.33 - 0.11
0.25 = 0.23
VOLUME= total area x thickness x no. of flume seat
no. of flume seat = 20 pcs. = 0.23 0.25 20.00
thickness =0.25 1.09 cu.m.
FOOTWALK
0.35 VOL = length x width x thickness
Vol = 0.35 0.2 0.10 39
0.2 = 0.273

t = 0.10 0.27 cu.m.


COMPUTED BY: MARIVIC B. ZAMORANOS
SUB-TOTAL 24.33
ENGINEER B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 1
P.E. / CONTRACTOR SIDE 2

EVALUATED BY:
LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
ILISAN SIP
Alicia, Zamboanga Sibugay
CONTRACT NO. NIAREG9-01222019-599
CONTRACTOR : LONG ISLAND BUILDERS AND CONSTRUCTION
NAME OF STRUCTURE/CANAL : ELEVATED FLUME
STATION : 3 + 464 3 + 580
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT


COLUMN Total height= 1.38+1.98+2.05+2.08+2.08+2.09+
0.2 2.12+2.13+2.14+2.14+2.16+2.16+2.10+
2.15+2.15+2.14+1.91+1.90+1.90+0.50
0.2 39.26
Volume= Length x width x height
H Vol= 0.2 0.2 39.26
= 1.57

Total Height= 35.32 1.57 cu.m.


Abutment Total height= 0.50 + 0.50
0.25 = 1
0.63
Volume= Length x width x height
H Vol= 0.25 0.63 1
= 0.16
Total Height= 1.00 0.16 cu.m.
FOOTING 1
1.20
1.40 Volume= Length x width x Thickness x No. footing
Vol= 1.20 1.40 0.30 18
= 9.07
0.30
9.07 cu.m.
Footing of Abutment
0.95
1.40 Volume= Length x width x Thickness x No. footing
Vol= 0.95 1.40 0.30 2
= 0.80
0.30
0.80 cu.m.
FLOORING - inlet
0.87
0.63 VOL=1/2 x (X1 + X2) x Length(thickness)
0.66
Vol = 0.5 1.29 0.87 0.13
0.07
t= 0.13 0.07 cu.m.
FLOORING - outlet
0.92
0.66 VOL=1/2 x (X1 + X2) x Length(thickness)
0.63
Vol = 0.5 1.29 0.92 0.13
t= 0.13 0.08 0.08 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 11.75 cu.m.


ENGINEER B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 2 36.08
P.E. / CONTRACTOR SIDE 2

EVALUATED BY:
LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
ILISAN SIP
Alicia, Zamboanga Sibugay
CONTRACT NO. NIAREG9-01222019-599
CONTRACTOR : LONG ISLAND BUILDERS AND CONSTRUCTION
NAME OF STRUCTURE/CANAL : ELEVATED FLUME
STATION : 3 + 464 3 + 580
PAY ITEM : 3000 psi Reinforced Concrete
SKETCH COMPUTATION QTY. UNIT
TURN OUT
COW Area = Area whole - Area shaded
1.05
0.25 AREA= 1.05 x 0.65
= 0.68
0.25
0.40 Area sq. 0.25 x 0.25
0.65 = 0.06
Area tri. 0.50 0.25 0.25 2.00
0.25 = 0.06
Area = Area whole - (Area sq. + Area tri.)
, 0.25 Total Area= 0.68 - 0.13
= 0.56
Vol.= 0.56 x 0.13
t = 0.13 = 0.07 x 4.00 0.29 cu.m.
FILLET V = Area x length
0.15 Area= 0.50 0.15 0.15
, 0.15 = 0.01
Vol.= 0.01 0.51 4.00
L=0.51 m. 0.02 cu.m.
FLOORING
0.55 V = length x width x thickness
Area= 0.55 0.51 0.13 4.00
0.51 = 0.15
t = 0.13 0.15 cu.m.
SIDING 1 : SECTION E-E
0.30 VOL = length x width x thickness
Vol = 0.30 0.4 0.13 4.00
0.40 = 0.06
0.06 cu.m.
SIDING 1 : SECTION G-G
0.30 VOL = length x width x thickness
Vol = 0.30 0.41 0.13 4.00
0.41 = 0.06
0.06 cu.m.
SIDING 2: SECTION E-E
VOL=1/2 x (X1 + X2) x Length(thickness)
0.40
0.25 Vol = 0.5 0.65 0.25 0.13
= 0.01
0.25
TOTAL VOL.= 0.01 x 4.00 0.04 cu.m.
SIDING 2: SECTION G-G
VOL=1/2 x (X1 + X2) x Length(thickness)
0.41
0.25 Vol = 0.5 0.66 0.25 0.13
= 0.01
0.25
t = 0.13 TOTAL VOL.= 0.01 x 4.00 0.11 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 0.73 cu.m.


ENGINEER B
SHEET NO.
EVALUATED BY: TOTAL QUANTITY 0.73
LIA M. MAYLON
Engineer A
CONCURRED BY: KADER S. MODAPIL 1 TOTAL QUANTITY 0.73
P.E. / CONTRACTOR SIDE 1

EVALUATED BY:
LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
ILISAN SIP
Alicia, Zamboanga Sibugay
CONTRACT NO. NIAREG9-01222019-599
CONTRACTOR : LONG ISLAND BUILDERS AND CONSTRUCTION
NAME OF STRUCTURE/CANAL : ELEVATED FLUME
STATION : 3 + 464 3 + 580
PAY ITEM : STRUCTURE/ROCK EXCAVATION/BACKFILL

SKETCH COMPUTATION

w = 2.00 m.
STRUCTURE EXCAVATION
Hatched Area (RED) = 34.68 sq.m.
Vol. = 34.68 x 2.00 = 69.36 cu.m.

ROCK EXCAVATION
Hatched Area (YELLOW)= 9.49 sq.m. Vol. = 9.49 x 2.00 = 18.98 cu.m.

STRUCTURE BACKFILL
Hatched Area = 10.71 sq.m.
w = 2.00
Vol. = 10.71 x 2.00 = 21.42 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total cu.m.


ENGINEER B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 1 TOTAL QUANTITY
P.E. / CONTRACTOR SIDE 1

EVALUATED BY:
LIA M. MAYLON
Engineer A
Project Title: Ilisan SIP (Buffer)
Location : Alicia, Zamboanga Sibugay
CLASS "A" CONCRETE (3000 PSI) PLAIN
1. Fabrication, Placing & Dismantling of Forms
Output: 3.50 cu.m/day
LABOR COMPOSITION

Personnel Wages
1 Carpenters 612.77
1 - Laborers 296.00
TOTAL 908.77
Labor Cost:
Wages : 908.77 /day P 259.65 /cu.m
3.50 cu.m/day

2. Concreting & Curing: with one - Bagger Mixer


Output: 3.50 cu.m/day
LABOR COMPOSITION
Personnel Wages
1 - Const. Foreman 784.31
2 - Mason 1,225.54
8 - Laborers 2,368.00
TOTAL 4,377.85
Labor Cost:
Wages : 4,377.85 /day P 1,250.81 /cu.m
3.50 cu.m/day
Equipment Rental
Utilized: 1 Bagger Concrete Mixer
Capacity: 3.50 cu.m./day
Rental: 1,376.00 /day
1,376.00 /day P 393.14 /cu.m
3.50 cu.m./day

SUMMARY

Wages P 1,510.46
Equipment Rental P 393.14
TOTAL P 1,903.60 /cu.m

Breakdown of 3000 psi plain concrete

ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL SUNDRIES
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
Cement 9.00 bags 0.00 0.00 346.18 3,115.62
Sand 0.45 cu.m. 0.00 0.00 1390.12 625.55
Gravel 0.90 cu.m. 0.00 0.00 1489.67 1,340.70
Form Lumber 25.00 bd.ft 0.00 0.00 43.78 1,094.50
Plywood 1.25 sheet 0.00 0.00 1121.81 1,402.26
CWN 1.00 kgs. 0.00 0.00 90.75 181.51

Labor Cost 1,510.46 393.14

Total 1 1,510.46 393.14 7,760.15 0.00 0.00


Use P 9,663.75 /cu.m

ESTIMATED DIRECT COST


9,663.75 /cu.m.
INDIRECT COST
OCM 15% OF EDC 1,449.56 /cu.m.
PROFIT 10% OF EDC 966.37 /cu.m.
VAT 5% OF (EDC, OCM & PROFIT 483.18 /cu.m.
TOTAL COST 12,562.86 /cu.m.
Project Tiltle : ILISAN SIP (Buffer)
Location: Alicia, Zamboanga Sibugay
DERIVATION OF UNIT COST

Concrete Demolition

Output: 0.50 cu.m/day

Wages 409.09 /day 818.18 /cu.m


0.50 cu.m/day
ESTIMATED DIRECT COST = 818.18 /cu.m.

INDIRECT COST
OCM 15% OF EDC 122.73 /cu.m.
PROFIT 10% OF EDC 81.82 /cu.m.
VAT 5% OF (EDC, OCM & PROFIT) 40.91 /cu.m.
TOTAL COST 1,063.63 /cu.m.

Prepared by: Concurred by: Checked by:

MARIVIC B. ZAMORANOS KADER S. MODAPIL MA. GERTRUDES P. GANIA


Engineer B P.E./Contractor Side Supervising Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDERS & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Elevated Flume/MAIN CANAL
STATION : 2 + 604 - 2 + 39
PAY ITEM : 3000 psi Reinforced Concrete
SKETCH COMPUTATION QTY. UNIT
SIDING - outlet
1.3
Vol = Area x t x 2 sides
0.61 Vol = 0.79 0.13 2.00
Vol = 0.21

t= 0.13 0.21 cu.m.


FLOORING- outlet
1.3
V = Area x t
0.68 Vol = 0.5 1.54 1.30 0.13
0.86 Vol = 0.13

t= 0.13 0.13 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 0.34 cu.m.


Engineer B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 1
P.E. CONTRACTOR - SIDE 3

EVALUATED BYl
MA. GERTRUDES P. GANIA
Supervising Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDERS & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Elevated Flume/MAIN CANAL
STATION : 2 + 604 - 2 + 39
PAY ITEM : 3000 psi Reinforced Concrete
COLUMN Total height = (2.85+2.80+2.75+2.78+2.08+1.44)
0.25
14.70
0.25
Volume= Length x width x height
H Vol= 0.25 0.25 14.70
Vol= 0.92

Total Height= 14.70 0.92 cu.m.


FOOTING
1.60

1.40 Volume= Length x width x Thickness x no. of footing


Vol = 1.60 1.40 0.40 6
Vol = 5.38
0.40

5.38 cu.m.
ABUTMENT 1 Total Height = (0.50)
0.68 = 0.50
Vol=Area x H x no. of abutment
H
0.25 Vol = 0.25 0.25 0.50
Vol = 0.03
0.03 cu.m.
0.95
0.68 *
VOL=Area x Length(thickness) x no. of footing

0.4 Vol = 0.646 0.40 1


Vol = 0.26
0.26 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 6.59 cu.m.


Engineer B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 2 TOTAL QUANTITY
P.E. CONTRACTOR - SIDE 3

EVALUATED BYl
MA. GERTRUDES P. GANIA
Supervising Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDERS & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Elevated Flume/MAIN CANAL
STATION : 2 + 604 - 2 + 39
PAY ITEM : 3000 psi Reinforced Concrete
SKETCH COMPUTATION QTY. UNIT
FLUME Vol = Area(Flume) x Length

AREAS
A. 0.14 x 0.50 0.07
0.14 0.14 B. 0.14 x 0.50 0.07
C. 0.12 x 0.68 0.08
0.50 0.22
0.50 A B

Vol = 0.22 x 42.70


C
0.12 Vol= 9.39
0.40
L=42.70m 9.39 cu.m.
FLUME SEAT
0.88 Area = 0.88 x 0.40
0.68 = 0.35

0.10 Area rec.= 0.68 x 0.10


= 0.07
0.15 Area tri.= 0.15 0.32 2.00 0.50
0.40 = 0.05
0.15
0.315 Total Area = 0.35 - 0.12
0.25 = 0.24
Vol = total area x thickness x no. of flume seat
no. of flume seat = 6 pcs. Vol = 0.24 0.25 6
thickness =0.25 Vol = 0.36 0.36 cu.m.
FOOTWALK
0.68 Vol = Area x thickness x no. foot walk
no.of foot walk=14 Vol = 0.68 0.20 0.10 16
0.2 Vol = 0.218

t = 0.10 0.22 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 9.97 cu.m.


Engineer B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 3 16.90 cu.m.
P.E. CONTRACTOR - SIDE 3

EVALUATED BYl
MA. GERTRUDES P. GANIA
Supervising Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Elevated Flume/MAIN CANAL
STATION : 2 + 604 - 2 + 39
PAY ITEM : STRUCTURE/ROCK EXCAVATION & STRUCTURE BACKFILL
SKETCH

STRUCTURE BACKFILL
Hatched Area = 21.54 sq.m.
W = 2.00 m.
Vol .= 21.54 x 2.00 = 49.02 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS


Engineer B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 1
P.E. CONTRACTOR - SIDE 1

EVALUATED BYl
MA. GERTRUDES P. GANIA
Supervising Engineer A
Republika ng Pilipinas
National Irrigation Administration
(Pambansang Pangasiwaan ng Patubig)
Region IX
Office Address: DA, RFO IX Research Division Compound ZAMBOANGA SIBUGAY IRRIGATION MANAGEMENT OFFICE
Sanito, Ipil, Zamboanga Sibugay, Philippines Smart Mobile No. : 09985660134
Email Address:niazambosibugaysvisimo@yahoo.com Globe Mobile No. : 09177052856
TIN: 000-916-415-151

VARIATION ORDER NO. 01


Name of Project: LOWER SIBUGUEY II RIS EXTENSION PROJECT CY2016 REMAINING WORKS PACKAGE-3
Location: SIAY, ZAMBOANGA SIBUGAY
Contract No.: NIAREG9-03102020-676
Date:

TO: JOSE CABARAL TIU, LAKEWOOD CONSTRUCTION COMPANY


You are hereby directed to make the herein changes for the PLANS and SPECIFICATIONS, or do the following described work included in the PLANS and
SPECIFICATIONS.

DESCRIPTION OF THE WORK TO BE DONE: Construction of Canalization & Canal Structures


REASONS FOR CHANGE: The change was made based on actual field condition and additional canal structures as per request by the Sangguniang Barangay.

CHANGES REQUESTED BY: Engineering and Design Section

Work to be performed at contract price: Php 21,896,734.46

ITEMIZED QUANTITIES AND COST REVISION ON REVERSE SIDE OF THIS SHEET

We, the undersigned contractors have given due consideration to Difference in cost this Change: Php 3,063.48
the change proposed and hereby agree, if this proposal is approved, we will Net Cost of Previous Changes: Php 21,896,734.46
provide all equipments, furnish all materials except as may otherwise be noted Original Contract Amount: Php 21,899,797.94
above and perform any all services necessary for the prices shown on the Estimated Revised Contract Amount: Php 21,896,734.46
reverse side of this sheet. By reason of this proposed change 0 days
Contract time will be allowed

ACCEPTED BY: JOSE CABARAL TIU Prepared by: RODEL J. YUNTING


Contractor Supervising Engineer A
Date:

Checked by: JADE J. BAGTASOS Recommending for Approval: MARIA GERTRUDES P. GANIA
Senior Engineer A Supervising Engineer A

Approved by:

GIRLIE M. DETALLA
Acting Division Manager
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : BENCHFLUME / MC
STATION : STA. 2+664.00 - STA 2+774
PAY ITEM : 3000 PSI RC
LENGTH (L) : 110 meters

SKETCH COMPUTATION QTY. UNIT


#Ftwalks= (L/5) + 1 = 110/5 + 1 = 23 pcs.
B = 0.60 m.
Dc = 0.60 m. L2= 23 (0.20) = 4.60 m.
L3= L - L2 = 105.40 m.

0.12 0.12 VOLUME (Sides) = (Dc+0.13)*0.12*2*L3


Vs = (0.60 + 0.13) * 0.12 * 2 * 105.40 18.47 cu.m.
Dc
0.13 m.
B

VOLUME (Base) = B * L * 0.13


Vb = 0.60 * 110.0 * 0.13 8.58 cu.m.
B

B VOLUME (Footwalk)=B*0.20*0.10*#Ftwalks
0.10
Vf= 0.60 *0.20*0.10* 23 0.28 cu.m.

0.20 m.

VOLUME(Column) = (Dc+0.13)*0.20*0.20*2*#Ftwalks
0.20
Dc + 0.13 Vc= (0.60 + 0.13) *0.20*0.20* 2*23 1.34 cu.m.
0.20

COMPUTED BY: MARIVIC B. ZAMORANOS


Engineer B
SHEET NO. TOTAL QUANTITY 28.67
CONCURRED BY: KADER S. MODAPIL 1
P.E./Contractor Side 1 UNIT cu.m.

Evaluated by:
LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : BENCHFLUME / MC
STATION : STA. 2+844.00 - STA 3+104
PAY ITEM : 3000 PSI RC
LENGTH (L) : 260 meters

SKETCH COMPUTATION QTY. UNIT


#Ftwalks= (L/5) + 1 = 260/5 + 1 = 53 pcs.
B = 0.40 m.
Dc = 0.50 m. L2= 53 (0.20) = 10.60 m.
L3= L - L2 = 249.40 m.

0.12 0.12 VOLUME (Sides) = (Dc+0.13)*0.12*2*L3


Vs = (0.50 + 0.13) * 0.12 * 2 * 249.40 37.71 cu.m.
Dc
0.13 m.
B

VOLUME (Base) = B * L * 0.13


Vb = 0.40 * 260.0 * 0.13 13.52 cu.m.
B

B VOLUME (Footwalk)=B*0.20*0.10*#Ftwalks
0.10
Vf= 0.40 *0.20*0.10* 53 0.42 cu.m.

0.20 m.

VOLUME(Column) = (Dc+0.13)*0.20*0.20*2*#Ftwalks
0.20
Dc + 0.13 Vc= (0.50 + 0.13) *0.20*0.20* 2*53 2.67 cu.m.
0.20

COMPUTED BY: MARIVIC B. ZAMORANOS


Engineer B
SHEET NO. TOTAL QUANTITY 54.32
CONCURRED BY: KADER S. MODAPIL 1
P.E./Contractor Side 1 UNIT cu.m.

Evaluated by:
LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : BENCHFLUME / MC
STATION : STA. 3+104.00 - STA 3+164
PAY ITEM : 3000 PSI RC
LENGTH (L) : 60 meters

SKETCH COMPUTATION QTY. UNIT


#Ftwalks= (L/5) + 1 = 60/5 + 1 = 13 pcs.
B = 0.40 m.
Dc = 0.50 m. L2= 13 (0.20) = 2.60 m.
L3= L - L2 = 57.40 m.

0.12 0.12 VOLUME (Sides) = (Dc+0.13)*0.12*2*L3


Vs = (0.50 + 0.13) * 0.12 * 2 * 57.40 8.68 cu.m.
Dc
0.13 m.
B

VOLUME (Base) = B * L * 0.13


Vb = 0.40 * 60.0 * 0.13 3.12 cu.m.

VOLUME (Footwalk)=B*0.20*0.10*#Ftwalks
B
0.10 Vf= 0.40 *0.20*0.10* 13 0.10 cu.m.

0.20 m.

VOLUME(Column) = (Dc+0.13)*0.20*0.20*2*#Ftwalks

Vc= (0.50 + 0.13) *0.20*0.20* 2*13 0.66 cu.m.


0.20
Dc + 0.13
0.20

COMPUTED BY: MARIVIC B. ZAMORANOS


Engineer B
SHEET NO. TOTAL QUANTITY 12.56
CONCURRED BY: KADER S. MODAPIL 1
P.E./Contractor Side 1 UNIT cu.m.

Evaluated by:
LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : BENCHFLUME / MC
STATION : STA. 3+164.00 - STA 3+324
PAY ITEM : 3000 PSI RC
LENGTH (L) : 160 meters

SKETCH COMPUTATION QTY. UNIT


#Ftwalks= (L/5) + 1 = 160/5 + 1 = 33 pcs.
B = 0.25 m.
Dc = 0.45 m. L2= 33 (0.20) = 6.60 m.
L3= L - L2 = 153.40 m.
0.12 0.12
VOLUME (Sides) = (Dc+0.13)*0.12*2*L3
Dc Vs = (0.45 + 0.13) * 0.12 * 2 * 153.40 21.35 cu.m.
0.13 m.
B

VOLUME (Base) = B * L * 0.13


B Vb = 0.25 * 160.0 * 0.13 5.20 cu.m.

B
0.10
VOLUME (Footwalk)=B*0.20*0.10*#Ftwalks
Vf= 0.25 *0.20*0.10* 33 0.17 cu.m.

0.20 m.

0.20 VOLUME(Column) = (Dc+0.13)*0.20*0.20*2*#Ftwalks


Dc + 0.13
0.20 Vc= (0.45 + 0.13) *0.20*0.20* 2*33 1.53 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS


Engineer B
SHEET NO. TOTAL QUANTITY 28.25
CONCURRED BY: KADER S. MODAPIL 1
P.E./Contractor Side 1 UNIT cu.m.

Evaluated by:
LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : BENCHFLUME / MC
STATION : STA. 3+324.00 - STA 3+464
PAY ITEM : 3000 PSI RC
LENGTH (L) : 140 meters

SKETCH COMPUTATION QTY. UNIT


#Ftwalks= (L/5) + 1 = 140/5 + 1 = 29 pcs.
B = 0.40 m.
Dc = 0.50 m. L2= 29 (0.20) = 5.80 m.
L3= L - L2 = 134.20 m.

0.12 0.12 VOLUME (Sides) = (Dc+0.13)*0.12*2*L3


Vs = (0.50 + 0.13) * 0.12 * 2 * 134.20 20.29 cu.m.
Dc
0.13 m.
B

VOLUME (Base) = B * L * 0.13


Vb = 0.40 * 140.0 * 0.13 7.28 cu.m.
B

B VOLUME (Footwalk)=B*0.20*0.10*#Ftwalks
0.10
Vf= 0.40 *0.20*0.10* 29 0.23 cu.m.

0.20 m.

VOLUME(Column) = (Dc+0.13)*0.20*0.20*2*#Ftwalks
0.20
Dc + 0.13 Vc= (0.50 + 0.13) *0.20*0.20* 2*29 1.46 cu.m.
0.20

COMPUTED BY: MARIVIC B. ZAMORANOS


Engineer B
SHEET NO. TOTAL QUANTITY 29.26
CONCURRED BY: KADER S. MODAPIL 1
P.E./Contractor Side 1 UNIT cu.m.

Evaluated by:
LIA M. MAYLON
Engineer A
Republic of the Philippines
NATIONAL IRRIGATION ADMINISTRATION
Region IX
Pagadian City

EARTHWORKS
VARIATION ORDER NO.-1

NAME OF PROJECT: LOWER SIBUGUEY II RIS EXTENSION CY 2016 REMAINING - Package 3


CONTRACT NO. NIAREG9-03102020-676
LOCATON: Siay, Zamboanga Sibugay
LATERAL C - HDPE PIPELINE

END AREA VOLUME PAY ITEM


STATION Embankmen Gravel Embankm Exacavati Gravel Exacavati Gravel
Exacavation FILL FILL Embankment FILL
t Bedding ent on Bedding on Bedding
2 + 960.00 0.00 1.70 1.48 0.22 - 2,516.00 2,190.40 325.60 - 2,516.00 2,190.40 325.60
2 + 980.00 24.26 1.71 1.49 0.22 242.60 34.10 29.70 4.40 242.60 34.10 29.70 4.40
3 + 000.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 020.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 040.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 060.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 080.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 100.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 120.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 140.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 160.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 178.00 24.26 1.71 1.49 0.22 436.68 30.78 26.82 3.96 436.68 30.78 26.82 3.96

3 + 201.25 24.26 1.71 1.49 0.22


3 + 220.00 24.26 1.71 1.49 0.22 454.88 32.06 27.94 4.13 454.88 32.06 27.94 4.13
3 + 240.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 260.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 280.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 300.00 24.26 1.71 1.49 0.22 485.20 34.20 29.80 4.40 485.20 34.20 29.80 4.40
3 + 320.00 24.26 1.71 1.49 0.22 485.20 30.35 26.45 3.91 485.20 30.35 26.45 3.91
3 + 340.00 24.26 485.20 485.20
3 + 360.00 24.26 485.20 - - - 485.20 - - -
3 + 380.00 24.26 485.20 - - - 485.20 - - -
3 + 400.00 24.26 485.20 - - - 485.20 - - -
3 + 420.00 24.26 485.20 - - - 485.20 - - -
3 + 440.00 24.26 485.20 - - - 485.20 - - -
3 + 460.00 24.26 485.20 - - - 485.20 - - -
3 + 480.00 24.26 485.20 - - - 485.20 - - -
3 + 500.00 24.26 485.20 - - - 485.20 - - -
3 + 520.00 20.94 452.00 - - - 452.00 - - -
3 + 540.00 20.94 418.80 - - - 418.80 - - -
3 + 560.00 20.94 418.80 - - - 418.80 - - -
3 + 572.75 20.94 266.99 - - - 266.99 - - -
SUB TOTAL: 13,850.35 571.89 498.31 73.60
GRAND TOTAL: 13,850.35 571.89 498.31 73.60

Computed by: Concurred by:


RODEL J. YUNTING
PIC PE-Contractor
Republic of the Philippines
NATIONAL IRRIGATION ADMINISTRATION
Region IX
Pagadian City

EARTHWORKS

NAME OF ILISAN SIP


PROJECT: MAIN CANAL
END AREA VOLUME PAY ITEM
30 %
STATION SIDE
CUT FILL CUT FILL SOLIDITY CUT
BORROW
2+664 0.05 0.44
2+684 0.06 0.91 1.10 13.50 1.10 12.40
2+704 0.06 0.87 1.16 17.80 1.16 16.64
2+724 0.05 0.84 1.06 17.10 1.06 16.04
2+744 0.03 0.96 0.80 18.00 0.80 17.20
2+764 0.10 0.71 1.30 16.70 1.30 15.40
2 + 774 1.12 0.50 9.15 0.50 8.65
5.92 86.33
2 + 844 0.89 0.00 70.35 0.00 70.35
2+864 0.87 0.00 17.60 0.00 17.60
2+884 0.84 0.00 17.10 0.00 17.10
2+904 0.02 0.73 0.20 15.70 0.20 15.50
2+924 1.48 0.20 22.10 0.20 21.90
2+944 1.48 0.40 44.20 0.40 43.80
2+964 1.22 0.00 27.00 0.00 27.00
2+984 1.23 0.00 24.50 0.00 24.50
3+004 0.87 0.00 21.00 0.00 21.00
3+024 1.12 0.00 19.90 0.00 19.90
3+044 0.77 0.00 18.90 0.00 18.90
3+064 0.02 0.55 0.20 13.20 0.20 13.00
3+084 0.09 0.41 1.10 9.60 1.10 8.50
3+104 0.08 0.20 1.70 6.10 1.70 4.40
3.80 387.65
3+124 0.07 0.34 1.50 5.40 1.50 3.90
3+144 0.14 0.03 2.10 3.70 2.10 1.60
3+164 0.82 1.40 8.50 1.40 7.10
5.00 12.60
3+184 0.02 0.45 0.20 12.70 0.20 12.50
3+204 0.03 0.34 0.50 7.90 0.50 7.40
3+224 0.99 0.30 13.30 0.30 13.00
3+244 0.65 0.00 16.40 0.00 16.40
3+264 0.08 0.44 0.80 10.90 0.80 10.10
3+284 1.22 0.80 16.60 0.80 15.80
3+304 1.36 0.00 25.80 0.00 25.80
3+324 1.19 0.00 25.50 0.00 25.50
2.60 126.50
3+344 1.22 0.00 24.10 0.00 24.10
3+364 1.95 0.00 31.70 0.00 31.70
3+384 0.07 0.49 0.70 24.40 0.70 23.70
3+404 0.07 0.66 1.40 11.50 1.40 10.10
3+424 0.07 0.71 1.40 13.70 1.40 12.30
3+444 0.83 0.70 15.40 0.70 14.70
3+464 2.25 22.50 8.30 22.50
26.70 116.60
QUANTITY COMPUTATION SHEET
ILISAN SIP
Alicia, Zamboanga Sibugay
CONTRACT NO. NIAREG9-01222019-599
CONTRACTOR : LONG ISLAND BUILDERS AND CONSTRUCTION
NAME OF STRUCTURE/CANAL : COMB ELEVATED FLUME & TO
STATION : 3 + 492 3 + 608
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT


SIDING 1- inlet
0.87
V= L x W x t x 2 sides
0.5 V= 0.87 0.5 0.13 2.00
0.11
t= 0.13 0.11 cu.m.
SIDING - outlet
0.92
V= L x W x t
0.51
Vol = 0.92 0.51 0.13 2
t= 0.13 0.12 0.12 cu.m.
FLUME VOLUME = AREA(FLUME) x LENGTH

AREAS
A. 0.14 x 0.45 0.06
, 0.14 0.14 B. 0.14 x 0.45 0.06
C. 0.12 x 0.63 0.08
0.45 0.20
0.45 A B
VOLUME= 0.20 x 113.57
, 0.12 C = 22.71
0.35
L=113.57 m. 22.71 cu.m.
FLUME SEAT
0.83 Area = 0.83 x 0.40
0.63 = 0.33

0.1 Area rec.= 0.63 x 0.10


= 0.06
0.15 Area tri.= 0.15 0.29 2.00 0.50
0.40 = 0.04
0.15
, 0.29 Total Area = 0.33 - 0.11
0.25 = 0.23
VOLUME= total area x thickness x no. of flume seat
no. of flume seat = 19 pcs. = 0.23 0.25 19.00
thickness =0.25 1.09 cu.m.
FOOTWALK
0.66 VOL = length x width x thickness
Vol = 0.66 0.2 0.10 39
0.2 = 0.515

t = 0.10 0.515 cu.m.


COMPUTED BY: MARIVIC B. ZAMORANOS
SUB-TOTAL 24.55
ENGINEER B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 1
P.E. / CONTRACTOR SIDE 3

EVALUATED BY:
LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
ILISAN SIP
Alicia, Zamboanga Sibugay
CONTRACT NO. NIAREG9-01222019-599
CONTRACTOR : LONG ISLAND BUILDERS AND CONSTRUCTION
NAME OF STRUCTURE/CANAL : COMB ELEVATED FLUME & TO
STATION : 3 + 492 3 + 608
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT


COLUMN Total height= 1.38+1.98+2.05+2.08+2.08+2.09+
0.2 2.12+2.13+2.14+2.14+2.16+2.16+2.10+
2.15+2.15+2.14+1.91+1.90+1.90
0.2 36.68
Volume= Length x width x height
H Vol= 0.2 0.2 36.68
= 1.47

Total Height= 35.32 1.47 cu.m.


Abutment Total height= 0.50 + 0.50
0.25 = 1
0.63
Volume= Length x width x height
H Vol= 0.25 0.63 1
= 0.16
Total Height= 1.00 0.16 cu.m.
FOOTING 1
1.20
1.40 Volume= Length x width x Thickness x No. footing
Vol= 1.20 1.40 0.30 18
= 9.07
0.30
9.07 cu.m.
Footing of Abutment
0.95
1.40 Volume= Length x width x Thickness x No. footing
Vol= 0.95 1.40 0.30 2
= 0.80
0.30
0.80 cu.m.
FLOORING - inlet
0.87
0.63 VOL=1/2 x (X1 + X2) x Length(thickness)
0.66
Vol = 0.5 1.29 0.87 0.13
0.07
t= 0.13 0.07 cu.m.
FLOORING - outlet
0.92
0.66 VOL=1/2 x (X1 + X2) x Length(thickness)
0.63
Vol = 0.5 1.29 0.92 0.13
t= 0.13 0.08 0.08 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 11.64 cu.m.


ENGINEER B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 2 36.20
P.E. / CONTRACTOR SIDE 3

EVALUATED BY:
LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
ILISAN SIP
Alicia, Zamboanga Sibugay
CONTRACT NO. NIAREG9-01222019-599
CONTRACTOR : LONG ISLAND BUILDERS AND CONSTRUCTION
NAME OF STRUCTURE/CANAL : COMB ELEVATED FLUME & TO
STATION : 3 + 492 3 + 608
PAY ITEM : 3000 psi Reinforced Concrete
SKETCH COMPUTATION QTY. UNIT
TURN OUT
COW Area = Area whole - Area shaded
1.05
0.25 AREA= 1.05 x 0.65
= 0.68
0.25
0.40 Area sq. 0.25 x 0.25
0.65 = 0.06
Area tri. 0.50 0.25 0.25 2.00
0.25 = 0.06
Area = Area whole - (Area sq. + Area tri.)
, 0.25 Total Area= 0.68 - 0.13
= 0.56
Vol.= 0.56 x 0.13
t = 0.13 = 0.07 x 4.00 0.29 cu.m.
FILLET V = Area x length
0.15 Area= 0.50 0.15 0.15
, 0.15 = 0.01
Vol.= 0.01 0.51 4.00
L=0.51 m. 0.02 cu.m.
FLOORING
0.55 V = length x width x thickness
Area= 0.55 0.51 0.13 4.00
0.51 = 0.15
t = 0.13 0.15 cu.m.
SIDING 1 : SECTION E-E
0.30 VOL = length x width x thickness
Vol = 0.30 0.4 0.13 4.00
0.40 = 0.06
0.06 cu.m.
SIDING 1 : SECTION G-G
0.30 VOL = length x width x thickness
Vol = 0.30 0.41 0.13 4.00
0.41 = 0.06
0.06 cu.m.
SIDING 2: SECTION E-E
VOL=1/2 x (X1 + X2) x Length(thickness)
0.40
0.25 Vol = 0.5 0.65 0.25 0.13
= 0.01
0.25
TOTAL VOL.= 0.01 x 4.00 0.04 cu.m.
SIDING 2: SECTION G-G
VOL=1/2 x (X1 + X2) x Length(thickness)
0.41
0.25 Vol = 0.5 0.66 0.25 0.13
= 0.01
0.25
t = 0.13 TOTAL VOL.= 0.01 x 4.00 0.11 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 0.73 cu.m.


ENGINEER B
SHEET NO.
EVALUATED BY: TOTAL QUANTITY 36.93
LIA M. MAYLON
Engineer A
CONCURRED BY: KADER S. MODAPIL 3 TOTAL QUANTITY 36.93
P.E. / CONTRACTOR SIDE 3

EVALUATED BY:
LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
ILISAN SIP
Alicia, Zamboanga Sibugay
CONTRACT NO. NIAREG9-01222019-599
CONTRACTOR : LONG ISLAND BUILDERS AND CONSTRUCTION
NAME OF STRUCTURE/CANAL : COMB ELEVATED FLUME & TO
STATION : 3 + 492 3 + 608
PAY ITEM : STRUCTURE/ROCK EXCAVATION/BACKFILL

SKETCH COMPUTATION

w = 2.00 m.
STRUCTURE EXCAVATION
Hatched Area (RED) = 34.68 sq.m.
Vol. = 34.68 x 2.00 = 69.36 cu.m.

ROCK EXCAVATION
Hatched Area (YELLOW)= 9.49 sq.m. Vol. = 9.49 x 2.00 = 18.98 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total cu.m.


ENGINEER B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 1 TOTAL QUANTITY
P.E. / CONTRACTOR SIDE 1

EVALUATED BY:
LIA M. MAYLON
Engineer A
1
QUANTITY COMPUTATION SHEET
ILISAN SIP
Alicia, Zamboanga Sibugay
CONTRACT NO. NIAREG9-01222019-599
CONTRACTOR : LONG ISLAND BUILDERS AND CONSTRUCTION
NAME OF STRUCTURE/CANAL : COMB ELEVATED FLUME & TO
STATION : 3 + 492 3 + 608
PAY ITEM : STRUCTURE EXCAVATION/BACKFILL

SKETCH COMPUTATION QTY. UNIT


STRUCTURE EXCAVATION STRUCTURE BACKFILL

A3 0.30
A2
1.65
A1 A2 1.11 1.65 1.05
A1

A3 0.30

0.55 0.43 0.55


EXCAVATION:

V1 = A1 x H1
H2=H3 V1 = 1.65 0.43 0.75 4.00 2.13 cu.m.
H1 V2 = A2 x H2
V1 = 1.11 0.55 0.41 4.00 1.00 cu.m.

BACKFILL:

V1 = A1 x H1
H1 = 0.75 m. A1= 0.71 - 0.1365 0.57
H2 = 0.41 m. V1 = 0.57 x 0.75 4.00 1.72 cu.m.
H3 = 0.41 m. V2 = A3 x H3 x 2
V2+V3 = 0.30 0.55 0.41 4.00 0.27 cu.m.

V excavation = 3.13 cu.m.


V backfill = 1.99 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total


ENGINEER B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 1
P.E. / CONTRACTOR SIDE 1

EVALUATED BY:
LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
Alicia, Zamboanga Sibugay
NIAREG9-01222019-599
NAME OF CONTRACTOR : LONG ISLAND BUILDERS & CONSTRUCTION
NAME OF STRUCTURE/CANAL : CUT & COVER COMB. T.O. LS
STATION : 2+774.00 - 2+844.00 -
PAY ITEM : 3000 PSI STRUCTURAL CONCRETE

SKETCH COMPUTATION QTY. UNIT


BARREL: Length = 70.00 m.

A = (0.90 x0.92) - (0.60 x 0.60) + (0.50 x 0.10 x


0.15 0.10(4) )
A = 0.488
V= 0.488 x 66.32 32.36
0.60 0.92

0.17 V =32.36 - Manhole Opening


0.90 V = 32.36- 3(0.6 x 1.00 x 0.15) 32.09 cu.m.

MANHOLE EVERY 20m. : # of manhole 3 pcs

0.15 1.00 0.15

0.15 A. Manhole Cover


V = (1.30 x 0.10 x 0.90) + (1 x 0.05 x 0.60)
0.90
0.60
= 0.147 x 3.00 0.44 cu.m.
0.15
1.30

C. V = A * Htotal

0.15
1.00
0.15
Ht = (1.54+1.73+1.22)
0.10 0.15

0.15 x 0.15
fillet
= 4.49

V manhole
(1.30 x (0.90) - 1 (0.60))x 4.49 2.56 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 35.09


ENGINEER B
SHEET NO. TOTAL QUANTITY
CONCURRED BY: KADER S. MODAPIL
P.E. / CONTRACTOR SIDE UNIT cu.m.

EVALUATED BY:

LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : CHECK & TURN OUT L.S./MAIN CANAL
STATION : 2+774.00 - 2+844.00 -
PAY ITEM : 3000 psi Reinforced Concrete

Siding Inlet:
Siding: V = AREA x THICKNESS
AREA = 1/2(1.25+0.60)(0.90)
0.83
0.60 1.25
V = 0.83 x 0.13 x 2 sides 0.2158 cu.m.
0.90
Thickness = 0.13

0.6 V = AREA x THICKNESS


AREA = 0.60 x 0.60
0.6 0.36

V = 0.36x 0.13 x 2sides 0.09 cu.m.

Siding Outlet:
V = AREA x THICKNESS
AREA = 1/2(1.25+0.62)(1.30)
1.25 0.62 1.22

1.30 V = 1.22 x 0.13 x 2 sides 0.32 cu.m.

0.83 V = AREA x THICKNESS


AREA = 0.83 x 0.50
0.50 0.42

V = 0.42 x 0.13 x 2 sides 0.11 cu.m.


Footwalk
T = 0.10
0.86
V= 0.86 x 0.30 x 0.10 0.03 cu.m.
0.30

Head Wall Inlet :


T = 0.15 V= 1.30 x 0.2 x 0.15 0.04 cu.m.

Head Wall Outlet:


T = 0.15 V= 1.30 x 0.2 x 0.15 0.04 cu.m.

Flooring Inlet:

1.50
V = 0.66 x 1.50 x 0.13 0.13 cu.m.
0.66

T = 0.13
Flooring Outlet :
2.38

0.66 V = 0.66 x 2.38 x 0.13 0.20 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 1.18 cu.m.


ENGINEER B
SHEET NO. TOTAL QUANTITY

EVALUATED BY:

LIA M. MAYLON
Engineer A
CONCURRED BY: KADER S. MODAPIL 36.27
P.E. / CONTRACTOR SIDE UNIT cu.m.

EVALUATED BY:

LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : CHECK & TURN OUT L.S./MAIN CANAL
STATION : 2+774.00 - 2+844.00 -
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT


TURNOUT SECTION F-F: Cut of wall

1.05
0.25 Area = Areawhole - Area shaded
Area Whole = 1.05*0.25
0.25 0.68
0.40 Area Shaded = Area square + total area Triangle
0.65 Area Square = 0.30*0.25
0.06
0.25 Area Triangle0 =0 .25*0.25 0.5
0.03125
0.25 Area shaded = 0.09
t= 0.13 Area Total = 0.59
Vol = Area x thickness 0.59 0.13
0.0765375 1 0.08 cu.m.
Fillet
0.15
0.15 V = 1/2*0.15*0.15*2 0.51
0.0115 1.00 0.01 cu.m.

Flooring

0.51
0.60 Vol = 0.51 x 0.60 x 0.13 1.00
t= 0.13 0.04 0.04 cu.m
Siding
0.30
0.41
0.25 Vol = 0.50 x (0.41 + 0.25) x 0.30 x 0.13 x 2
t= 0.13 0.03

0.03 cu.m
Siding

0.41 Vol = 0.41 x 0.30 0.13 2


0.0320 0.03 cu.m.
0.30
t= 0.13
cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub- total 0.19 cu.m.


ENGINEER B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 2 TOTAL QUANTITY 0.19
P.E. / CONTRACTOR SIDE 2 UNIT cu.m.

EVALUATED BY:

LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-11092018-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : CUT & COVER
STATION : 3+636.00 - 3+671.50 -
PAY ITEM : 3000 PSI STRUCTURAL CONCRETE

SKETCH COMPUTATION QTY. UNIT


BARREL: Length = 35.50 m.
Length =

0.15 A = (0.90 x0.92) - (0.60 x 0.60) + (0.10 x 0.10(4) )


A = 0.51
V= 0.51 x 34.00 17.34
0.60 0.92

0.17 V =11.32 - Manhole Opening


V = 11.32- 1(0.6 x 1.00 x 0.15) 11.06 cu.m.
0.90

MANHOLE EVERY 20m. : # of manhole 1 pcs

0.15 1.00 0.15 STATION OF 1ST MAN


0.15 A. Manhole Cover STATION OF last MAN
V = ((1.30*0.90*0.10)+(1.00*0.60*0.05))*1 0.15 cu.m.
Manhole width =
0.90
0.60

0.15
1.30

C. V = A * Htotal

Ht = 0.73
0.15 0.15
1.00
0.10 0.15
= 0.73
H

0.15 x 0.15
fillet

V manhole
(1.30 x (0.90) - 1 (0.60))x 0.73 0.42 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 11.62


' Engineer B
SHEET NO. TOTAL QUANTITY -
CONCURRED BY: KADER S. MODAPIL
P.E. Contractor - Side UNIT cu.m.

EVALUATED BY:

MA. GERTRUDES P. GANIA


Supervising Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-11092018-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : CHECK & TURN OUT L.S./MAIN CANAL
STATION : 3+636 - 3+672
PAY ITEM : 3000 psi Reinforced Concrete

Siding: V = AREA x THICKNESS


AREA = 1/2(0.50+0.80)(0.90)
0.59
0.50 0.80
V = 0.59 x 0.13 x 2 sides 0.15 cu.m.
0.90
Thickness = 0.13

0.6 V = AREA x THICKNESS


AREA = 0.60 x 0.80
0.8 0.48

V = 0.48 x 0.13 x 2sides 0.12 cu.m.

Footwalk
T = 0.10
1.30
V= 1.30 x 0.30 x 0.10 0.04 cu.m.
0.30
`

Head Wall Inlet :


T = 0.15 V= 0.90 x 0.2 x 0.15 0.03 cu.m.

Flooring Inlet:

1.50
V = 0.66 x 1.50 x 0.13 0.13 cu.m.
0.66

T = 0.13

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 0.47


' Engineer B
SHEET NO. TOTAL QUANTITY
CONCURRED BY: KADER S. MODAPIL 12.09 12.09
P.E. Contractor - Side UNIT cu.m.

EVALUATED BY:

MA. GERTRUDES P. GANIA


Supervising Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-11092018-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL :
STATION : 3+636 - 3+672
PAY ITEM : STRUCTURE EXCAVATION

SKETCH COMPUTATION

w = 1.90 m.
STRUCTURE EXCAVATION
Hatched Area(blue) = 55.71 sq.m.
Vol. = 55.71 x 1.90 = 105.849 cu.m.
55.75 1.9 105.925
Rock Excavation
Hatched Area(blue) = 5.59 sq.m. 5.59 1.9000 10.62
Vol. = 5.59 x 1.90 = 10.62 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total cu.m.


' Engineer B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 3 TOTAL QUANTITY
P.E. Contractor - Side 3

EVALUATED BY:

MA. GERTRUDES P. GANIA


Supervising Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-11092018-577
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : CHECK & TURN OUT/MAIN CANAL
STATION : 4 + 124
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT


TURNOUT SECTION C-C: Cut of wall
1.1
1.15
0.3 Area = Areawhole - Area shaded
Area Whole = 1.05*.70
0.3 0.81
0.40 Area Shaded = Area square + total area Triangle
0.70 Area Square = 0.30*0.25
0.09
0.3 Area Triangle0 =0 .30*0.30 0.5
0.045
0.3 Area shaded = 0.14
t= 0.13 Area Total = 0.67
Vol = Area x thickness 0.67 0.13
0.0871 1 0.09 cu.m.
Fillet
0.15
0.15 V = 1/2*0.15*0.15*2 0.56
0.0126 2.00 0.03 cu.m.

Flooring

0.56
0.70 Vol = 0.70 x 0.61 x 0.13 2.00
t= 0.13 0.10 0.10 cu.m
Siding
0.35
0.56
0.30 Vol = 0.50 x (0.56 + 0.30) x 0.35 x 2
t= 0.13 0.30

0.30 cu.m

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 0.52 cu.m


Engineering Assistant A
SHEET NO. TOTAL QUANTITY
CONCURRED BY: KADER S. MODAPIL 1
P.E. / CONTRACTOR SIDE 2 UNIT cu.m
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-11092018-577
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Drainage Crossing/MAIN CANAL
STATION : 4 + 124
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT


Siding

0.56 Vol = 0.56 x 0.35 0.13 2


0.0510 0.05 cu.m.
0.35
t= 0.13
0.56 FootWalk

0.15 Vol = 0.56 0.15 1


0.01 0.01 cu.m

t= 0.10
cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub- total 0.06 cu.m.


Engineering Assistant A
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 2 TOTAL QUANTITY 0.58
P.E. / CONTRACTOR SIDE 2 UNIT cu.m.
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-11092018-577
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Drainage Crossing/MAIN CANAL
STATION : 1 + 148
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QUANTITY


Cut of wall- INLET
1.81
V= W x H x t
V= 1.81 0.6 0.15
0.6 0.163 0.16

t= 0.15
Flooring - INLET
C ² = 𝑎²+b²

Vol = 1/2 (1.50 (1.81 + 0.87) (0.13)


0.261 0.26
1.81
0.87

1.50
t= 0.13
SIDINGS: Vol.rec. - Vol.hollow = Vol.total
V - hollow , considering 2 sides Area.rec. X thickness = vol.rec
1.50 A = 1.50 x 1.72
2.58 x 0.13
A1
0.58 0.335
1.72 Area.hollow x thickness = Vol.hollow
1.14 A2 A1 = 1/2 x 0.58 x 1.50
0.44 x0.13
1.00 0.057
0.50 A2 = 1/2 x 1.14 x 1.00
t= 0.13 0.57 x 0.13
0.074
Vol.rec. - Vol.hollow = Vol.total x 2 sides
(0.231)- (0.038+ 0.048)]
0.34 - 0.131 x2
= 0.4095 0.41
Sub-total 0.83
COMPUTED BY: MARIVIC B. ZAMORANOS
Engineering Assistant A
SHEET NO. TOTAL QUANTITY
CONCURRED BY: KADER S. MODAPIL 1
P.E./Contractor Side 3 UNIT
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-11092018-577
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Drainage Crossing/MAIN CANAL
STATION : 1 + 048
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QUANTITY


Headwall Headwall- INLET

VOLUME INLET
0.87 x 0.80 x 0.15
h-INLET 0.08

0.8 0.104 0.10


h-OUTLET Headwall - OUTLET
0.8
0.08 VOLUME OUTLET
15
0.87 x 0.80 x 0.15
0.87
t= 0.15 0.104 0.10
Collar Semi circle
𝐴=𝜋𝑟^2
A1= [(3.14)(.545)²]/2
0.61 0.466
0.15 0.395 0.545
A2= [(3.14)(0.395)²]/2
0.545 0.245
0.09 A3= (0.545)*(1.09)
0.15
0.594
1.09
T=0.20 at1=A1-A2 = 0.221
A1 = area of semicircle at2=A3-A2 = 0.349
A2= area of RCP semicircle at=at1+at2 = 0.570
A3= area of rectangle V= 0.570 0.2 0.114 x 2 Collar = 0.23
SIDINGS: Vol.rec. - Vol.hollow = Vol.total
V - hollow side OUTLET Area.rec. X thickness = vol.rec
2.00 A = 2.00 x 1.72
A1 3.44 x 0.13
0.78 0.447
1.72 Area.hollow x thickness = Vol.hollow
0.94 A2 A1 = 1/2 x 0.78 x 2.00
0.78 x0.13
1.50 0.101
0.5 A2 = 1/2 x 0.94 x 1.50
MIRROR 0.705 x 0.13
0.092
Vol.rec. - Vol.hollow = Vol.total x 2 sides
(0.278)- (0.050+ 0.051)]
0.45 - 0.193 x2
= 0.5083 0.51

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 0.95


Engineering Assistant A
SHEET NO. TOTAL QUANTITY
CONCURRED BY: KADER S. MODAPIL 2
P.E./Contractor Side 3 UNIT cu.m.
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-11092018-577
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Drainage Crossing/MAIN CANAL
STATION : 1 + 048
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QUANTITY


Flooring - OUTLET Length of flooring

Vol = 1/2 (2.00) (1.81 + 0.87) (0.13)


0.87 0.348 0.35
1.81

0.50 1.50

t= 0.15
Cut of wall - OUTLET

1.81 V= LxWxH
V= 1.81 0.13 0.8
= 0.188 0.19
0.8

t= 0.13

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-Total 0.54


Engineering Assistant A
SHEET NO. TOTAL QUANTITY
CONCURRED BY: KADER S. MODAPIL 3 2.32
P.E./Contractor Side 3 UNIT cu.m.
ANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
LICIA, ZAMBOANGA SIBUGAY
RACT NO. NIAREG9-11092018-577

Drainage Crossing/MAIN CANAL


1 + 148
3000 psi Reinforced Concrete

UNIT

cu.m.

cu.m.

cu.m.
cu.m.
ANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
LICIA, ZAMBOANGA SIBUGAY
RACT NO. NIAREG9-11092018-577

Drainage Crossing/MAIN CANAL


1 + 048
3000 psi Reinforced Concrete

UNIT

cu.m.

cu.m.

cu.m.
cu.m.

cu.m.

cu.m.
ANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
LICIA, ZAMBOANGA SIBUGAY
RACT NO. NIAREG9-11092018-577

Drainage Crossing/MAIN CANAL


1 + 048
3000 psi Reinforced Concrete

UNIT

cu.m.

cu.m.

cu.m.

cu.m.
Republic of the Philippines
NATIONAL IRRIGATION ADMINISTRATION
Region IX
Pagadian City

EARTHWORKS

NAME OF ILISAN SIP


PROJECT: CUT & COVER
END AREA VOLUME PAY ITEM
STATION ROCK ROCK
CUT FILL CUT FILL CUT FILL ROCK
EXCAVATION EXCAVATION EXCAVATION
2 + 774 0.04 0.94
2+784 3.49 2.66 0.22 17.65 18.00 1.10 17.65 18.00 1.10
2+787 3.55 2.83 0.30 10.56 8.24 0.78 10.56 8.24 0.78
2 + 791 3.59 2.77 0.35 14.28 11.20 1.30 14.28 11.20 1.30
2 + 804 4.40 4.79 1.56 51.94 49.14 12.42 51.94 49.14 12.42
2+824 3.95 3.63 0.85 83.50 84.20 24.10 83.50 84.20 24.10
2 + 844 1.12 39.50 47.50 8.50 39.50 47.50 8.50
TOTAL 217.43 218.28 48.20

Computed by: Concurred by:

MARIVIC B. ZAMORANOS KADER S. MODAPIL


Engineer B P.E./Contractor - Side

Evaluated by:

LIA M. MAYLON
Engineer A
Republic of the Philippines
NATIONAL IRRIGATION ADMINISTRATION
Region IX
Pagadian City

EARTHWORKS

NAME OF ILISAN SIP


PROJECT: CUT & COVER
END AREA VOLUME PAY ITEM
STATION ROCK ROCK
CUT FILL CUT FILL CUT FILL ROCK
EXCAVATION EXCAVATION EXCAVATION
2 + 774 0.04 0.94
2 + 804 4.40 4.79 1.56 51.94 49.14 12.42
2+824 3.95 3.63 0.85 83.50 84.20 24.10 83.50 84.20 24.10
2 + 844 1.12 39.50 47.50 8.50 39.50 47.50 8.50
TOTAL 123.00 131.70 32.60

Computed by: Concurred by:

MARIVIC B. ZAMORANOS KADER S. MODAPIL


Engineer B P.E./Contractor - Side

Evaluated by:

LIA M. MAYLON
Engineer A
Republic of the Philippines
NATIONAL IRRIGATION ADMINISTRATION
Region IX
Pagadian City

EARTHWORKS

NAME OF ILISAN SIP


PROJECT: CUT & COVER
END AREA VOLUME PAY ITEM
STATION ROCK ROCK
CUT FILL CUT FILL CUT FILL ROCK
EXCAVATION EXCAVATION EXCAVATION
2 + 774 0.04 0.94
2+784 3.49 2.66 0.22 17.65 18.00 1.10 17.65 18.00 1.10
2+787 3.55 2.83 0.30 10.56 8.24 0.78 10.56 8.24 0.78
2 + 791 3.59 2.77 0.35 14.28 11.20 1.30 14.28 11.20 1.30
2 + 804 4.40 4.79 1.87 51.94 49.14 14.42 51.94 49.14 14.42
2+824 3.95 3.63 83.50 84.20 18.69 83.50 84.20
2 + 844 1.12 39.50 47.50 0.00 39.50 47.50
TOTAL 217.43 218.28 17.60

Computed by: Concurred by:

MARIVIC B. ZAMORANOS KADER S. MODAPIL


Engineer B P.E./Contractor - Side

Evaluated by:

LIA M. MAYLON
Engineer A
PIPELINE HDPE
TOTAL
BAR SIZE LENGTH QUANTIT
BAR DETAILS LENGTH
(mm) (m) Y
(m)
Strut Beam Sta. 2+460-2+960 (Lateral C)
vert.
(12mm ) 0.80 400 320.00

tie bars
(12mm ) 0.72 400 288.00

waste factor (15%)=


TOTAL 12mm
Strut Beam Sta. 2+960-3+178 (Lateral C)
vert.
(12mm ) 0.80 176 140.80

tie bars
C1 (12mm ) 0.72 176 126.72

waste factor (15%)=


TOTAL 12mm
Strut Beam Sta. 3+201.75-3+572.75 (Lateral C)
vert.
(12mm ) 0.80 392 313.60

tie bars
C1 (12mm ) 0.72 392 282.24

waste factor (15%)=


TOTAL 12mm

SAY
Computed by:

LIMAR F. JUMALON
Engineering Assistant B

EVALUATED BY:
EVALUATED BY:
EVALUATED BY:
EVALUATED BY:
EVALUATED BY:
EVALUATED BY:
TOTAL NO. TOTAL TOTAL
UNIT WT.
BARS PER NO. OF WEIGHT
kg/m (kg)
LENGTH 6m BARS

0.888 54.00 287.71

0.888 48.00 255.74

12mmØ= 102.00 543.46


waste factor (15%)= 15.30 81.52
TOTAL 12mm Ø = 117.30 624.97

0.888 24.00 127.87

0.888 22.00 117.22

12mmØ= 46.00 245.09


waste factor (15%)= 6.90 36.76
TOTAL 12mm Ø = 52.90 281.85

0.888 54.00 287.71

0.888 48.00 255.74

12mmØ= 102.00 543.46


waste factor (15%)= 15.30 81.52
TOTAL 12mm Ø = 117.30 624.97

12mmØ= 118.00 628.70


TOTAL kgs.= 628.70

EVALUATED BY:
# of rcp
dia of RCP

EVALUATED BY:
0.6 0.61
thickness 0.13
Inlet warf

0.6 0.61
thickness 0.15

Inlet warf

CoW
depth

in elev.
b elev
Distance
inclined
flat

outlet warf

CoW
depth
b elev

Distance
inclined
#REF! flat

EVALUATED BY:
EVALUATED BY:
QUANTITY COMPUTATION SHEET
LOWER SIBUGUEY II RIS EXTENSION PROJECT CY 2016 REMAINING WORKS
Siay , Zamboanga Sibugay
NIAREG9-03102020-675
CONTRACT NO. NIAREG9-0822-2016-LINEPROJECT-026(INFRA)
CONTRACTOR : LAKEWOOD CONSTRUCTION COMPANY
NAME OF STRUCTURE/CANAL : RC PILE STRUT 20cm x 20cm
STATION : 3 + 217.75 to 3 + 572.75
PAY ITEM : 3000 PSI PLAIN CONCRETE
LENGTH (L) : 355 meters
PIPE LINE HDPE

SKETCH COMPUTATION QTY. UNIT

Strut Beam every 5 meters


total number of strut=71.00 pcs A = 0.20 x 0.20 = 0.04
length of strut per pile (2D)=0.71 m V=AxL
V= 0.04 x 0.71 = 0.0284
Vtotal = V x No. of Strut Beam
Vtotal = 0.0284 x 71 = 2.02 cu.m.

Computed by:

RODEL J. YUNTING
PIC
Checked by: SHEET NO. TOTAL QUANTITY
1 2.02
cu.m.
1
Contractor UNIT

EVALUATED BY:

JADE J. BAGTASOS
QUANTITY COMPUTATION SHEET
LOWER SIBUGUEY II RIS EXTENSION PROJECT CY 2016 REMAINING WORKS
Siay , Zamboanga Sibugay

CONTRACTOR : LAKEWOOD CONSTRUCTION COMPANY


NAME OF STRUCTURE/CANAL : RC PILE 20cm x 20cm x 6.00m
STATION : 3 + 217.75 to 3 + 572.75
PAY ITEM : RSB (Reinforcing Bars)
LENGTH (L) : 355 meters

SKETCH COMPUTATION
QTY unit
# of pile=71.00 pair.
pile intervals=5.00 m.

Pile Driven
L.m = # of piles x length
= 81 x 2 x 9
= 1,278.00 l.m 1,278.00 l.m

𝑎²+b²

20cm

12cm
12cm 12cm 20cm

12cm

COMPUTED BY:
PREPARED BY: RODEL J. YUNTING Sub-total 1,278.00 l.m
Project-Incharge
SHEET NO. 1,278.00 l.m
CONCURRED BY: 1 TOTAL QUANTITY
Contractor 1

EVALUATED BY:
JADE J. BAGTASOS
QUANTITY COMPUTATION SHEET
LOWER SIBUGUEY II RIS EXTENSION PROJECT CY 2016 REMAINING WORKS
Siay , Zamboanga Sibugay

CONTRACTOR : LAKEWOOD CONSTRUCTION COMPANY


NAME OF STRUCTURE/CANAL : RC PILE 20cm x 20cm x 6.00m
STATION : 2 + 960.00 to 3 + 178.00
PAY ITEM : RSB (Reinforcing Bars)
LENGTH (L) : 218 meters

SKETCH COMPUTATION

# of pile=44.00 pair. LATERAL TIES 12mm dia RSB


pile intervals=5.00 m. 24pcs. Sp. @ 5cm O.C.
22pcs. Sp. @ 5cm O.C.
45pcs. sp. @ 15cm O.C.
(12cm x 4)+ 10 cm = 0.58cm/pc
91 pcs x 0.58 m/pc 52.78 mtrs
. 6.00 mtr/ pcs
= 8.80 pcs say 9.00

HORIZONTAL BARS 20mm dia RSB

4 pcs. x 9m 36 mtrs
6.00 mtr/ pcs
= 6.00 pcs
𝑎²+b²

20cm

12cm
12cm 12cm 20cm

12cm

COMPUTED BY:
PREPARED BY: RODEL J. YUNTING Sub-total
Project-Incharge
SHEET NO.
CONCURRED BY: 1 TOTAL QUANTITY
Contractor 1

QUANTITY COMPUTATION SHEET


LOWER SIBUGUEY II RIS EXTENSION PROJECT CY 2016 REMAINING WORKS
Siay , Zamboanga Sibugay

EVALUATED BY:
CONTRACTOR : LAKEWOOD CONSTRUCTION COMPANY
NAME OF STRUCTURE/CANAL : RC PILE 20cm x 20cm x 6.00m
STATION : 3 + 201.75 to 3 + 572.75
PAY ITEM : RSB (Reinforcing Bars)
LENGTH (L) : 371 meters

SKETCH COMPUTATION
# of pile=75.00 pair. LATERAL TIES 12mm dia RSB
pile intervals=5.00 m. 24pcs. Sp. @ 5cm O.C.
22pcs. Sp. @ 5cm O.C.
45pcs. sp. @ 15cm O.C.
(12cm x 4)+ 10 cm = 0.58cm/pc
91 pcs x 0.58 m/pc 52.78 mtrs
. 6.00 mtr/ pcs
= 8.80 pcs say 9.00

HORIZONTAL BARS 20mm dia RSB

4 pcs. x 9m 36 mtrs
6.00 mtr/ pcs
= 6.00 pcs
𝑎²+b²

20cm

12cm
12cm 12cm 20cm

12cm

COMPUTED BY:
PREPARED BY: RODEL J. YUNTING Sub-total
Project-Incharge
SHEET NO.
CONCURRED BY: 1 TOTAL QUANTITY
Contractor 1

EVALUATED BY:
EVALUATED BY:
EVALUATED BY:
EVALUATED BY:
EVALUATED BY:
NTITY COMPUTATION SHEET
EXTENSION PROJECT CY 2016 REMAINING WORKS
Siay , Zamboanga Sibugay

12mm 20mm
(0.888kg/m) (2.466kg/m)

4,219.78

7,812.29

4,219.78 7,812.29

12,032.06

NTITY COMPUTATION SHEET


EXTENSION PROJECT CY 2016 REMAINING WORKS
Siay , Zamboanga Sibugay
0.6
EVALUATED BY:
thickness

12mm 20mm
(0.888kg/m) (2.466kg/m)

7,192.80

13,316.40

3.696

7,192.80 13,316.40

20,509.20

EVALUATED BY:
0.6
thickness

0.6
thickness

#REF!

EVALUATED BY:
EVALUATED BY:
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
LOWER SIBUGUEY II RIS EXTENSION PROJECT CY2016 REMAINING WORKS
SIAY, ZAMBOANGA SIBUGAY
NIAREG9-03102020-676
NAME OF CONTRACTOR: LAKEWOOD CONSTRUCTION COMPANY
NAME OF STRUCTURE/CANAL : Road Crossing/LAT-C
STATION : 3+178 - 3+201.75
PAY ITEM : HDPE PIPE (355 MM DIAMETER)

19.31

3.94
2.85

13.71
1.96

0.80

W= 1.4 m
HORIZONTAL PIPE 13.71 / 6 = 2.285 SAY 2.5
INLET PIPE 2.85 / 6 = 0.475 SAY 0.5
OUTLET PIPE 3.94 / 6 = 0.66 SAY 1
No. of HDPE PIPE (355 mm diameter) SUB-TOTAL 4
DOUBLE PIPE TOTAL 8

8
COMPUTED BY: RODEL J. YUNTING Sub-Total TOTAL PCS
Project In-charge
SHEET NO. TOTAL QUANTITY
CONCURRED BY: 1 TOTAL 8.00
PE-CONTRACTOR 1 UNIT PCS

EVALUATED BY:

JADE J. BAGTASOS
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
LOWER SIBUGUEY II RIS EXTENSION PROJECT CY2016 REMAINING WORKS
SIAY, ZAMBOANGA SIBUGAY
NIAREG9-03102020-676
NAME OF CONTRACTOR: LAKEWOOD CONSTRUCTION COMPANY
NAME OF STRUCTURE/CANAL : Road Crossing/LAT-C
STATION : 3+178 - 3+201.75
PAY ITEM : REINFORCING STEEL BAR (RSB)

TOTAL
TOTAL TOTAL
BAR SIZE LENGTH QUANTIT UNIT WT. NO. BARS
BAR DETAILS TOTAL LENGTH (m) NO. OF WEIGHT
(mm) (m) Y kg/m PER (kg)
6m BARS
LENGTH

FLOORING OUTLET
1.45
hor.
(10mm) 1.45 5 7.25 0.616 2.00 7.39

1.012
vert.
(10mm ) 1.012 7 7.08 0.616 1.00 3.70

SIDING OUTLET (TWO SIDES)

hor.
(10mm) 7.34 0.616 2.00 7.39

0.94 vert.
(10mm ) 7.52 0.616 2.00 7.39

1.87

INLET PARAPET WALL


1.112
hor.
(10mm) 1.11 3 3.34 0.616 1.00 3.70

vert.
0.6 (10mm ) 0.60 5 3.00 0.616 1.00 3.70

SUB-TOTAL
10mm Ø = 9.00 33.26
Computed by: TOTAL 10mm Ø = 20.00 73.92
waste factor (15%)= 3.00 11.09
RODEL J. YUNTING TOTAL 10mm Ø= 23.00 85.01
PIC

Concurred by:

PE- Contractor

EVALUATED BY:
JADE J. BAGTASOS
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
LOWER SIBUGUEY II RIS EXTENSION PROJECT CY2016 REMAINING WORKS
SIAY, ZAMBOANGA SIBUGAY
NIAREG9-03102020-676
NAME OF CONTRACTOR: LAKEWOOD CONSTRUCTION COMPANY
NAME OF STRUCTURE/CANAL : Road Crossing/LAT-C
STATION : 3+178 - 3+201.75
PAY ITEM : 3000 psi Plain Concrete
COLLAR OUTLET Area Concrete= Area Rec. - Area of pipe
Area Rec. = 1.11 * 0.755
1.11 Area Rec. = 0.838 sq.m
0.3 Area Concrete = 0.640 sq.m

Vol. Concrete = Area Concrete * w


0.755 Vol. Concrete = 0.640 x w = 0.30 m.
Vol. Concrete = 0.192 cu.m 0.19 cu.m.

w = 0.30 m.
area of pipe = 0.20 sq.m.
OUTLET FLOORING
t = 0.15 m.
1.55 Vol. Concrete = Area concrete x thickness
Vol. Concrete = 1.55 * 1.112 * 0.15
Vol. Concrete = 0.26 cu.m 0.26 cu.m.
1.112

SIDE WALL OUTLET ( two sides)


t = 0.15 m.
1.55 A1= 1.55 x 0.43 x 1/2
0.32 A1= 0.33 sq.m

A1 0.43 A2= 1.55 x 0.20 x 1/2


A2= 0.16 sq.m
0.94
0.31 Area Rec.= 1.87 x 0.94
Area Rec.= 1.76 sq.m
A2
0.2
0.32 Area shaded= Area Rec. - (A1 + A2)
1.55 Area shaded= 1.26 sq.m
Vol. Concrete= Area shaded * thickness * 2
Vol. Concrete= 0.38 cu.m 0.38 cu.m.
OUTLET PARAPET
w = 1.11 m.
Vol. Concrete = Area concrete x width
Vol. Concrete = 0.15 * 0.60 * 1.112
Vol. Concrete = 0.10 cu.m 0.10 cu.m.
0.60

0.15
COLLAR OUTLET (Connected To siphonic RD.CR Pipe)
Area Concrete= Area Rec. - Area of pipe
Area Rec. = 1.11 * 0.755
1.11 Area Rec. = 0.838 sq.m
0.3 Area Concrete = 0.640 sq.m

Vol. Concrete = Area Concrete * w


0.755 Vol. Concrete = 0.640 x w = 0.30 m.
Vol. Concrete = 0.192 cu.m 0.19 cu.m.

w = 0.30 m.
area of pipe = 0.20 sq.m.
Sub-total 1.12 cu.m.
COMPUTED BY: RODEL J. YUNTING
PIC
SHEET NO. TOTAL QUANTITY
CONCURRED BY: 2 2.44 cu.m.
PE-CONTRACTOR 2 UNIT
EVALUATED BY:

JADE J. BAGTASOS
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
LOWER SIBUGUEY II RIS EXTENSION PROJECT CY2016 REMAINING WORKS
SIAY, ZAMBOANGA SIBUGAY
NIAREG9-03102020-676
NAME OF CONTRACTOR: LAKEWOOD CONSTRUCTION COMPANY
NAME OF STRUCTURE/CANAL : Drainage Crossing/LAT-C
STATION : 3 + 220
PAY ITEM : BOULDER BEDDING

80 60

15
15

W= 1.4 m
Hatched Area = 6.32 sq.m
Working Space = 0.30 m.

BOULDER BEDDING Vol. = 6.32 x 1.4 = 8.85 cu.m.

COMPUTED BY: RODEL J. YUNTING Sub-Total 8.85 cu.m.


Project In-charge
SHEET NO. TOTAL QUANTITY
CONCURRED BY: 1 8.85
CONTRACTOR 1 UNIT cu.m.

EVALUATED BY:
JADE J. BAGTASOS
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
LOWER SIBUGUEY II RIS EXTENSION PROJECT CY2016 REMAINING WORKS
SIAY, ZAMBOANGA SIBUGAY
NIAREG9-03102020-676 LINEPROGRAMS-EXTENSION
NAME OF CONTRACTOR: LAKEWOOD CONSTRUCTION COMPANY
NAME OF STRUCTURE/CANAL : Drainage Crossing/LAT-C
STATION : 3 + 140
PAY ITEM : BOULDER BEDDING

80 60

15
15

W= 1.4 m
Hatched Area = 6.32 sq.m
Working Space = 0.30 m.

BOULDER BEDDING Vol. = 6.32 x 1.4 = 8.85 cu.m.

COMPUTED BY: RODEL J. YUNTING Sub-Total 8.85 cu.m.


Project In-charge
SHEET NO. TOTAL QUANTITY
CONCURRED BY: 1 8.85
CONTRACTOR 1 UNIT cu.m.

EVALUATED BY:

JADE J. BAGTASOS
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : CHECK & TO LS/MAIN CANAL
STATION : 3 + 104
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT


TURNOUT SECTION C-C: Cut of wall

1.00
0.2 Area = Areawhole - Area shaded
Area Whole = 1.00*0.70
0.25 0.65
0.40 Area Shaded = Area square + total area Triangle
0.65 Area Square = 0.20*0.25
0.05
0.25 Area Triangle0 =0 .25*0.25 0.5
0.03125
0.25 Area shaded = 0.08
t= 0.13 Area Total = 0.57
Vol = Area x thickness 0.57 0.13
0.07 1 0.07 cu.m.
Fillet
0.15
0.15 V = 1/2*0.15*0.15*2 0.46
0.0104 1.00 0.01 cu.m.

Flooring

0.46
0.45 Vol = 0.46 x 0.45 x 0.13 1.00
t= 0.13 0.03 0.03 cu.m
Siding
0.20
0.50
0.25 Vol = 0.50 x (0.50 + 0.25) x 0.20 x 0.13 x 2
t= 0.13 0.02
0.02 cu.m
Siding

0.50 Vol = 0.50 x 0.20 0.13 2


0.0260 0.03 cu.m.
0.20
t= 0.13

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 0.16 cu.m


ENGINEER B
SHEET NO. TOTAL QUANTITY
EVALUATED BY:

LIA M. MAYLON
Engineer A
CONCURRED BY: KADER S. MODAPIL 1 0.16 0.16
P.E. / CONTRACTOR SIDE 2 UNIT cu.m

EVALUATED BY:

LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Drainage Crossing/MAIN CANAL
STATION : 3 + 104
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT


Check Flooring
1.65

0.64 Vol = 1.65 0.64 0.13


0.14 0.14 cu.m
t= 0.13

0.66

0.20 Footwalk
Vol = 0.66 0.20 0.10
0.01 0.01 cu.m.
t= 0.10
Siding
1.65 Vol = Vol(siding)*2 - V(groove)*2- Vcheck

0.66 Vol. =( (1.65 x 0.66) - (0.61 x 0.66) x 1) -(0.25 x 0.40) x 0.12


t= 0.12 0.06 0.06 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub- total 0.21 cu.m.


ENGINEER B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 2 TOTAL QUANTITY 0.37 0.37
P.E. / CONTRACTOR SIDE 2 UNIT cu.m.

EVALUATED BY:

LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : CHECK & TO LS/MAIN CANAL
STATION : 3 + 104
PAY ITEM : STRUCTURE EXCAVATION/BACKFILL

SKETCH COMPUTATION QTY. UNIT


STRUCTURE EXCAVATION STRUCTURE BACKFILL

A3 0.30
A2
1.06
A1 A2 0.46 1.06 0.46
A1

A3 0.3

0.45 0.43 0.45


EXCAVATION:

V1 = A1 x H1
H2=H3 V1 = 1.06 0.43 0.65 0.30 cu.m.
H1 V2 = A2 x H2
V1 = 0.46 0.45 0.50 0.10 cu.m.

BACKFILL:

V1 = A1 x H1
H1 = 0.65 m. A1= 0.48 - 0.0598 0.42
H2 = 0.50 m. V1 = 0.42 x 0.65 0.27 cu.m.
H3 = 0.50 m. V2 = A3 x H3 x 2
V2+V3 = 0.00 0.45 0.5 2.00 0.21 cu.m.

V excavation = 0.40 cu.m.


V backfill = 0.48 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total


ENGINEER B
SHEET NO.
EVALUATED BY:

LIA M. MAYLON
Engineer A
CONCURRED BY: KADER S. MODAPIL 2
P.E. / CONTRACTOR SIDE 2

EVALUATED BY:

LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : CHECK & T.O./MAIN CANAL
STATION : 3 + 164
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT


TURNOUT SECTION C-C: Cut of wall

1.15
0.35 Area = Areawhole - Area shaded
Area Whole = 1.15*0.75
0.35 0.86
0.40 Area Shaded = Area square + total area Triangle
0.75 Area Square = 0.35*0.35
0.12
0.35 Area Triangle0 =0 .35*0.35 0.5
0.06125
0.35 Area shaded = 0.18
t= 0.13 Area Total = 0.68
Vol = Area x thickness 0.68 0.13
0.0882375 2 0.18 cu.m.
Fillet
0.15
0.15 V = 1/2*0.15*0.15*2 0.61
0.0137 2.00 0.03 cu.m.

Flooring

0.61
0.8 Vol = 0.61 x 0.80 x 0.13 2.00
t= 0.13 0.13 0.13 cu.m
Siding
0.30
0.52
0.35 Vol = 0.50 x (0.52 + 0.35) x 0.30 x 0.13 x 4
t= 0.13 0.07

0.07 cu.m

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 0.40 cu.m


ENGINEER B
SHEET NO. TOTAL QUANTITY
CONCURRED BY: KADER S. MODAPIL 1
P.E. / CONTRACTOR SIDE 2 UNIT cu.m

EVALUATED BY:

LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Drainage Crossing/MAIN CANAL
STATION : 3 + 164
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT


Siding

0.52 Vol = 0.52 x 0.50 0.13 4


0.1352 0.14 cu.m.
0.50
t= 0.13
0.61 FootWalk

0.3 Vol = 0.61 0.3 2


0.11 0.11 cu.m

t= 0.10
cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub- total 0.25 cu.m.


ENGINEER B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 2 TOTAL QUANTITY 0.65 0.65
P.E. / CONTRACTOR SIDE 2 UNIT cu.m.

EVALUATED BY:

LIA M. MAYLON
Engineer A
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-11092018-577
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Drainage Crossing/MAIN CANAL
STATION : 3 + 164

SKETCH COMPUTATION QTY. UNIT


STRUCTURE EXCAVATION STRUCTURE BACKFILL

A3 0.30
A2
1.75
A1 A2 1.21 1.75 0.61
A1

A3 0.30

0.8 0.43 0.8


EXCAVATION:

V1 = A1 x H1
0.52 V1 = 1.75 x 0.43 x 0.75 2 1.13 cu.m.
H1 V2 = A2 x H2
V1 = 1.21 x 0.80 x 0.52 2 1.01 cu.m.
2.14
BACKFILL:

V1 = A1 x H1
H1 = 0.75 m. A1= 0.75 - 0.08 = 0.67
H2 = 0.52 m. V1 = 0.67 x 0.75 2 1.01 cu.m.
V3 = A3 x H3
V3 = 0.30 x 0.80 x 0.52 x 2 0.25 cu.m.
1.26 cu.m.

Vol Excavate= 2.14 cu.m.


COMPUTED BY: MARIVIC B. ZAMORANOS Vol Backfill= 1.26 cu.m.
ENGINEER B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 1
P.E. / CONTRACTOR SIDE 1

EVALUATED BY:

LIA M. MAYLON
Engineer A
MASTERLIST
LOWER SIBUGUEY II RIS EXTENSION PROJECT - CY 2016 REMAINING WORKS Package 3
NIAREG9-03102020-676 LINEPROGRAMS-EXTENSION
2nd PROGRESS BILLING

HDPE Common Common Structure Structure Embankment


Reinforced Boulder
STATIONING Length Length 355mmØ RSB Excavatio Backfill Excavatio Backfill (Haul
Gravel Concrete 3000 Psi Plain Bedding
ITEM OF WORK Name of Canal with n (cu.m) (cu.m) n (cu.m) (cu.m) Borrow)
Bedding Piles Concrete
accessories
(ln.m.)
(pc)
Inlet Outlet ( m. ) ( m. ) kgs. Mech. Mech. Manual Manual cu.m cu.m
PACKAGE 3
CANALIZATION
Prop. Pipeline HDPE Lateral C 2 + 981.00 3 + 178.00 197.00
Lateral C 2 + 960.00 3 + 178.00 218.00 47.96 774.00 1.22 281.85 372.68 5,046.08
Lateral C 3 + 201.75 3 + 317.75 116.00 21.60 197.14
Prop. Pipeline HDPE Lateral C 3 + 317.75 3 + 338.75 21.00
Lateral C 3 + 201.75 3 + 572.75 371.00 1,420.00 0.09 24.51 6,581.21

Sub - Total 371.00 552.00 69.56 - 2,194.00 1.31 306.36 569.82 - - 11,627.29
CANAL STRUCTURE
Drainage Crossing Lateral C 3 + 140.00
Prop. Road Crossing Lateral C 3 + 178.00 3 + 201.75 23.75
Drainage Crossing Lateral C 3 + 220.00
Sub - Total 23.75 - - - - - - - - - - -
GRAND-TOTAL 371.00 575.75 69.56 - 2,194.00 1.31 306.36 569.82 - - - - 11,627.29

Prepared by: Concurred by; Reviewed by; Approved by:

RODEL J. YUNTING MARIA GERTRUDES P. GANIA GIRLIE M. DETALLA


Project In-charge Contractor Supervising Engineer A Acting Division Manager
MASTERLIST
LOWER SIBUGUEY II RIS EXTENSION PROJECT - CY 2016 REMAINING WORKS Package 3
NIAREG9-03102020-676 LINEPROGRAMS-EXTENSION
VARIATION ORDER NO.-1

Reinforced
HDPE Common Common Structure Structure Embankment
Concrete Boulder
STATIONING Length Length 355mmØ RSB Excavatio Backfill Excavatio Backfill (Haul
Gravel Piles 3000 Psi Plain Bedding
ITEM OF WORK Name of Canal with n (cu.m) (cu.m) n (cu.m) (cu.m) Borrow)
Bedding ( 0.20 x Concrete
accessories
0.20 x 6.0)
(pc)
(ln.m.)
Inlet Outlet ( m. ) ( m. ) kgs. Mech. Mech. Manual Manual cu.m cu.m
PACKAGE 3
CANALIZATION
Prop. Pipeline HDPE Lateral C 2 + 981.00 3 + 178.00 197.00 66.00
Lateral C 2 + 960.00 3 + 178.00 218.00 47.96 774.00 1.22 281.85 372.68 324.72 5,046.08
Lateral C 3 + 201.75 3 + 317.75 116.00 25.64 39.00 199.21 173.59
Prop. Pipeline HDPE Lateral C 3 + 317.75 3 + 338.75 21.00 7.00
Lateral C 3 + 201.75 3 + 216.75 15.00 54.00 0.09 24.51
Lateral C 3 + 216.75 3 + 217.75 1.00 54.00 0.09 24.51
Lateral C 3 + 217.75 3 + 572.75 355.00 1,278.00 2.02 447.29
Lateral C 3 + 201.75 3 + 572.75 371.00 8,804.27

Sub - Total 371.00 552.00 73.60 112.00 2,160.00 3.42 778.16 571.89 498.31 - 13,850.35
CANAL STRUCTURE
Drainage Crossing Lateral C 3 + 140.00 2.16 7.11 310.46 2.98 8.85
Prop. Road Crossing Lateral C 3 + 178.00 3 + 201.75 23.75 6.71 8.00 2.44 85.01 45.56 34.29 20.52
Drainage Crossing Lateral C 3 + 220.00 2.16 7.14 310.46 2.98 8.85
Sub - Total 23.75 11.03 8.00 - 16.69 705.93 - - 51.52 34.29 38.22 -
GRAND-TOTAL 371.00 575.75 84.63 120.00 2,160.00 20.11 1,484.09 571.89 498.31 51.52 34.29 38.22 13,850.35

Prepared by: Concurred by; Reviewed by; Approved by:

RODEL J. YUNTING MARIA GERTRUDES P. GANIA GIRLIE M. DETALLA


Project In Charge Contractor Supervising Engineer A Acting Division Manager
MASTERLIST
LOWER SIBUGUEY II RIS EXTENSION PROJECT - CY 2016 REMAINING WORKS Package 3
NIAREG9-03102020-676 LINEPROGRAMS-EXTENSION
VARIATION ORDER NO.-1

HDPE Common Common Structure Structure Embankment


Reinforced Boulder
STATIONING Length Length 355mmØ RSB Excavatio Backfill Excavatio Backfill (Haul
Gravel Concrete 3000 Psi Plain Bedding
ITEM OF WORK Name of Canal with n (cu.m) (cu.m) n (cu.m) (cu.m) Borrow)
Bedding Piles Concrete
accessories
(ln.m.)
(pc)
Inlet Outlet ( m. ) ( m. ) kgs. Mech. Mech. Manual Manual cu.m cu.m
PACKAGE 3
CANALIZATION
Prop. Pipeline HDPE Lateral C 2 + 960.00 3 + 178.00 218.00 47.96 73.00 774.00 1.22 281.85 372.68 324.72 5,046.08
Prop. Pipeline HDPE Lateral C 3 + 201.75 3 + 317.75 116.00 25.64 39.00 199.21 173.59
Lateral C 3 + 201.75 3 + 572.75 371.00 54.00 0.09 24.51 8,804.27

Sub - Total 371.00 334.00 73.60 112.00 828.00 1.31 306.36 571.89 498.31 - 13,850.35
CANAL STRUCTURE
Drainage Crossing Lateral C 3 + 140.00 2.16 7.11 310.46 2.98 8.85
Prop. Road Crossing Lateral C 3 + 178.00 3 + 201.75 23.75 4.56 8.00 1.81 70.22 32.65 49.66 18.24
Drainage Crossing Lateral C 3 + 220.00 2.16 7.14 310.46 2.98 8.85
Sub - Total 23.75 8.88 8.00 - 16.06 691.14 - - 38.61 49.66 35.94 -
GRAND-TOTAL 371.00 357.75 82.48 120.00 828.00 17.37 997.50 571.89 498.31 38.61 49.66 35.94 13,850.35

Prepared by: Concurred by; Reviewed by; Approved by:

RODEL J. YUNTING MARIA GERTRUDES P. GANIA GIRLIE M. DETALLA


Supervising Engineer A Contractor Supervising Engineer A Acting Division Manager
BAR CHART / S-CURVE
FINANCIAL ACCOMPLISHMENT
VARIATION ORDER NO. 1
NAME OF PROJECT: Lower Sibuguey II RIS Extension Project-Package 3
LOCATION: Siay, Zamboanga Sibugay
CONTRACT: NIAREG9-03102020-676
Contractor: Lakewood Construction Company

NTP : JUNE 19, 2020 EXPIRY DATE: JAN. 24, 2021


220 CALENDAR DAYS
NO. DESCRIPTION QTY UNIT TOTAL AMOUNT % WT PARTICULARS JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY
12.00 31.00 31.00 30.00 31.00 30.00 31.00 24.00
5.00 7.00 7.00 7.00 2.00 4.00 3.00
99.85% 99.99%
98.91%
TEMPORARY WORKS, PROJECTED 0.21% 0.30% 0.30% 0.30% 0.08% 0.17% 0.13%
CONSTRUCTION PLANT,
1 1.00 L.S P 325,000.00 1.48%
MOBILIZATION OF CONSTRUCTION
EQUIPMENT & DEMOBILIZATION ACTUAL
93.17%

2 CANALIZATION 6 10 7 7 7 9 7 7 7 10 7 7 7 9 7 5

PROJECTED 0.016% 0.027% 0.019% 0.019% 0.019% 0.024% 0.019% 0.019% 0.019% 0.027% 0.019% 0.019% 0.019% 0.024% 0.019% 0.013% 87.02%
2.1 COMMON EXCAVATION (Mech.) 571.89 cu.m P 69,701.95 0.32%
ACTUAL 8 6

PROJECTED 0.16% 0.12%


2.2 COMMON BACKFILL (Mech.) 498.31 cu.m P 60,734.02 0.28% 80.12%
ACTUAL

EMBANKMENT CONSTRUCTION 75.12%


2.3
AND COMPACTION
5 10 7 7 7 10 7 7 7 9 7 7 7 10 7 7 7 9 7 7 7 10 7 7 3

PROJECTED 1.27% 2.53% 1.77% 1.77% 1.77% 2.53% 1.77% 1.77% 1.77% 2.28% 1.77% 1.77% 1.77% 2.53% 1.77% 1.77% 1.77% 2.28% 1.77% 1.77% 1.77% 2.53% 1.77% 1.77% 0.76%
2.3.a HAUL BORROW 13,850.35 cu.m P 10,264,909.90 46.88% 69.09%
ACTUAL 7 9 7 7 7 10 7 7 7 9 7 5

REINFORCED CONCRETE PILES PROJECTED 1.58% 2.04% 1.58% 1.58% 1.58% 2.26% 1.58% 1.58% 1.58% 2.04% 1.58% 1.13%
2.4 2,160.00 ln.m P 4,408,041.60 20.13% 62.91%
(0.20mx0.20mx6m)
ACTUAL 7 7 7 7 9 7 7 7 2

PROJECTED 0.04% 0.04% 0.04% 0.04% 0.05% 0.04% 0.04% 0.04% 0.01%
2.5 GRAVEL BEDDING 73.60 cu.m P 68,381.76 0.31%
ACTUAL 7 7 9 7 7 7 10 7 7
54.96%
PROJECTED 2.77% 2.77% 3.56% 2.77% 2.77% 2.77% 3.95% 2.77% 2.77%
2.6 HDPE 355mm DIA. W/ ACCESSORIES 112.00 pcs P 5,887,866.88 26.89%
ACTUAL
48.78%
2.7 CONCRETE 5 10

CLASS A CONCRETE (3000 PSI) PROJECTED 0.05% 0.10%


2.7.a 3.42 cu.m P 31,931.95 0.15%
PLAIN CONCRETE 42.60%
ACTUAL

PROJECTED 39.19% 2.00 2.00


2.7.b RSB (REINFORCING STEEL BARS) 778.16 kgs P 65,528.85 0.30%
ACTUAL 0.15% 0.15%
III CANAL STRUCTURES 34.33%
2.00 2.00

PROJECTED
30.96% 0.03% 0.03%
3.1 STRUCTURE EXCAVATION (Manual) 51.52 cu.m P 12,308.12 0.06%
ACTUAL 27.58% 3 3

PROJECTED 24.21% 0.02% 0.02%


3.2 STRUCTURE BACKFILL (MANUAL) 34.29 cu.m P 7,540.37 0.03%
ACTUAL 5 2
19.87%
PROJECTED 0.04% 0.02%
3.3 GRAVEL BEDDING 11.03 cu.m P 13,093.82 0.06%
ACTUAL 16.49% 5 5
14.69%
PROJECTED 12.89% 0.095% 0.095%
3.4 BOULDER BEDDING 38.22 cu.m P 42,134.87 0.19%
ACTUAL 10.33% 5 4
8.54%
PROJECTED 1.07% 0.86%
3.5 HDPE 355mm DIA. W/ ACCESSORIES 8.00 pcs P 423,280.00 1.93% 6.77%
ACTUAL 4.99%
3.6 CONCRETE STRUCTURES 2.46% 5 4
0.51% 0.81% 1.11%
0.00% 0.21%
CLASS A CONCRETE (3000 PSI) PROJECTED 0.39% 0.32%
3.6.a 16.69 cu.m P 156,417.51 0.71%
PLAIN CONCRETE
ACTUAL 2.00 2.00

PROJECTED 0.14% 0.14%


3.6.b RSB (REINFORCING STEEEL BARS) 705.93 kgs P 59,862.86 0.27%
ACTUAL
TOTAL DIRECT COST P 21,896,734.46 99.99%

PROJECTED 111,110.29 980,459.68 1,729,533.89 2,474,705.61 3,281,591.03 5,193,549.54 5,280,237.23 2,835,016.46


FINANCIAL ACCOMPLISHMENT (Php)
ACTUAL

PROJECTED 111,110.29 1,091,569.97 2,821,103.85 5,295,809.46 8,577,400.50 13,770,950.03 19,051,187.26 21,886,203.72


CUMULATIVE FINANCIAL ACCOMPLISHMENT (Php)
ACTUAL

Prepared / Submitted by: Checked by: Reviewed by: Approved by:

RODEL J. YUNTING MARIA GERTRUDES P. GANIA GIRLIE M. DETALLA


CONTRACTOR PIC Supervising Engineer A Acting Division Manager
BAR CHART / S-CURVE
PHYSICAL ACCOMPLISHMENT
VARIATION ORDER NO. 1
NAME OF PROJECT: Lower Sibuguey II RIS Extension Project-Package 3
LOCATION: Siay, Zamboanga Sibugay
CONTRACT: NIAREG9-03102020-676
Contractor: Lakewood Construction Company

NTP : JUNE 19, 2020 EXPIRY DATE: JAN. 24, 2021


220 CALENDAR DAYS
NO. DESCRIPTION QTY UNIT TOTAL AMOUNT % WT PARTICULARS JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY
12.00 31.00 31.00 30.00 31.00 30.00 31.00 24.00
5.00 7.00 7.00 7.00 2.00 4.00 3.00

TEMPORARY WORKS, PROJECTED 0.212% 0.297% 0.297% 0.297% 0.085% 0.170% 0.127%
99.89% 100.00%
CONSTRUCTION PLANT,
1 1.00 L.S P 325,000.00 1.484%
MOBILIZATION OF CONSTRUCTION
EQUIPMENT & DEMOBILIZATION ACTUAL
2 CANALIZATION 6 10 7 7 7 9 7 7 7 10 7 7 7 9 7 5
93.99%

PROJECTED 0.016% 0.027% 0.019% 0.019% 0.019% 0.024% 0.019% 0.019% 0.019% 0.027% 0.019% 0.019% 0.019% 0.024% 0.019% 0.013%
2.1 COMMON EXCAVATION (Mech.) 571.89 cu.m P 69,701.95 0.318%
ACTUAL 8 6

PROJECTED 0.158% 0.119%


86.06%
2.2 COMMON BACKFILL (Mech.) 498.31 cu.m P 60,734.02 0.277%
ACTUAL

EMBANKMENT CONSTRUCTION
2.3
AND COMPACTION
5 10 7 7 7 10 7 7 7 9 7 7 7 10 7 7 7 9 7 7 7 10 7 77.72% 7 3

PROJECTED 1.267% 2.534% 1.774% 1.774% 1.774% 2.534% 1.774% 1.774% 1.774% 2.281% 1.774% 1.774% 1.774% 2.534% 1.774% 1.774% 1.774% 2.281% 1.774% 1.774% 1.774% 2.534% 1.774% 1.774% 0.760%
2.3.a HAUL BORROW 13,850.35 cu.m P 10,264,909.90 46.879%
ACTUAL 7 9 7 7 7 10 7 7 7 9 7 5

REINFORCED CONCRETE PILES PROJECTED 1.583% 2.036% 1.583% 1.583% 1.583% 2.262% 1.583% 1.583% 1.583% 2.036% 1.583% 1.131%
2.4 2,160.00 ln.m P 4,408,041.60 20.131%
(0.20mx0.20mx6m)
ACTUAL 7 7 7 7 9 7 7 7 2 67.70%

PROJECTED 0.036% 0.036% 0.036% 0.036% 0.047% 0.036% 0.036% 0.036% 0.010%
2.5 GRAVEL BEDDING 73.60 cu.m P 68,381.76 0.312%
ACTUAL 7 10 7 7 7
60.48%
PROJECTED 4.953% 7.076% 4.953% 4.953% 4.953%
2.6 HDPE 355mm DIA. W/ ACCESSORIES 112.00 pcs P 5,887,866.88 26.889%
ACTUAL 57.21%
2.7 CONCRETE 5 10
53.80%
CLASS A CONCRETE (3000 PSI) PROJECTED 0.049% 0.097%
2.7.a 3.42 cu.m P 31,931.95 0.15%
PLAIN CONCRETE
ACTUAL 49.41%

PROJECTED 2.00 2.00


2.7.b RSB (REINFORCING STEEL BARS) 778.16 kgs P 65,528.85 0.299% 46.00%
ACTUAL 0.150% 0.150%
III CANAL STRUCTURES 42.59%
2.00 2.00

PROJECTED 39.18% 0.028% 0.028%


3.1 STRUCTURE EXCAVATION (Manual) 51.52 cu.m P 12,308.12 0.056%
ACTUAL 3 3

PROJECTED
34.32% 0.017% 0.017%
3.2 STRUCTURE BACKFILL (MANUAL) 34.29 cu.m P 7,540.37 0.034%
ACTUAL 30.95% 5 2

PROJECTED 0.043% 0.017%


3.3 GRAVEL BEDDING 11.03 cu.m P 13,093.82 0.060% 27.57%
ACTUAL 5 5
24.20%
PROJECTED 0.096% 0.096%
3.4 BOULDER BEDDING 38.22 cu.m P 42,134.87 0.19%
ACTUAL 5 4
19.86%
PROJECTED 1.074% 0.859%
3.5 HDPE 355mm DIA. W/ ACCESSORIES 8.00 pcs P 423,280.00 1.933%
16.48%
ACTUAL
14.69%
3.6 CONCRETE STRUCTURES 5 4
12.89%
CLASS A CONCRETE (3000 PSI) PROJECTED 10.33% 0.397% 0.317%
3.6.a 16.69 cu.m P 156,417.51 0.714%
PLAIN CONCRETE 8.54%
ACTUAL 2.00 2.00
6.77%
PROJECTED 4.99% 0.137% 0.137%
3.6.b RSB (REINFORCING STEEEL BARS) 705.93 kgs P 59,862.86 0.273%
ACTUAL 2.46%
TOTAL DIRECT COST P 21,896,734.46 100.00% 0.51% 0.81% 1.11%
0.00% 0.21%
PROJECTED 0.212% 0.297% 0.297% 0.297% 1.352% 2.534% 1.774% 1.774% 1.790% 2.56% 1.793% 1.793% 3.376% 4.340% 3.376% 3.376% 3.376% 4.859% 3.412% 3.412% 3.412% 4.387% 3.412% 3.269% 7.223% 10.015% 8.334% 7.921% 5.900% 0.127%
PHYSICAL ACCOMPLISHMENT (%)
ACTUAL

PROJECTED 0.212% 0.509% 0.810% 1.107% 2.459% 4.993% 6.770% 8.544% 10.334% 12.894% 14.687% 16.480% 19.856% 24.196% 27.572% 30.948% 34.324% 39.183% 42.590% 46.002% 49.410% 53.797% 57.210% 60.479% 67.701% 77.716% 86.060% 93.990% 99.890% 100.00%
CUMULATIVE PHYSICAL ACCOMPLISHMENT (%)
ACTUAL

Prepared / Submitted by: Checked by: Reviewed by: Approved by:

RODEL J. YUNTING MARIA GERTRUDES P. GANIA GIRLIE M. DETALLA


CONTRACTOR PIC Supervising Engineer A Acting Division Manager
MASTERLIST OF WORK ITEM
ILISAN SIP CY 2020
Alicia, Zamboanga Sibugay

3000 Psi 3000 Psi Common Structure Structure Structure


2400 Psi Side Borrowfor Rock Structure Backfill 3000 Psi Plain Concrete
STATIONING Length Reinforced Reinforced Excavation RCP Excavation Backfill ( Excavation
ITEM OF WORK Name of Canal Reinforced backfill (cu.m) Excavation ( cu.m. ) Concrete Demolition
Concrete Concrete ( cu. m. ) ( cu.m. ) cu.m. ) ( cu.m. )
Concrete
(Major) (Minor)
Inlet Outlet ( m. ) Manual Manual 61 cm dia. Mech. Mech. Mech. Manual Manual cu.m. cu.m.
1 CANALIZATION
Bench Flume Main Canal 2+844.00 3+104.00 260.00 54.32 #NAME? #NAME?
Bench Flume Main Canal 3+104.00 3+164.00 60.00 12.56 #NAME? #NAME?
Bench Flume Main Canal 3+164.00 3+324.00 160.00 28.25 #NAME? #NAME?
Bench Flume Main Canal 3+324.00 3+464.00 140.00 29.26 #NAME? #NAME?
Bench Flume Main Canal 3+580.00 3+604.00 24.00 5.02 170.70 383.14
Sub - total = 1,118.00 129.41 #NAME? #NAME?

2 CANAL STRUCTURES
Prop. Cut & Cover Main Canal 2 + 774 2 + 844 70.00 36.27 0.19 #REF! #REF!

Prop. Check & Turn Out Ls Main Canal 3 + 104 0.16 0.40 0.48

Prop. Drainage Crossing Main Canal 3 + 144 - 2.98 Err:509

Prop. Check & Turn Out Ls Main Canal 3 + 164 0.65 2.14 1.26

Prop. Overchute Main Canal 3 + 204 1.44 3.52 2.08

Prop. Drainage Crossing Main Canal 3 + 324 #REF! 2.00 #REF! #REF!

Main Canal 3 + 464 3 + 580 116.00 36.08 0.73 69.36 21.42 3.13 1.99
Prop. Elev. Flume comb. TO L/S & R/S
Prop. Cut & Cover Main Canal 3 + 604 3 + 724 120.00 12.09 Err:509

Sub - total = 306.00 84.43 #REF! 2.00 #REF! #REF! #REF! Err:509
3 ROADS
2.63 2.63

TOTAL 129.41 84.43 #REF! #NAME? #NAME? 2.00 #REF! #REF! #REF! Err:509 2.63 2.63

1,424.00 84.43 #REF! #NAME? #NAME? 2.00 -


TOTAL #REF! #REF! #REF! Err:509 2.63 2.63

Prepared by: Checked by : Recommending Approval: Approved:

MARIVIC B. ZAMORANOS MARIA GERTRUDES P. GANIA NANCY A. POLIRAN GIRLIE M. DETALLA


Engineering Assistant A Supervising Engineer A Sr. IDO Acting Division Manager
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Overchute/Main Canal
STATION : 3 + 204
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT


Flooring
2.00 V= LxWxt
V= 2.00 0.88 0.10
= 0.176
0.88

t= 0.10 0.176 cu.m.


Flooring
1.00 A = 1/2(a+b) x h
V=AxT
A= 0.5 2.96 0.86
2.08 0.88 1.27
V= 1.27 x 0.10 2 0.25 cu.m.
Siding
4 V= LxWxt
0.4 V= 4.00 0.40 0.14 2.00
= 0.45
0.45 cu.m
Abutment
0.13
V= LxWxt
V1= 0.13 0.30 0.88
0.30 = 0.03
V= LxWxt
0.20 V2= 0.39 0.20 0.88
= 0.07
0.39 Vt= v1 + v2 x 2.00
t= 0.88
0.20 cu.m.
COW (C-C)
0.60 Area = Area whole - Area shaded
1.80
AREA= 1.20 x 2.08
0.60 = 2.50
1.20 Area=1/2 x (X1 + X2) x Length
Area trap. 0.5 2.40 0.60
0.60 = 0.72
Area tri. 0.50 0.60 0.60 2.00
, 0.45 = 0.36
2.08 Area = Area whole - (Area trap. + Area tri.)
Total Area= 2.50 - 1.08
= 1.42
Vol.= 1.42 x 0.13
t = 0.14 = 0.18 x 2.00 0.36 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total


Engineer B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 1 TOTAL 1.44 cu.m.
P.E. Contractor - Side 1
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-01222019-599
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Overchute/Main Canal
STATION : 3 + 204
PAY ITEM : 3000 psi Reinforced Concrete

SKETCH COMPUTATION QTY. UNIT

400

14 14

60 60

BEN CH FLUME

EXCAVATION:

V = Total Area x Width


V= 1.78 x 1.98 3.52 cu.m.

BACKFILL:

Vbackfill = Vexcavation - Vconcrete


Vexcavation = 3.52
Vconcrete = 1.44

Volume = 3.52 - 1.44 2.08 cu.m.

V excavation = 3.52 cu.m.


V backfill = 2.08 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total


Engineer B
SHEET NO.
CONCURRED BY: KADER S. MODAPIL 2
P.E. Contractor - Side 2
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-11092018-577
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Elevated Flume/MAIN CANAL
STATION : 1 + 828 - 1 + 888
PAY ITEM : 3000 psi Reinforced Concrete
SKETCH COMPUTATION QTY. UNIT
FLUME Vol = Area(Flume) x Length

AREAS
A. 0.14 x 0.35 0.05
0.14 0.14 B. 0.14 x 0.35 0.05
C. 0.12 x 0.40 0.05
0.35 0.15
0.35 A B

Vol = 0.15 x 38.00


C
0.12 Vol= 5.55
0.40
L=38m 5.55 cu.m.
FLUME SEAT
0.88 Area = 0.88 x 0.40
0.68 = 0.35

0.10 Area rec.= 0.68 x 0.10


= 0.07
0.15 Area tri.= 0.15 0.29 2.00 0.50
0.40 = 0.04
0.15
0.34 Total Area = 0.35 - 0.11
0.2 = 0.24
Vol = total area x thickness x no. of flume seat
no. of flume seat = 7 pcs. Vol = 0.24 0.25 7
thickness =0.25 Vol = 0.42 0.42 cu.m.
FOOTWALK
0.20 Vol = Area x thickness x no. foot walk
no.of foot walk=13 Vol = 0.02 0.15 20
0.1 Vol = 0.060

t = 0.15 0.060 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS Sub-total 6.03 cu.m.


Engineering Assistant A
SHEET NO.
CHECKED BY: MARIA GERTRUDES P. GANIA 2
Supervising Engineer A 3
QUANTITY COMPUTATION SHEET
VARIATION ORDER NO. 1
ILISAN SIP
ALICIA, ZAMBOANGA SIBUGAY
CONTRACT NO. NIAREG9-11092018-577
NAME OF CONTRACTOR: LONG ISLAND BUILDRES & CONSTRUCTION
NAME OF STRUCTURE/CANAL : Elevated Flume/MAIN CANAL
STATION : 1 + 828 - 1 + 888
PAY ITEM : STRUCTURE EXCAVATION & STRUCTURE BACKFILL
SKETCH

Hatched Area = 14.21 sq.m.


W = 2.2 m. Vol. = 14.21 x 2.20 = 31.26 cu.m.
Hatched Area = 10.59 sq.m.
W = 2.20 m.
Vol .= 10.59 x 2.20 = 23.30 cu.m.

COMPUTED BY: MARIVIC B. ZAMORANOS


Engineering Assistant A
SHEET NO.
CHECKED BY: MARIA GERTRUDES P. GANIA 2
Supervising Engineer A 3