B.5 Project Billboard / Signboard ea 3.00 B.7 (2) Occupational Safety and Health Program l.s 1.00 B.8 (2) Traffic Management l.s 1.00 B.9 Mobilization / Demobilization l.s 1.00 PART C - EARTHWORK 100 (1) Clearing and Grabbing ha. 2.18 100 (3) a1 Individual Removal of Trees, 150-300 mm dia., small ea 27.00 100 (3) a2 Individual Removal of Trees, 301-500 mm dia., small ea 77.00 100 (3) a3 Individual Removal of Trees, 501-750 mm dia., small ea 1.00 101 (1) Removal of Structures and Obstruction l.s 1.00
Removal of Structures and Obstruction, 910mm dia. RCPC ln.m. 24.00
101 (4) a3 Removal of Structures and Obstruction, 300mm dia. RCPC ln.m. 8.00 101 (4) a8 Removal of Structures and Obstruction, 460mm dia. RCPC ln.m. 8.00 101 (4) a9 103 (1) a Structure Excavation, Common Soil cu.m. 115.24 103 (3) Foundation Fill cu.m. 4.75 103 (6) a Pipe Culverts and Drain Excavation, Common Soil cu.m. 65.12 Embankment from Roadway/Structure Excavation, Common cu.m. 1,167.54 104 (1) a Soil 104 (2) a Embankment from Borrow, Common Soil cu.m. 3,942.48 105 (1) a Subgrade Preparation, Common Material sq.m. 8,176.08 PART D - SUBBASE AND BASE COURSE 200 (1) Aggregate Subbase Course cu.m. 7,989.00 PART E - SURFACE COURSES Portland Cement Concrete Pavement (Unreinforcement), sq.m. 17,007.82 311 (1) d1 0.25m thick, 14days PART F - BRIDGE CONSTRUCTION 404 (1) a Reinforcing Steel, Grade 40 kgs. 586.19 404 (1) a3 Structural Concrete, 20.68MPa, Class A, 28 days cu.m. 8.05 PART G - DRAINAGE AND SLOPE PROTECTION STRUCTURES 500 (1) b1 Pipe Culverts, 610mm dia., Class IV, RCPC ln.m. 26.00 500 (1) b3 Pipe Culverts, 910mm dia., Class IV, RCPC ln.m. 36.00 505 (2) a Grouted Riprap, Class A cu.m. 224.43 506 (1) Stone Masonry cu.m. 31.72 508 (1) Hand-laid Rock Embankment cu.m. 14.79 PART H - MISCELLANEOUS STRUCTURES 612 (1) Reflectorized Thermoplastic Pavement Markings White sq.m. 675.45
Single Arm 8m-Pole Solar LED Roadway Lighting, 60W-80W ea 11.00