REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION VIII
SAMAR FIRST DISTRICT ENGINEERING OFFICE
CALBAYOG CITY

C.Y. 2021 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR
001:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS


SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKHA (SM)
(SN ISIDRO - SN JUANICO BR.)
K0695+410 - K0695+505, K0696+701 - K0696+738, K0696+738 - K0696+804
SAMAR

CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - 4,244.28 sq.m.


12.252777, 124.59611

SUBMITTED: RECOMMENDED: APPROVED:

ENRICO N. COBACHA DENIS C. CAGOMOC ALVIN A. IGNACIO


CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: DATE: DATE:
TABLE OF CONTENTS SUMMARY OF QUANTITIES
GENERAL ITEM NO. DESCRIPTION QUANTITY UNIT
A1.1(8) PROVISION OF FIELD OFFICE FOR THE ENGINEER (RENTAL BASIS) 12.20 months
1-4 PROJECT TITLE
Bangon Falls
B.4(1) CONSTRUCTION SURVEY AND STAKING 0.208 km.
2-4 SUMMARY OF QUANTITIES
LOCATION MAP
B.5 PROJECT BILLBOARD/SIGN BOARD 2.00 each
TABLE OF CONTENTS
GENERAL NOTES AND SPECIFICATIONS
B 7.2(2) OCCUPATIONAL SAFETY & HEALTH PROGRAM 1.00 l.s.
3-4 TYPICAL ROAD SLIP PROTECTION SECTION
B 8(1) TRAFFICE MANAGEMENT 12.20 months
CONCRETE BARRIER DETAIL
CONCRETE FOOTING DETAIL B.9 MOBILIZATION/DEMOBILIZATION 1.00 l.s.
4-4 STRAIGHT LINE DIAGRAM 100(1) CLEARING AND GRUBBING 0.07 ha.

100(3)a1 INDIVIDUAL REMOVALL OF TREES (150-300mm dia.), SMALL 167.00 each

103(1)a STRUCTURE EXCAVATION (COMMON SOIL) 559.52 cu.m.

103(3) FOUNDATION FILL 252.60 cu.m.

104(2)a EMBANKMENT FROM BORROW (COMMON SOIL) 18,495.43 cu.m.

200(1) AGGREGATE SUBBASE COURSE 197.34 cu.m.

404(1)a REINFORCING STEEL, GRADE 40 21,422.17 kg.

405(1)a3 STRUCTURAL CONCRETE, 20.68MPa (CLASS A), 28 DAYS 658.20 cu.m.

405(6) STRUCTURAL CONCRETE, PAINTING WORKS 751.68 sq.m.

505(2)a GROUTED RIPRAP, CLASS A 751.99 cu.m. LOCATION MAP


517(1)b DRAIN PIPE (PVC) 156.00 lin.m.

GENERAL NOTES: SPECIFICATIONS:


DIMENSIONS ITEM 404 - REINFORCING STEEL
NO ALLOWANCE WILL BE MADE FOR CLASSIFICATION OF DIFFERENT TYPES OF
A. ALIGNMENT AND GRADES ARE SUBJECT TO ADJUSTMENT TO SUIT EXISTING MATERIAL ENCOUNTERED. THIS ITEM SHALL CONSIST OF FURNISHING, BENDING, FABRICATING AND PLACING DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES & AIRPORTS,
FIELD CONDITIONS. OF STEEL REINFORCEMENT OF THE TYPE, SIZE, SHAPE AND GRADE REQUIRED IN REVISED EDITION 2013
B. DISTANCE AND ELEVATIONS ARE IN METERS UNLESS INDICATED OTHERWISE. ITEM 104 - EMBANKMENT ACCORDANCE WITH THIS SPECIFICATION AND IN CONFORMITY WITH THE
REQUIREMENTS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER.
THIS ITEM SHALL CONSIST OF THE CONSTRUCTION OF EMBANKMENT IN
100.2.3 INDIVIDUAL REMOVAL OF TREES OR STUMPS ACCORDANCE WITH THIS SPECIFICATION AND IN CONFORMITY WITH THE LINES, ITEM 405 - STRUCTURAL CONCRETE
THIS PLAN WILL SERVE ONLY AS A GUIDE IN THE IMPLEMENTATION
GRADES AND DIMENSIONS SHOWN ON THE PLANS OR ESTABLISHED BY
PARTICULARLY IN THE PRE-CONSTRUCTION STAGE. IT IS ALSO SUBJECTED TO AN
INDIVIDUAL TREES OR STUMPS DESIGNATED BY THE ENGINEER FOR REMOVAL ENGINEER. THIS ITEM SHALL CONSIST OF FURNISHING, BENDING, PLACING AND FINISHING
AS-STAKED SURVEY TO BE CONDUCTED JOINTLY BY THE DIRECT IMPLEMENTING
AND LOCATED IN AREAS OTHER THAN THOSE ESTABLISHED FOR CLEARING AND CONCRETE IN ALL STRUCTURES EXCEPT PAVEMENTS IN ACCORDANCE WITH THIS
OFFICE AND THE CONTRACTOR AN SUBSEQUENT PLAN BE PREPARED AND
GRUBBING AND ROADSIDE CLEANUP SHALL BE REMOVED AND DISPOSED OFF AS 104.2 MATERIALS REQUIREMENTS SPECIFICATION AND CONFORMING TO THE LINES, GRADES, AND DIMENSIONS
SUBMITTED FOR APPROVAL.
SPECIFIED UNDER SUBSECTION 100.2.2 EXCEPT TREES REMOVED SHALL BE CUT SHOWN ON THE PLANS. CONCRETE SHALL CONSIST OF A MIXTURE OF PORTLAND
AS NEARLY FLUSH WITH THE GROUND AS PRACTICABLE WITHOUT REMOVING EMBANKMENT SHALL BE CONSTRUCTED OF SUITABLE MATERIALS, IN CONSONACE CEMENT, FINE AGGREGATE, COARSE AGGREGATE, ADMIXTURE WHEN SPECIFIED,
STUMPS. WITH THE FOLLOWING DEFINITIONS: AND WATER MIXED IN THE PROPORTIONS SPECIFIED OR APPROVED BY THE NOTE:
ENGINEER.
ITEM 103 - STRUCTURE EXCAVATION 1. SUITABLE MATERIAL - MATERIAL WHICH IS ACCEPTABLE IN ACCORDANCE THE PAY ITEM NO. IN GENERAL NOTES IS DIFFERENT FROM THE SUMMARY
WITH THE CONTRACT AND WHICH CAN BE COMPACTED IN THE MANNER SPECIFIED ITEM 508 - HAND-LAID ROCK EMBANKMENT OF QUANTITIES SINCE THE DPWH BLUE BOOK REVISED EDITION 2013 AS THE
THIS ITEM SHALL CONSIST OF THE NECESSARY EXCAVATION FOR FOUNDATION OF IN THIS ITEM. IT CAN BE COMMON MATERIAL OR ROCK. BASIS FOR THE GENERAL NOTES IS NOT YET CORRECTED BASED ON THE PAY
BRIDGES, CULVERTS, UNDERDRAINS, AND OTHER STRUCTURES NOT OTHERWISE THIS ITEM SHALL CONSIST OF HAND-LAID ROCK EMBANKMENT, AS DESIGNATED IN ITEM IN D.O. 143 s. OF 2017.
PROVIDED FOR IN THE SPECIFICATIONS. EXCEPT AS OTHERWISE PROVIDED FOR SELECTED BORROW, FOR TOPPING - SOIL OF SUCH GRADATION THAT ALL THE BID SCHEDULE, CONSTRUCTED IN ACCORDANCE WITH THIS SPECIFICATION
PIPE CULVERTS, THE BACKFILLING OF COMPLETED STRUCTURES AND THE PARTICLES WILL PASS A SIEVE WITH 75mm (3 INCHES) SQUARE OPENINGS AND AND IN CONFORMITY WITH THE LINES AND GRADES SHOWN ON THE PLANS OR
DISPOSAL OF ALL EXCAVATED SURPLUS MATERIALS, SHALL BE IN ACCORDANCE NOT MORE THAN 15 MASS PERCENT WILL PASS THE 0.075 mm (No. 200) SIEVE, AS ESTABLISHED BY THE ENGINEER.
WITH THESE SPECIFICATIONS AND IN REASONABLY CLOSE CONFORMITY WITH DETERMINED BY AASHTO T 11. THE MATERIAL SHALL HAVE A PLASTICITY INDEX OF
THE PLANS OR AS ESTABLISHED BY THE ENGINEER. NOT MORE THAN 6 AS DETERMINED BYASSHTO T 90 AND A LIQUID LIMIT OF NOT ITEM 509 - SHEET PILES
MORE THAN 30 AS DETERMINED BY ASSHTO T 89.
THIS ITEM SHALL INCLUDE NECESSARY DIVERTING OF LIVE STREAMS, BAILING, THIS SHALL CONSIST OF FURNISHING, DRIVING AND CUTTING OFF OF SHEET
PUMPING, DRAINING, SHEETING, BRACING, AND THE NECESSARY CONSTRUCTION 1. UNSUITABLE MATERIAL - MATERIAL OTHER THAN SUITABLE MATERIALS PILING COVERED BY THIS SPECIFICATION.
OF CRIBS AND COFFERDAMS, AND FURNISHING THE MATERIALS THEREFORE, AND SUCH AS:
THE SUBSEQUENT REMOVAL OF CRIBS AND COFFERDAMS AND THE PLACING OF (A) MATERIALS CONTAINING DETRIMENTAL QUANTITIES OF QRGANIC ITEM 517 - DRAIN PIPE (PVC)
ALL NECESSARY BACKFILL. MATERIALS, SUCH AS GRASS, ROOTS AND SEWERAGE.
(B) ORGANIC SOILS SUCH AS PEAT AND MUCK. THIS ITEM SHALL CONSIST OF INSTALLING DRAIN PIPES, FASTENED WITH STEEL
IT SHALL ALSO INCLUDE THE FURNISHING AND PLACING OF APPROVED (C) SOILS WITH LIQUID LIMIT EXCEEDING 80 AND/OR PLASTICITY INDEX STRAPS THAT ARE EITHER BOLTED TO PIER COPINGS OR WELDED TO STEEL
FOUNDATION FILL MATERIAL TO REPLACE UNSUITABLE MATERIAL ENCOUNTERED EXCEEDING 55. GIRDERS IN VARIOUS LOCATIONS OF THE BRIDGE, OR AS INDICATED IN
BELOW THE FOUNDATION ELEVATION OF STRUCTURES. (D) SOILS WITH A NATURAL WATER CONTENT EXCEEDING 100%. ACCORDANCE WITH THIS SPECIFICATION AND IN CONFORMITY WITH THE LINES,
(E) SOILS WITH VERY LOW NATURAL DENSITY, 800 KG/M3 OR LOWER. AND GRADES AND DIMENSIONS SHOWN IN THE PLANS OR AS ESTABLISHED BY
(F) SOILS THAT CANNOT BE PROPERLY COMPACTED AS DETERMINED BY THE THE ENGINEER.
ENGINEER.

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 001:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - SUMMARY OF QUANTITIES
REGION VIII ASSET PRESERVATION LOCATION MAP
REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS
SAMAR FIRST DISTRICT ENGINEERING OFFICE SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS -
TABLE OF CONTENTS
RODIE JAY S. DOROJA JOHN REY R. BERNATE ENRICO N. COBACHA DENIS C. CAGOMOC ALVIN A. IGNACIO 1 2
Calbayog City, Samar GENERAL NOTES & SPECIFICATIONS
CALBAYOG-CATARMAN ROAD 1
ENGINEERING ASSISTANT ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 4
K0695+410 - K0695+505, K0696+701 - K0696+738,
DATE: DATE: DATE: DATE:
K0696+738 - K0696+804
EXISTING ROAD WIDENING

SEE DETAIL OF
CONCRETE BARRIER

1.50 m.
0.60 m.
0.50 m.
REINFORCED CONCRETE FACING
125mm THICK WITH 12mmØ REBARS
WIDENING CARRIAGEWAY WIDENING
SPACED @ 300mm BOTH WAYS

1.00 m. 2.00 m.
GROUTED RIPRAP 500mm THICK
100-300 mm Ø COBBLES / BOULDERS
1200 600 1200
9-10mmØ HORIZONTAL BARS
m.
SPACED AT 250mm O.C.

3.00 m.
0
0.5

EMBANKMENT FROM BORROW


@ 500mm MAX. LIFT COMPACTED 5-10mmØ VERTICAL BARS

600
EMBANKMENT 1.00 m. 2.00 m.
TO 90% OF PROCTOR TEST
SPACED AT 250mm O.C.
50 mm Ø WHEEPHOLES SPACED
@ 2000 mm HOR. & 1000 mm VERT.
STAGGERED.

3.00 m.
NATURAL GROUND

1.00 m.
FILL
TYPICAL ROAD SLIP PROTECTION SECTION

0.80 m.
SCALE NTS FOUNDATION BACKFILL
COMPACTED TO 95% OF
PROCTOR TEST

SEE DETAIL OF
CONCRETE FOOTING

TYPICAL ROAD SLIP PROTECTION SECTION

2100

600

9-10mmØ HORIZONTAL BARS


1.70 m. SPACED AT 250mm O.C.

800
1100
5-10mmØ VERTICAL BARS
FILL SPACED AT 250mm O.C.

16 - 12mm Ø HOR. BARS


0.45 m. 0.45 m.

w/ 12 mm Ø TRANSVERSE BARS

250 200
SPACED @ 300mm O.C.
0.90 m.

0.90 m.

200
0.50 m.

DETAIL CONCRETE FOOTING


CONCRETE BARRIER DETAIL
SCALE NTS

CONCRETE FOOTING DETAIL


SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 001:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - TYPICAL ROAD SLIP PROTECTION SECTION
REGION VIII ASSET PRESERVATION CONCRETE BARRIER DETAIL
REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS
SAMAR FIRST DISTRICT ENGINEERING OFFICE SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS -
CONCRETE FOOTING DETAIL
RODIE JAY S. DOROJA JOHN REY R. BERNATE ENRICO N. COBACHA DENIS C. CAGOMOC ALVIN A. IGNACIO 1 3
Calbayog City, Samar CALBAYOG-CATARMAN ROAD
ENGINEERING ASSISTANT ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 4
K0695+410 - K0695+505, K0696+701 - K0696+738,
DATE: DATE: DATE: DATE:
K0696+738 - K0696+804
K0696+701

K0696+738
NORTHBOUND LANE
K0695+000

K0696+000
SOUTHBOUND LANE

NORTHBOUND LANE

K0696+000
SOUTHBOUND LANE
K0695+410

K0695+505
STRAIGHT LINE DIAGRAM (K0695+410 - K0695+505) STRAIGHT LINE DIAGRAM (K0696+738 - K0696+804)
SCALE NTS SCALE NTS
K0696+701

K0696+738
NORTHBOUND LANE
K0696+000

SOUTHBOUND LANE

STRAIGHT LINE DIAGRAM (K0696+701 - K0696+738)


SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 001:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - STRAIGHT LINE DIAGRAM
REGION VIII ASSET PRESERVATION
REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS
SAMAR FIRST DISTRICT ENGINEERING OFFICE SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - RODIE JAY S. DOROJA JOHN REY R. BERNATE ENRICO N. COBACHA DENIS C. CAGOMOC ALVIN A. IGNACIO 1 4
Calbayog City, Samar CALBAYOG-CATARMAN ROAD
ENGINEERING ASSISTANT ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 4
K0695+410 - K0695+505, K0696+701 - K0696+738,
DATE: DATE: DATE: DATE:
1
K0696+738 - K0696+804