Widening of Anagasian Bridge (To more than 2 Lanes) along Daang Maharlika (Agusan-Davao Road S
Project : (B00917MN)
San Francisco, Agusan del Sur K1317+674 - K1317+710
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- me
project for the period November 1 - 7, 2017. We further certify that we have found that the quality of materials in
following items of work corresponding to the quality accomplished conforms with the Standard Specifications and
Special Provisions of the contract viz :
Quantity Accomplished
ITEM NO. : DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL :
Widening of Anagasian Bridge (To more than 2 Lanes) along Daang Maharlika (Agusan-Davao Road S
Project : (B00917MN)
San Francisco, Agusan del Sur K1317+674 - K1317+710
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- me
project for the period November 1 - 7, 2017. We further certify that we have found that the quality of materials in t
following items of work corresponding to the quality accomplished conforms with the Standard Specifications and
Special Provisions of the contract viz :
Quantity Accomplished
ITEM NO. : DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL :
G. SLOPE PROTECTION STRUCTURES
103(1)e Structure Excavation 585.01 cu.m cu.m 585.01 cu.m
505(5) Grouted Riprap Class "A" 318.07 cu.m cu.m cu.m
H. MISCELLANEOUS
600(3) Concrete Curb and Gutter, Type A (Cast in Place) 254.00 m. m. m.
603(3)a1 Metal Guardrails (Metal Beam) Including Post 96.00 L.M L.M L.M
603(3)b1 Metal Beam End Piece 6.00 each each each
607(1) Reflective Pavement Studs 50.00 each each each
612(1) Reflectorized Thermoplastic Pavement Markings (White) 164.35 sq.m sq.m sq.m
612(2) Reflectorized Thermoplastic Pavement Markings (Yellow) 38.59 sq.m sq.m sq.m
New Item:
411(a) Paint (Concrete Structures) 79.38 sq.m sq.m sq.m
Note:
Project on - going. . .
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- me
project for the period November 8-15, 2017. We further certify that we have found that the quality of materials in
following items of work corresponding to the quality accomplished conforms with the Standard Specifications and
Special Provisions of the contract viz :
Quantity Accomplished
Page 1 of 2
Quantity Accomplished
Note:
Project on - going…
Page 2 of 2
Widening of Anagasian Bridge (To more than 2 Lanes) along Daang Maharlika (Agusan-Davao Road S
Project : (B00917MN)
San Francisco, Agusan del Sur K1317+674 - K1317+710
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- me
project for the period November 23 - 30, 2017. We further certify that we have found that the quality of materials i
following items of work corresponding to the quality accomplished conforms with the Standard Specifications and
Special Provisions of the contract viz :
Quantity Accomplished
Page 1 of 2
We hereby certify that we have conducted an inspection and verification on work accomplished on the above- me
project for the period November 23 - 30, 2017. We further certify that we have found that the quality of materials in
following items of work corresponding to the quality accomplished conforms with the Standard Specifications and
Special Provisions of the contract viz :
Quantity Accomplished
ITEM NO. : DESCRIPTION : PROGRAMMED : THIS WEEK : TOTAL :
G. SLOPE PROTECTION STRUCTURES
103(1)e Structure Excavation 585.01 cu.m cu.m 585.01 cu.m
505(5) Grouted Riprap Class "A" 318.07 cu.m cu.m cu.m
H. MISCELLANEOUS
600(3) Concrete Curb and Gutter, Type A (Cast in Place) 254.00 m. m. m.
603(3)a1 Metal Guardrails (Metal Beam) Including Post 96.00 L.M L.M L.M
603(3)b1 Metal Beam End Piece 6.00 each each each
607(1) Reflective Pavement Studs 50.00 each each each
612(1) Reflectorized Thermoplastic Pavement Markings (White) 164.35 sq.m sq.m sq.m
612(2) Reflectorized Thermoplastic Pavement Markings (Yellow) 38.59 sq.m sq.m sq.m
New Item:
411(a) Paint (Concrete Structures) 79.38 sq.m sq.m sq.m
Note:
No activity done for the period covered.
Page 2 of 2
Specifica
tions and
Special
Provisio
ns of the
contract
viz :
Quantity Accomplished : THIS WEEK : TOTAL :
Specifica
tions and
Special
Provisio
ns of the
contract
viz :
Quantity Accomplished : THIS WEEK : TOTAL :
Note:
Project on - going…
Quantity changed due to Approved Variation Order No. 1 VIVIAN A. DESCALSO
Project Engineer I
MARILYN DP. ONDAP
(Project Quality Control Engineer)
ntity Accomplished
ACCOMPL.
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
50.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
86.47%
45.63%
0.00%
45.00%
0.00%
52.00%
100.00%
100.00%
100.00%
Page 1 of 2
ntity Accomplished
ACCOMPL.
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
ALEXANDER B. ORTIZ
Engineer II
Page 2 of 2
ntity Accomplished
ACCOMPL.
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
50.00%
100.00%
100.00%
100.00%
100.00%
90.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
62.83%
64.13%
0.00%
45.00%
0.00%
52.00%
100.00%
100.00%
100.00%
Page 1 of 2
ntity Accomplished
ACCOMPL.
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
ALEXANDER B. ORTIZ
Engineer II
Page 2 of 2
ntity Accomplished
ACCOMPL.
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
50.00%
100.00%
100.00%
100.00%
100.00%
90.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
62.83%
64.13%
50.00%
45.00%
0.00%
87.00%
100.00%
100.00%
100.00%
Page 1 of 2
ntity Accomplished
ACCOMPL.
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
ALEXANDER B. ORTIZ
Engineer II
Page 2 of 2
February 8, 2017
Date
ACCOMPL.
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
February 8, 2017
Date
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
VIVIAN A. DESCALSO
Project Engineer I
STATUS OF TEST
Constr
Our records indicate that the status of test in the above project for November 1 - 30
is as follows.uction
of
combi Actual Medium Number Test
Item ned Materials Estimated No. of Test on Balance
Field Quantities Required File
Office,
Labora
A. FACILITIES FOR THE ENGINEER
tory
A.1.1(1) and 1.00 L.S PE Cert. 1 0
B. OTHER GENERAL
Living REQUIREMENTS
B.4(1) Construction
Quarte Survey & Staking 0.250 km P.E. Cert 1 0
B.4(5) Bridge
rs Survey & Staking 1.00 LS P.E. Cert 1 0
B.5 Project
Buildi Billboard/Signboard 4.00 each P.E. Cert 1 0
B.7 Occupational
ng for Safety and Health 6.00 mo. P.E. Cert 1 0
B.8 Traffice
the Management 6.00 mo. P.E. Cert 1 0
B.9 Moblization/Demobilization
Engine 1.00 LS P.E. Cert 0 1
C. EARTHWORKS er
100(1) Clearing and Grubbing 0.50 ha. P.E. Cert 1 0
101(6) Removal of Structure & Obstruction 88.00 cu.m P.E. Cert 1 0
104(1)a1 Embankment from Roadway Excavation 919.50 cu.m GPC-1 1 0
D-28 0 28
104(1)b1 Embankment from Borrow 956.69 cu.m GPC-1 1 0
D-29 0 29
105(1)a Subgrade Preparation 2,400.00 sq.m GPC-1 1 0
D. SUBBASE COURSES
200 Aggregate Subbase Course 713.99 cu.m GP-3 0 3
C-1 1 0
D-29 0 29
CBR-1 1 0
E. SURFACE COURSES
300(1) Gravel Surface Course 156.78 cu.m GP-1 0 1
C-1 1 0
D-7 0 7
Q-1 1 0
302(2) Emulsified Asphalt 329.32 sq.m Q-1 1 0
310(1)c Bituminous Concrete Surface Course, Hotlaid (50mm) 329.32 sq.m G-1, Ext-1, Sty 0 1
C-1 0 1
311(1)c1 PCC Pavement (Unreinforced) (0.28 m. thick) 1,604.63 sq.m CBS - 6 sets 0 6
a.) Portland Cement 4,268.32 bags *
b.) Screened & Washed Fine Aggregate 247.11 cu.m **
c.) Screened & Washed Coarse Aggregate 449.30 cu.m ***
d.) Water - - P.E. Cert-1 0 1
e.) RSB 802.32 kgs. ****
f.) Curing Chemical Compound 465.34 lit. *****
g.) Asphalt Sealant 272.79 lit. ******
311(1)a PCC Pavement (Unreinforced) (0.30 m. thick) 80.00 sq.m CBS - 1 set 0 1
a.) Portland Cement 228.00 bags *
b.) Screened & Washed Fine Aggregate 13.60 cu.m **
c.) Screened & Washed Coarse Aggregate 24.00 cu.m ***
d.) Water - - P.E. Cert-1 0 1
e.) RSB 1,975.29 kgs. ****
f.) Curing Chemical Compound 23.20 lit. *****
g.) Asphalt Sealant 9.60 lit. ******
F. BRIDGE CONSTRUCTION
400(4)a Precast Concrete Piles(Furnished) (400mm x 400 mm) 520.00 m. CCS-2 sets 0 2
IR-1 1 0
400(6) Structural Steel Sheet Pile, Furnished 780.00 m. Q-1 1 0
400(12) Structural Steel Sheet Pile, Driven 754.00 m. IR-1 1 0
400(14) Precast Concrete Piles, Driven (400mm x 400 mm) 488.80 m. IR-1 1 0
400(16) Test Pile Furnished & Driven 72.00 m. CCS-1 set 1 0
IR-1 1 0
New Item:
411(a) Paint(Concrete Structures) 79.38 sq.m. Q-1 0 1
LEGEND
November 1 - 30,2017
Work
Accom.
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
50.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
0.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
52.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
100.00%
0.00%
0.00%
100.00%
0.00%
0.00%
100.00%
100.00%
0.00%
83.33%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
ALEXANDER B. ORTIZ
Engineer II
Project Engineer I
LEGEND
November 2017
Month Year
Widening of Anagasian Bridge (To more than 2 Lanes) along Daang Maharlika
Project: (Agusan-Davao Road Section) (B00917MN)
San Francisco, Agusan del Sur K1317+674 - K1317+710
ALEXANDER B. ORTIZ
(Project Engineer,Gov't)
c. Inspection
4.22% 54.72%
(Current Month) Total to Date
PREPARED BY:
WILFREDO G. CASILLANO
ME-I, Accred.# 3851
LC TING Construction
SUBMITTED BY:
LEODEGARIO M. MAZO
Engineer III
Chief, Quality Assurance Section
50.50%
SUMMARY REPORTS OF FIELD TESTS
Widening of Anagasian Bridge (To more than 2 Lanes) along Daang Maharlika
Project : (Agusan-Davao Road Section) (B00917MN) For the period: November 1 - 30,2017
Location : San Francisco, Agusan del Sur K1317+674 - K1317+710
Note:
Project on-going…
Widening of Anagasian Bridge (To more than 2 Lanes) along Daang Maharlika
Name of Project : (Agusan-Davao Road Section) (B00917MN)
Contractor : LC Ting Construction San Francisco,Agusan del Sur
Implementing Office : DPWH 2nd Engineering District, San Francisco, ADS Project Cost : 41,609,951.55
Project Duration : a.) Date Started : February 28, 2017
b.) Project Date of Completion : September 4, 2017
c.) Calendar Days : 190 CD
CONCERN REMARKS
* Accreditation of PE/PI A
ALEXANDER B. ORTIZ PE I
Accreditation No.
* Accreditation of Contractors'/Consultants' Project on going,….
ME B
PE -No Limit.
None
None
November 8, 2017
CERTIFICATION
Name of Project : Widening of Anagasian Bridge (To more than 2 Lanes) along Daang Maharlika
(Agusan-Davao Road Section) (B00917MN)
K1317+674 - K1317+710
I hereby certify that item 105(1)a which represents the Subgrade Preparation with a total
quantity of Two Thousand Four Hundred (2,400) square meters of the above named project was done
in accordance to the approved plans & specifications.
ALEXANDER B. ORTIZ
Project Engineer I
R13.11.6/ads II/qas/Klranocofiles
Republic of the Philippines Issue Date: 4/8/17
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Doc. Code: R13.11.6/ADS II/QAS/C
CERTIFICATION
Name of Project : Widening of Anagasian Bridge (To more than 2 Lanes) along Daang Maharlika
(Agusan-Davao Road Section) (B00917MN)
K1317+674 - K1317+710
I hereby certify that item B.8 which represents the Traffic Management with a total
quantity of three (3.00) months of the above named project was done in accordance to the approved
plans & specifications.
ALEXANDER B. ORTIZ
Project Engineer I
Republic of the Philippines Issue Date: 4/8/17
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Doc. Code: R13.11.6/ADS II/QAS/C
CERTIFICATION
Name of Project : Widening of Anagasian Bridge (To more than 2 Lanes) along Daang Maharlika
(Agusan-Davao Road Section) (B00917MN)
K1317+674 - K1317+710
I hereby certify that item 100(1) which represents the Clearing & Grubbing with a total
quantity of 50/100 (0.50) hectares of the above named project was done in accordance to the
approved plans & specifications.
ALEXANDER B. ORTIZ
Project Engineer I
Republic of the Philippines Issue Date: 4/8/17
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Doc. Code: R13.11.6/ADS II/QAS/C
CERTIFICATION
Name of Project : Widening of Anagasian Bridge (To more than 2 Lanes) along Daang Maharlika
(Agusan-Davao Road Section) (B00917MN)
K1317+674 - K1317+710
I hereby certify that item 101(6) which represents the Removal fo Structure &
Obstruction with a total quantity of eighty eight (88.00) cubic meter of the above named project was
done in accordance to the approved plans & specifications.
ALEXANDER B. ORTIZ
Project Engineer I
Republic of the Philippines Issue Date: 4/8/17
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Doc. Code: R13.11.6/ADS II/QAS/C
CERTIFICATION
Name of Project : Widening of Anagasian Bridge (To more than 2 Lanes) along Daang Maharlika
(Agusan-Davao Road Section) (B00917MN)
K1317+674 - K1317+710
I hereby certify that item 103(1)e which represents the Structure Excavation with a total
quantity of five hundred eighty five & 1/100 (585.01) cubic meter of the above named project was
done in accordance to the approved plans & specifications.
ALEXANDER B. ORTIZ
Project Engineer I