PROVINCE OF PAMPANGA
City of San Fernando
OFFICE OF THE PROVINCIAL ENGINEER
PROGRAM OF WORK
NUMBER
Description of Work to be done % Wt. Equipment Description
Needed Available
PROVISION OF FIELD OFFICE FOR THE ENGINEER (Rental Basis) 0.44 Elf Tuck 1
PROJECT BILLBOARD / SIGNAGE 0.03 Lowber Trailer with 1
OCCUPATIONAL SAFETY AND HEALTH PROGRAM 0.40 Prime Mover
TRAFFIC MANAGEMENT 1.66 Pay Loader 1
MOBILIZATION / DEMOBILIZATION 0.29 Dump Truck 1
INDIVIDUAL REMOVAL OF TREES 0.11 Backhoe with Breaker 1
REMOVAL OF ACTUAL STRUCTURES / OBSTRUCTION (PCCP) 0.47 Road Grader 1
STRUCTURE EXCAVATION (Common Soil) 2.26 Road Roller 1
EMBANKMENT 0.43 Concrete Saw 1
CRACK AND SEAT 1.57 Bar Bender 1
AGGREGATE SUBBASE COURSE 6.26 Water Truck 2
PCC PAVEMENT, 250mm thk. (RMC 3500psi at 14 days) 31.22 Concrete Screeder with 1
STRUCTURAL CONCRETE 24.81 Vibrator
Sub-Total for A P
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment
Sub-Total for B P
C. Total ( A + B ) P
D. Output per Hour = 1.00 month
E. Di rect U nit Cost ( C ÷ D ) P
Name and Specifications Quantity Unit Unit Cost Amount
F. Materials
(Rental Basis)
Re ntal of te mpora ry fiel d office w ith co mfo rt 1 month P 17,500.00 P 17,500.00
roo m, 1 a ir con ditio n u nit, water supp ly an d
Sub-Total for B P
C. Total ( A + B ) P 115.00
D. Output per Hour = 1.00 each
E. Di rect U nit Cost ( C ÷ D ) P 115.00
Name and Specifications Quantity Unit Unit Cost Amount
F. Materials
8"x8" Tarpaulin 1.00 set P 2,000.00 P 2,000.00
8pcs.-2"x3"x8' Form Lumber 32.00 bd.ft. 50.00 1,600.00
Assorted Common Wire Nails 1.00 kgs. 65.00 65.00
Sub-Total for B P
C. Total ( A + B ) P 90,000.00
D. Output per Hour = n/a lump-sum
E. Di rect U nit Cost ( C ÷ D ) P 90,000.00
Name and Specifications Quantity Unit Unit Cost Amount
F. Materials
Safety Shoes 10.00 pairs P 500.00 P 5,000.00
Working Gloves 15.00 pairs 100.00 1,500.00
Safety Helmet 10.00 pcs. 250.00 2,500.00
Safety Vest 10.00 pcs. 200.00 2,000.00
Rubber Boots 5.00 pairs 350.00 1,750.00
Sub-Total for B P
C. Total ( A + B ) P 377,880.00
D. Output per Hour = n/a lump-sum
E. Di rect U nit Cost ( C ÷ D ) P 377,880.00
Name and Specifications Quantity Unit Unit Cost Amount
F. Materials
Tarpaulins/Warning Signs/Bollards 1.00 lot P 20,000.00 P 20,000.00
100pcs.-2"x3"x12' Form Lumber 600.00 bd.ft. 50.00 30,000.00
Assorted CW Nails 20.00 kgs. 65.00 1,300.00
Sub-Total for F P -
G. Direct Cost Unit Cost ( E + F ) P 80,280.00
H. Overhead, Contingencies and Miscellaneous (OCM) 12% of G P
I. Contractor's Profit 8% of G P
J. Value Added Tax (VAT) 5% of (G+H+I) P 4,014.00
K. Total Cost (G+H+I+J) P 84,294.00
PART C: EARTHWORK
Sub-Total for F P -
G. Direct Cost Unit Cost ( E + F ) P 109.92
H. Overhead, Contingencies and Miscellaneous (OCM) 12% of G P 13.19
I. Contractor's Profit 8% of G P 8.79
J. Value Added Tax (VAT) 5% of (G+H+I) P 6.60
K. Total Unit Cost (G+H+I+J) P 138.50
PART C: EARTHWORK
Sub-Total for F P -
G. Direct Cost Unit Cost ( E + F ) P 91.09
H. Overhead, Contingencies and Miscellaneous (OCM) 12% of G P 10.93
I. Contractor's Profit 8% of G P 7.29
J. Value Added Tax (VAT) 5% of (G+H+I) P 5.47
K. Total Unit Cost (G+H+I+J) P 114.78
PART C: EARTHWORK
Sub-Total for F P -
G. Direct Cost Unit Cost ( E + F ) P 237.09
H. Overhead, Contingencies and Miscellaneous (OCM) 12% of G P 28.45
I. Contractor's Profit 8% of G P 18.97
J. Value Added Tax (VAT) 5% of (G+H+I) P 14.23
K. Total Unit Cost (G+H+I+J) P 298.73
PART C: EARTHWORKS
Installation of Formworks
Skilled Laborer 2.00 1.00 65.00 130.00
Unskilled Laborer 4.00 1.00 50.00 200.00
PART C: EARTHWORK
BACK-UP COMPUTATION
TRAFFIC MANAGEMENT
Lump-sum
MOBILIZATION / DEMOBILIZATION
Lump-sum
EMBANKMENT
Volume = 250.00 cubic meters
Prepared by:
RUSSEL L. HERNANDEZ
Engineer III
Republic of the Philippines
PROVINCE OF PAMPANGA
City of San Fernando
OFFICE OF THE PROVINCIAL ENGINEER
REHABILITATION / IMPROVEMENT OF LOURDES - SAN ISIDRO -
PROJECT NAME :
TELACSAN ROAD (LOURDES SECTION)
LOCATION : Lourdes, Minalin, Pampanga
DESCRIPTION : Aggregate Subbase Coarse
FOR ROAD 6.10 METERS WIDE
AVERAGE DISTANCE
STATION CUT / FILL END AREA M2 VOLUME REMARKS
AREA BET. STA.
M2 M M3 Cumulative
0 2.070000
2.075 40.00 83.00 83.00
40 2.080000
2.075 40.00 83.00 166.00
80 2.070000
2.075 40.00 83.00 249.00
120 2.080000
2.080 40.00 83.20 332.20
160 2.080000
2.080 40.00 83.20 415.40
200 2.080000
2.080 40.00 83.20 498.60
240 2.080000
2.080 40.00 83.20 581.80
280 2.080000
2.080 40.00 83.20 665.00
320 2.080000
2.080 40.00 83.20 748.20
360 2.080000
2.080 40.00 83.20 831.40
400 2.080000
2.080 40.00 83.20 914.60
440 2.080000
2.080 40.00 83.20 997.80
480 2.080000
2.075 40.00 83.00 1080.80
520 2.070000
2.075 40.00 83.00 1163.80
560 2.080000
2.080 40.00 83.20 1247.00
600 2.080000
2.080 40.00 83.20 1330.20
640 2.080000
2.080 40.00 83.20 1413.40
680 2.080000
2.080 40.00 83.20 1496.60
720 2.080000
2.080 40.00 83.20 1579.80
760 2.080000
2.080 40.00 83.20 1663.00
2.080 40.00 83.20 1663.00
800 2.080000
2.080 40.00 83.20 1746.20
840 2.080000
2.080 40.00 83.20 1829.40
880 2.080000
2.075 40.00 83.00 1912.40
920 2.070000
2.075 40.00 83.00 1995.40
960 2.080000
2.078 40.00 83.10 2078.50
1000 2.075000
1.038 40.00 41.50 2120.00
2120.00
cu.m.
Prepared by:
RUSSEL L. HERNANDEZ
Engineer III
Republic of the Philippines
PROVINCE OF PAMPANGA
City of San Fernando
OFFICE OF THE PROVINCIAL ENGINEER
REHABILITATION / IMPROVEMENT OF LOURDES - SAN ISIDRO -
PROJECT NAME :
TELACSAN ROAD (LOURDES SECTION)
LOCATION : Lourdes, Minalin, Pampanga
DESCRIPTION : Embankment
FOR ROAD 6.10 METERS WIDE
AVERAGE DISTANCE
STATION CUT / FILL END AREA M2 VOLUME REMARKS
AREA BET. STA.
M2 M M3 Cumulative
0 0.230000
0.240 40.00 9.60 9.60
40 0.250000
0.245 40.00 9.80 19.40
80 0.240000
0.245 40.00 9.80 29.20
120 0.250000
0.250 40.00 10.00 39.20
160 0.250000
0.250 40.00 10.00 49.20
200 0.250000
0.250 40.00 10.00 59.20
240 0.250000
0.250 40.00 10.00 69.20
280 0.250000
0.250 40.00 10.00 79.20
320 0.250000
0.250 40.00 10.00 89.20
360 0.250000
0.250 40.00 10.00 99.20
400 0.250000
0.250 40.00 10.00 109.20
440 0.250000
0.250 40.00 10.00 119.20
480 0.250000
0.245 40.00 9.80 129.00
520 0.240000
0.245 40.00 9.80 138.80
560 0.250000
0.250 40.00 10.00 148.80
600 0.250000
0.250 40.00 10.00 158.80
640 0.250000
0.250 40.00 10.00 168.80
680 0.250000
0.250 40.00 10.00 178.80
720 0.250000
0.250 40.00 10.00 188.80
760 0.250000
0.245 40.00 9.80 198.60
0.245 40.00 9.80 198.60
800 0.240000
0.245 40.00 9.80 208.40
840 0.250000
0.245 40.00 9.80 218.20
880 0.240000
0.240 40.00 9.60 227.80
920 0.240000
0.235 40.00 9.40 237.20
960 0.230000
0.218 40.00 8.70 245.90
1000 0.205000
0.103 40.00 4.10 250.00
250.00
cu.m.
Prepared by:
RUSSEL L. HERNANDEZ
Engineer III
B A R C H A R T / S - C U R V E
Project Name : REHABILITATION / IMPROVEMENT OF LOURDES - SAN ISIDRO - TELACSAN ROAD (LOURDES SECTION)
Location : Lourdes, Minalin, Pampanga Chart Title
Project Duration : 196 CALENDAR DAYS
DURATION
ITEM NO.
1st Month 2nd Month 3rd Month 4th Month 5th Month 6th Month 7th Month 8th Month
DESCRIPTION % Wt. ESTIMATED TOTAL
START FINISH
COST WEEKS 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st 32nd
PROVISION OF FIELD OFFICE FOR THE ENGINEER (Rental Basis) 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
A.1.1 (8) 0.44 P 128,625.00 1ST 28TH 28
0.029
B.5 PROJECT BILLBOARD / SIGNAGE 0.03 P 8,573.04 1ST 1ST 1
OCCUPATIONAL SAFETY AND HEALTH PROGRAM 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
B.7 (2) 0.40 P 116,518.50 1ST 28TH 28
0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059
B.8(2) TRAFFIC MANAGEMENT 1.66 P 486,690.12 1ST 28TH 28
0.144 0.144
B.9 MOBILIZATION / DEMOBILIZATION 0.29 P 84,294.00 1ST 28TH 2
REMOVAL OF ACTUAL STRUCTURES / OBSTRUCTION (PCCP) 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053
101(3) b2 0.47 P 138,500.00 12TH 20TH 9
0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188
103(1) a STRUCTURE EXCAVATION (Common Soil) 2.26 P 661,806.44 1ST 12TH 12
0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078 0.078
210 (1) CRACK AND SEAT 1.57 P 459,120.00 5TH 24TH 20
0.391 0.391 0.391 0.391 0.391 0.391 0.391 0.391 0.391 0.391 0.391 0.391 0.391 0.391 0.391 0.391
200(1) AGGREGATE SUBBASE COURSE 6.26 P 1,832,146.40 9TH 24TH 16
PCC PAVEMENT, 250mm thk. (RMC 3500psi at 14 days) 1.952 1.952 1.952 1.952 1.952 1.952 1.952 1.952 1.952 1.952 1.952 1.952 1.952 1.952 1.952 1.952
311(1) d1 31.22 P 9,141,033.00 13TH 28TH 16
1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128
405(1)a2 STRUCTURAL CONCRETE 24.81 P 7,262,478.35 7TH 28TH 22
1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118 1.118
404(1)a REINFORCING STEEL 29.06 P 8,506,567.29 3RD 28TH 26
0.146 0.146
605(6)e1 HAZARD MARKERS CHEVRON SIGNS (450mmx600mm) 0.29 P 85,467.50 27TH 28TH 2
NOTE: PREDETERMINED UNWORKABLE DAYS (ASSUME), HOLIDAYS AND SUNDAYS Project Duration 138 days
S-CURVE WAS BASED ON OUR CALENDAR DAYS INCLUDING SATURDAY AND SUNDAY WHICH HAS 4
WEEKS / MONTH ONLY WITH EQUIVALENT OF 28 DAYS Unworkable Days Unworkable Days Unworkable Days Pre-Determined 29 days
Month Holidays Pre-determined Sundays Month Holidays Pre-determined Sundays Month Holidays Pre-determined Sundays Holidays 9 days
DURATION : 196 CALENDAR DAYS October 1 7 5 January 1 6 5 Sundays 20 days
November 2 6 4 February 1 3 2 Total Calendar Days 196 days
December 4 7 4 *Total Calendar Days = Project Duration + Pre-Determined +
Holidays + Sundays
7 20 13 2 9 7 0 0 0
OTAL HOLIDAYS AND PRE-DETERMINED : 38
TOTAL SUNDAYS : 20
FROM THE OFFICE OF: PROJECT TITLE: PREPARED BY: CHECKED AND SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO.
0 6 6 DAYS
190 196 MOBILIZATION / DEMOBILIZATION
84 140 56 DAYS
140 196 EMBANKMENT
84 98 14 DAYS
182 196 REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS YELLOW
0 28 28 DAYS 84 98 14 DAYS
56 84 INDIVIDUAL REMOVAL OF TREES 182 196 REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS WHITE
0 1 1 DAY 84 98 14 DAYS
83 84 PROJECT BILLBOARD / SIGNAGE 182 196 HAZARD MARKERS CHEVRON SIGNS (450mmx600mm)
A B C
0 63 63 DAYS
133 196 REMOVAL OF ACTUAL STRUCTURES / OBSTRUCTION (PCCP)
ES EF ES - EARLY START
LS LF EF - EARLY FINISHED CRITICAL PATH
LS - LATE START
LS - LATE START
LF - LATE FINISHED
FROM THE OFFICE OF: PROJECT TITLE: PREPARED BY: CHECKED AND SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET No.
HON. DENNIS G. PINEDA
REPUBLIC OF THE PHILIPPINES REHABILITATION / IMPROVEMENT OF Governor
PROVINCE OF PAMPANGA By the Authority of the Governor:
PROVINCIAL ENGINEER'S OFFICE
LOURDES - SAN ISIDRO - TELACSAN ROAD
1
(LOURDES SECTION) RUSSEL L. HERNANDEZ WILFREDO A. MANALILI OLIMPIO M. PANGAN Atty. CHARLIE G. CHUA 1
CAPITOL COMPOUND, STO. NINO, CITY OF SAN FERNANDO, PAMPANGA Lourdes, Minalin, Pampanga Engineer III Acting Assistant Provincial Engineer Provincial Engineer Provincial Administrator
PAVEMENT DESIGN CALCULATION SHEET
FORMULA FOR SOLVING AASHTO 1986/1993 RIGID PAVEMENT DESIGNS
REHABILITATION / IMPROVEMENT OF LOURDES - SAN ISIDRO - TELACSAN ROAD (LOURDES SECTION)
FROM THE OFFICE OF: PROJECT TITLE: PREPARED BY: CHECKED AND SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO.
Hon. DENNIS G. PINEDA
Governor
REHABILITATION / IMPROVEMENT OF By the Authority of the Governor:
REPUBLIC OF THE PHILIPPINES LOURDES - SAN ISIDRO - TELACSAN ROAD
PROVINCE OF PAMPANGA (LOURDES SECTION)
RUSSEL L. HERNANDEZ WILFREDO A. MANALILI OLIMPIO M. PANGAN Atty. CHARLIE G. CHUA 1
PROVINCIAL ENGINEER'S OFFICE Engineer III Provincial Engineer Provincial Administrator
Acting Assistant Provincial
1
CAPITOL COMPOUND, STO. NINO, CSFP Lourdes, Minalin, Pampanga Engineer
Republic of the Phillipines
PROVINCE OF PAMPANGA
City of San Fernando, Pampanga
OFFICE OF THE PROVINCIAL ENGINEER
APPROVED BUDGET FOR THE CONTRACT
Name of Project : REHABILITATION / IMPROVEMENT OF LOURDES - SAN ISIDRO - TELACSAN ROAD (LOURDES SECTION)
Location : Lourdes, Minalin, Pampanga
Contract Duration : 196 Calendar Days
JUSTIFICATION
IMPROVEMENT OF SEPUNG BULAON - BALUBAD - SALU - PULUNG MASLE
Project Name :
ROAD
Location : PORAC, PAMPANGA
Super Elevation
Provided
Shoulder Width
1.00m shoulder width was replaced by reinforced line canal with cover.
Radius Width
Existing Road (Curve).
Longitudinal Grade
Existing longitudinal road grade.
Cross Drains
No cross drains needed.
Line canal on both sides of the road has a river downfall.
Slope Protection
Not necessary R.O.W. 8.00 meters.
Pavement Markings
Provided.
Provision of 4x4 Pick-up Type Service Vehicle for the Engineer on Bare Rental Basis.
Not Necessary.
P.E.O. has sufficient service vehicles for site inspection
RUSSEL L. HERNANDEZ
Project Engineer
Engineer III
Annex A
Republic of the Philippines
PROVINCIAL GOVERNMENT OF PAMPANGA
City of San Fernando, Pampanga
OBLIGATION REQUEST No.
Payee
Office Provincial Engineer's Office
Address Capitol Compound, Sto. Ñino, City of San Fernando, Pampanga
Responsibility
Particulars F.P.P. Account Code Amount
Center
P 29,274,909.64
To supply Labor, Materials and
Necessary Equipment for the
REHABILITATION / IMPROVEMENT OF
LOURDES - SAN ISIDRO - TELACSAN
ROAD (LOURDES SECTION) , Lourdes,
Minalin, Pampanga
OLIMPIO M. PANGAN
Provincial Engineer
TOTAL P 29,274,909.64
A. Certified : B. Certified :
Signature
Printed Name Hon. DENNIS G. PINEDA
Position Governor Printed Name RIMA K. BONDOC
By the Authority of the Governor: Position Provincial Budget Officer
Signature Head, Budget Unit/Authorized Representative
Unit of Estimated
Quantity Item Description Estimated Cost
Issue Unit Cost
Items to be Accomplished:
7240 0.000
0.000 40.00 0.00 2813.63
7280 0.000
0.000 40.00 0.00 2813.63
7320 0.000
0.000 40.00 0.00 2813.63
7360 0.000
0.000 40.00 0.00 2813.63
7400 0.000
0.000 40.00 0.00 2813.63
7440 0.000
0.000 40.00 0.00 2813.63
7480 0.000
0.000 40.00 0.00 2813.63
7520 0.000
0.000 40.00 0.00 2813.63
7560 0.000
0.000 40.00 0.00 2813.63
7600 0.000
8260 Road 3 0.000
0.000 20.00 0.00 2813.63
8280 0.000
0.000 40.00 0.00 2813.63
8320 0.000
0.000 40.00 0.00 2813.63
8360 0.000
0.000 10.00 0.00 2813.63
8370 0.000
AVERAGE DISTANCE
STATION CUT / FILL END AREA M2 VOLUME REMARKS
AREA BET. STA.
M2 M M3 Cumulative
2025 Road 1A 0.000
0.450 40.00 18.00 18.00
0.450 40.00 18.00 18.00
2065 0.900
0.900 40.00 36.00 54.00
2105 0.900
0.900 40.00 36.00 90.00
2145 0.900
0.900 40.00 36.00 126.00
2185 0.900
0.900 40.00 36.00 162.00
2225 0.900
0.900 40.00 36.00 198.00
2265 0.900
0.900 40.00 36.00 234.00
2305 0.900
0.900 40.00 36.00 270.00
2345 0.900
0.900 40.00 36.00 306.00
2385 0.900
0.900 40.00 36.00 342.00
2425 0.900
342.00
cu.m.
cu.m.
Prepared by:
RUSSEL L. HERNANDEZ
Engineer III
1970.4
area
0.915
1735
1610.4
150.625
6000
150
175
206.5
8240
207
400
2655
6,025.00
7,600.00
8,260.00
8,370.00