Summary for Slabs

STEEL BARS
A193 WWF
A252 WWF
GROUND SLAB
CONCRETE
HSC 400MM
HSC 200MM
LEAN CONCRETE
POLYTHENE SHEET
ANTITERMITE TREATMENT
50MM THICK SCREED (Above HCS Slab)

50.96
2,933.35
1,609.42
467.29
1,566.44
1,276.42
333.00
158.42
3,194.17
3,194.17
80.47

Tons
M2
M2
M3
M3
M2
M2
M3
M2
M2
M3

Summary for Sub Structure


STEEL BARS
CONCRETE
LEAN CONCRETE
POLYTHENE SHEET
SURFACE AREA FOR SHUTTERING
ANTITERMITE TREATMENT
SHUTTERING FOR LEAN CONCRETE

57.28
899.51
176.18
1,559.11
1,250.22
1,096.16
2,465.58

Tons
m3
m3
m2
m2
m2
lm

Summary for Super Structure


STEEL BARS
CONCRETE
SURFACE AREA FOR SHUTTERING
ANTITERMITE TREATMENT

74.59
685.76
6,254.52
500.50

Tons
m3
m2
m2

Blockworks
100mm Block external wall
200mmmBlock
150mm Block
100mm Block
Fire Rated 200mm block
Backing rod
12mm Bar

2,342.73
2,187.16
222.66
105.73
386.88
1,960.06
8.70

m2
m2
m2
m2
m2
Lm
Tons

Plaster works
100mm Block external wall
200mmmBlock
150mm Block
100mm Block
Fire Rated 200mm block

2,108.01
3,037.69
445.32
253.57
791.39

m2
m2
m2
m2
m2

Concrete Works
Lean concrete for foundation
Lean concrete for grade slab
Foundation concrete
Grade slab concrete
Column, wall, beam concrete
Solid slab concrete
50mm thk screed (above HCS)

176.18
158.42
899.51
467.29
685.76
1566.44
80.47

M3
M3
M3
M3
M3
M3
M3

Polythene sheet for foundation


Polythene sheet for grade slab

1559.11
3194.17

M2
M2

Antitermite treatment for found


Antitermite treatment for G.Slab
Antitermite treatment for wall

1,096.16
3,194.17
500.50

M2
M2
M2

Steel bar for foundation


Steel bar for solid slabs
Steel bar for Column, wall, beam
A193 WWF (grade slab)
A252 WWF (above HCS slab)

57.28
50.96
76.77
2,933.35
1,609.42

Tons
Tons
Tons
M2
M2

HSC 400MM
HSC 200MM

1,276.42
333.00

M2
M2

Blockworks

100mm Block external wall


250mmmBlock

1,846.92
60.00

m2
m2

200mmmBlock

2,187.16

m2

150mm Block

222.66

m2

100mm Block

105.73

m2

Fire Rated 200mm block

386.88

m2

2,108.01
3,037.69
445.32
253.57
791.39

m2
m2
m2
m2
m2

Plaster works
100mm Block external wall
200mmmBlock
150mm Block
100mm Block
Fire Rated 200mm block

Summary*
STEEL BARS
CONCRETE
LEAN CONCRETE
POLYTHENE SHEET
SURFACE AREA FOR SHUTTERING
ANTITERMITE TREATMENT
SHUTTERING FOR LEAN CONCRETE

57.28
899.51
176.18
1,559.11
1,250.22
1,096.16
2,465.58

Tons
m3
m3
m2
m2
m2
lm

Summary*
STEEL BARS
A193 WWF
A252 WWF
GROUND SLAB
CONCRETE
HSC 400MM
HSC 200MM
LEAN CONCRETE
POLYTHENE SHEET
ANTITERMITE TREATMENT
50MM THICK SCREED (Above HCS Slab)

50.96
2,933.35
1,609.42
467.29
1,566.44
1,276.42
333.00
158.42
3,194.17
3,194.17
80.47

Tons
M2
M2
M3
M3
M2
M2
M3
M2
M2
M3

Summary*
STEEL BARS
CONCRETE
SURFACE AREA FOR SHUTTERING
ANTITERMITE TREATMENT

74.59
685.76
6,254.52
500.50

Tons
m3
m2
m2

CORRECTIONAL FACILITIES BUILDINGSMINISTRY OF


BUILDING 1201AQTY's SUMMARY SHEET
INTERIOR
QUANTITIES FOR CORRECTIONAL FECILITIES BUILDING PROJECT

Quantities Summary for Bulinding


ITEM.No SI.NO
1

DESCRPITION
CONCRETE WORKS

Lean concrete for foundation

Lean concrete for grade slab

Foundation concrete

Grade slab concrete

Column, wall, beam concrete

Solid slab concrete

50mm thk screed (above HCS)

POLYTHENE SHEET
A

Polythene sheet for foundation

Polythene sheet for grade slab

WATER PROOFING
A

Bitumen paint 2 coats (Vertical)

Bitumen paint 2 coats (Horizontal)

STEEL WORKS
A

Steel bar for foundation

Steel bar for solid slabs

Steel bar for Column, wall, beam

A193 WWF (grade slab)

A252 WWF (above HCS slab)

Page 7

CORRECTIONAL FACILITIES BUILDINGSMINISTRY OF


BUILDING 1201AQTY's SUMMARY SHEET
INTERIOR
5

SHUTTERING WORKS
A

Shuttering materisl supplied by Main


Contractor
BLOCK WORK

100mm Block external wall

250mmmBlock

200mmmBlock

150mm Block

100mm Block

Fire Rated 200mm block

PLASTER WORK
A

100mm Block external wall

200mmmBlock

150mm Block

100mm Block

Fire Rated 200mm block


TOTAL AMOUNT

Page 8

CORRECTIONAL FACILITIES BUILDINGSMINISTRY OF


BUILDING 1201AQTY's SUMMARY SHEET
INTERIOR

ILDING PROJECT -DAMMAM

y for Bulinding 1201 A (01 No only)


QTY

UNIT UNIT RATE

TOTAL AMOUNT

176.18

M3

255

44,925.90

158.42

M3

255

40,397.10

899.51

M3

291

261,757.41

467.29

M3

291

135,981.39

685.76

M3

281

192,698.56

1,566.44

M3

281

440,169.64

80.47

M3

281

22,612.07

3,387.95

M2

2.50

8,469.88

3,194.17

M2

2.50

7,985.43

1,828.84

M2

12

21,946.08

1,329.00

M2

12

15,948.00

57.28

Tons

3,264

186,955.53

50.96

Tons

3,264

166,323.28

76.77

Tons

3,264

250,577.28

2,933.35

M2

18.80

55,146.96

1,609.42

M2

18.80

30,257.14

Page 9

CORRECTIONAL FACILITIES BUILDINGSMINISTRY OF


BUILDING 1201AQTY's SUMMARY SHEET
INTERIOR

AMOUNT

10,500.00

M2

42.00

441,000.00

1,846.92

M2

27.99

51,695.29

60.00

M2

36.65

2,199.00

2,187.16

M2

29.72

65,002.52

222.66

M2

28.57

6,361.40

105.73

M2

27.99

2,959.27

386.88

M2

59.75

23,116.15

2,108.01

M2

5.70

12,015.67

3,037.69

M2

5.70

17,314.86

445.32

M2

5.70

2,538.32

253.57

M2

5.70

1,445.36

791.39

M2

5.70

4,510.94

SAR
AREA(M2)
RATE/M2

Page 10

2,512,310.43
3,860.00
650.86

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-1201.B13


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

CONCRETE WORKS
1

Plain Concrete 20 MPA-SRC-thick = 50mm

150

M3

366.00

Plain Concrete 20 MPA-SRC-thick = 100mm

155

M3

350.00

5% Micro Silica

15

M3

40.00

Mass concrete > 100mm below footings & ground beams (truck measured)

M3

280.00

SUB-TOTAL

SAR

Sub-structure Concrete works 30 MPA-SRC (W/o S.O.G)


1
Isolated Footing
2
Strip Footing
3
Tie Beams/Grade Beam
4
Column Neck
5

Wall Neck (vary thick)


Page 11 of 40

160
380
85
12

M3
M3
M3
M3

620.00
620.00
900.00
1,125.00

125

M3

1,100.00

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-1201.B13


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

Slab on grade (20 MPA)-SRC

450

M3

455.00

Vapour Barrier 300 micron Poly Ethylene under slab on grade

5,000

M2

3.00

Damp Proofing

3,500

M2

6.00

5% Micro Silica

65

M3

50.00

SUB-TOTAL

SAR

Page 12 of 40

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-1201.B13


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

Super-structure works 30 MPA-OPC (Height as per drawings & spec max 4.5M)
1

Column/Beams/Walls

460

M3

1,050.00

(Column/Beams/Walls) with Corbel

140

M3

1,250.00

Suspended Slab (vary thick)

500

M3

975.00

Concrete Ramps, Steps & Landing

20

M3

1,200.00

Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)

110

M2

135.00

Concrete Screed

95

M3

550.00

Concrete Parapet

10

M3

1,050.00

Concrete Coping (Galvanized Accessories)

750

LM

130.00

Mechanical Pad

20

M3

600.00

SUB-TOTAL

SAR

Page 13 of 40

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-1201.B13


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

Steel Reinforcement (3% allowable wastage)


1

Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above

330

Ton

3,850.00

Unit Price for Cut, Bend & Installation

Ton

825.00

Unit Price for Installation only

Ton

675.00

4*

Unit Price for Supply,Cut and bend only

Ton

3,175.00

SUB-TOTAL

SAR

BLOCK WORKS AND PLASTER WORKS


BLOCK WORKS, including mortar tools / reinforcement dia 10mm & filling all
height around openings curing.Etc.
1

Supply & Installation of blocks 200mm(CMU), (Non Fire Rated)

2,600

M2

95.00

Supply & Installation of blocks 150mm(CMU), (Non Fire Rated)

190

M2

90.00

Supply & Installation of blocks 100mm(CMU), (Non Fire Rated)

1,650

M2

85.00

Page 14 of 40

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-1201.B13


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

Additional Rate for Fire Rated Solid Block

Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.

100

M2

20.00

1,700

LM

55.00

PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1

Supply & Installation of Cement Plaster (Internal)

5,000

M2

42.00

Supply & Installation of Cement Plaster (External)

5,500

M2

46.00

Galvanized Steel Grooves in Plaster

1,000

LM

15.00

SUB-TOTAL

SAR

GRAND TOTAL

SAR

Page 15 of 40

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

Current

Total
Amount(SAR)

Total

54,900.00

54,250.00

600.00

109,750.00

99,200.00
235,600.00
76,500.00
13,500.00

137,500.00

Page 16 of 40

Remarks

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

Current

Total
Amount(SAR)

Total

204,750.00

15,000.00

21,000.00

3,250.00

806,300.00

Page 17 of 40

Remarks

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

Current

Total
Amount(SAR)

Total

483,000.00

175,000.00

487,500.00

24,000.00

14,850.00

52,250.00

10,500.00

97,500.00

12,000.00

1,356,600.00

Page 18 of 40

Remarks

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

1,270,500.00

Current

Total
Amount(SAR)

Total

1,270,500.00

247,000.00

17,100.00

140,250.00

Page 19 of 40

Remarks

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

Current

Total
Amount(SAR)

Total

2,000.00

93,500.00

210,000.00

253,000.00

15,000.00

977,850.00

4,521,000.00

Page 20 of 40

Remarks

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-1601.4


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

CONCRETE WORKS
1

Plain Concrete 20 MPA-SRC-thick = 50mm

130

M3

366.00

Plain Concrete 20 MPA-SRC-thick = 100mm

60

M3

350.00

5% Micro Silica

10

M3

40.00

Mass concrete > 100mm below footings & ground beams (truck measured)

M3

280.00

SUB-TOTAL

SAR

Sub-structure Concrete works 30 MPA-SRC (W/o S.O.G)


1
Isolated Footing
2
Strip Footing
3
Tie Beams/Grade Beam
4
Column Neck
5

Wall Neck (vary thick)


Page 21 of 40

200
220
25

M3
M3
M3
M3

620.00
620.00
900.00
1,125.00

M3

1,100.00

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-1601.4


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

Slab on grade (20 MPA)-SRC

425

M3

455.00

Vapour Barrier 300 micron Poly Ethylene under slab on grade

3,370

M2

3.00

Damp Proofing

2,510

M2

6.00

5% Micro Silica

45

M3

50.00

SUB-TOTAL

SAR

Page 22 of 40

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-1601.4


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

Super-structure works 30 MPA-OPC (Height as per drawings & spec max 4.5M)
1

Column/Beams/Walls

180

M3

1,050.00

(Column/Beams/Walls) with Corbel

M3

1,250.00

Suspended Slab (vary thick)

510

M3

975.00

Concrete Ramps, Steps & Landing

25

M3

1,200.00

Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)

220

M2

135.00

Concrete Screed

M3

550.00

Concrete Parapet

M3

1,050.00

Concrete Coping (Galvanized Accessories)

480

LM

130.00

Mechanical Pad

20

M3

600.00

SUB-TOTAL

SAR

Page 23 of 40

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-1601.4


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

Steel Reinforcement (3% allowable wastage)


1

Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above

230

Ton

3,850.00

Unit Price for Cut, Bend & Installation

Ton

825.00

Unit Price for Installation only

Ton

675.00

4*

Unit Price for Supply,Cut and bend only

Ton

3,175.00

SUB-TOTAL

SAR

BLOCK WORKS AND PLASTER WORKS


BLOCK WORKS, including mortar tools / reinforcement dia 10mm & filling all
height around openings curing.Etc.
1

Supply & Installation of blocks 200mm(CMU), (Non Fire Rated)

3,200

M2

95.00

Supply & Installation of blocks 150mm(CMU), (Non Fire Rated)

1,700

M2

90.00

Supply & Installation of blocks 100mm(CMU), (Non Fire Rated)

920

M2

85.00

Page 24 of 40

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-1601.4


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

Additional Rate for Fire Rated Solid Block

Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.

M2

20.00

2,150

LM

55.00

PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1

Supply & Installation of Cement Plaster (Internal)

8,660

M2

42.00

Supply & Installation of Cement Plaster (External)

3,750

M2

46.00

Galvanized Steel Grooves in Plaster

LM

15.00

SUB-TOTAL

SAR

GRAND TOTAL

SAR

Page 25 of 40

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

Current

Total
Amount(SAR)

Total

47,580.00

21,000.00

400.00

68,980.00
124,000.00
198,000.00
28,125.00
-

Page 26 of 40

Remarks

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

Current

Total
Amount(SAR)

Total

193,375.00

10,110.00

15,060.00

2,250.00

570,920.00

Page 27 of 40

Remarks

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

189,000.00

Current

Total
Amount(SAR)

Total

497,250.00

30,000.00

29,700.00

62,400.00

12,000.00

820,350.00

Page 28 of 40

Remarks

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

885,500.00

Current

Total
Amount(SAR)

Total

885,500.00

304,000.00

153,000.00

78,200.00

Page 29 of 40

Remarks

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous
-

Current

Total
Amount(SAR)

Total
-

118,250.00

363,720.00

172,500.00

1,189,670.00

3,535,420.00

Page 30 of 40

Remarks

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-901.3


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

CONCRETE WORKS
1

Plain Concrete 20 MPA-SRC-thick = 50mm

30

M3

366.00

Plain Concrete 20 MPA-SRC-thick = 100mm

20

M3

350.00

5% Micro Silica

M3

40.00

Mass concrete > 100mm below footings & ground beams (truck measured)

M3

280.00

SUB-TOTAL

SAR

Sub-structure Concrete works 30 MPA-SRC (W/o S.O.G)


1
Isolated Footing
2
Strip Footing
3
Tie Beams/Grade Beam
4
Column Neck
5

Wall Neck (vary thick)


Page 31 of 40

55
65
5

M3
M3
M3
M3

620.00
640.00
950.00
1,250.00

M3

1,150.00

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-901.3


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

Slab on grade (20 MPA)-SRC

85

M3

480.00

Vapour Barrier 300 micron Poly Ethylene under slab on grade

745

M2

3.00

Damp Proofing

675

M2

6.00

5% Micro Silica

10

M3

60.00

SUB-TOTAL

SAR

Page 32 of 40

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-901.3


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

Super-structure works 30 MPA-OPC (Height as per drawings & spec max 4.5M)
1

Column/Beams/Walls

45

M3

1,150.00

(Column/Beams/Walls) with Corbel

M3

1,400.00

Suspended Slab (vary thick)

60

M3

1,050.00

Concrete Ramps, Steps & Landing

12

M3

1,350.00

Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)

50

M2

135.00

Concrete Screed

M3

600.00

Concrete Parapet

M3

1,150.00

Concrete Coping (Galvanized Accessories)

120

LM

140.00

Mechanical Pad

M3

600.00

SUB-TOTAL

SAR

Page 33 of 40

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-901.3


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

Steel Reinforcement (3% allowable wastage)


1

Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above

50

Ton

4,300.00

Unit Price for Cut, Bend & Installation

Ton

915.00

Unit Price for Installation only

Ton

750.00

4*

Unit Price for Supply,Cut and bend only

Ton

3,550.00

SUB-TOTAL

SAR

BLOCK WORKS AND PLASTER WORKS


BLOCK WORKS, including mortar tools / reinforcement dia 10mm & filling all
height around openings curing.Etc.
1

Supply & Installation of blocks 200mm(CMU), (Non Fire Rated)

490

M2

95.00

Supply & Installation of blocks 150mm(CMU), (Non Fire Rated)

270

M2

90.00

Supply & Installation of blocks 100mm(CMU), (Non Fire Rated)

290

M2

85.00

Page 34 of 40

CORRECTIONAL FECILITIES BUILDING PRO


CONTRACT No.1182

Segment No. 2, Building No. B-901.3


COST SUMMARY

SI.NO

DESCRPITION

Qty

Unit

Installation
unit
rate
SAR

Additional Rate for Fire Rated Solid Block

Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.

M2

20.00

400

LM

55.00

PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1

Supply & Installation of Cement Plaster (Internal)

1,175

M2

42.00

Supply & Installation of Cement Plaster (External)

905

M2

46.00

Galvanized Steel Grooves in Plaster

LM

15.00

SUB-TOTAL

SAR

GRAND TOTAL

SAR

Page 35 of 40

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

Current

Total
Amount(SAR)

Total

10,980.00

7,000.00

120.00

18,100.00
34,100.00
61,750.00
6,250.00
-

Page 36 of 40

Remarks

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

Current

Total
Amount(SAR)

Total

40,800.00

2,235.00

4,050.00

600.00

149,785.00

Page 37 of 40

Remarks

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

51,750.00

Current

Total
Amount(SAR)

Total

63,000.00

16,200.00

6,750.00

4,800.00

16,800.00

2,400.00

161,700.00

Page 38 of 40

Remarks

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous

215,000.00

Current

Total
Amount(SAR)

Total

215,000.00

46,550.00

24,300.00

24,650.00

Page 39 of 40

Remarks

CILITIES BUILDING PROJECT DAMMAM


CONTRACT No.1182

COST SUMMARY
Works Executed

Total Installation
Amount(SAR)

Previous
-

Current

Total
Amount(SAR)

Total
-

22,000.00

49,350.00

41,630.00

208,480.00

753,065.00

Page 40 of 40

Remarks

You might also like