STEEL BARS
A193 WWF
A252 WWF
GROUND SLAB
CONCRETE
HSC 400MM
HSC 200MM
LEAN CONCRETE
POLYTHENE SHEET
ANTITERMITE TREATMENT
50MM THICK SCREED (Above HCS Slab)
50.96
2,933.35
1,609.42
467.29
1,566.44
1,276.42
333.00
158.42
3,194.17
3,194.17
80.47
Tons
M2
M2
M3
M3
M2
M2
M3
M2
M2
M3
57.28
899.51
176.18
1,559.11
1,250.22
1,096.16
2,465.58
Tons
m3
m3
m2
m2
m2
lm
74.59
685.76
6,254.52
500.50
Tons
m3
m2
m2
Blockworks
100mm Block external wall
200mmmBlock
150mm Block
100mm Block
Fire Rated 200mm block
Backing rod
12mm Bar
2,342.73
2,187.16
222.66
105.73
386.88
1,960.06
8.70
m2
m2
m2
m2
m2
Lm
Tons
Plaster works
100mm Block external wall
200mmmBlock
150mm Block
100mm Block
Fire Rated 200mm block
2,108.01
3,037.69
445.32
253.57
791.39
m2
m2
m2
m2
m2
Concrete Works
Lean concrete for foundation
Lean concrete for grade slab
Foundation concrete
Grade slab concrete
Column, wall, beam concrete
Solid slab concrete
50mm thk screed (above HCS)
176.18
158.42
899.51
467.29
685.76
1566.44
80.47
M3
M3
M3
M3
M3
M3
M3
1559.11
3194.17
M2
M2
1,096.16
3,194.17
500.50
M2
M2
M2
57.28
50.96
76.77
2,933.35
1,609.42
Tons
Tons
Tons
M2
M2
HSC 400MM
HSC 200MM
1,276.42
333.00
M2
M2
Blockworks
1,846.92
60.00
m2
m2
200mmmBlock
2,187.16
m2
150mm Block
222.66
m2
100mm Block
105.73
m2
386.88
m2
2,108.01
3,037.69
445.32
253.57
791.39
m2
m2
m2
m2
m2
Plaster works
100mm Block external wall
200mmmBlock
150mm Block
100mm Block
Fire Rated 200mm block
Summary*
STEEL BARS
CONCRETE
LEAN CONCRETE
POLYTHENE SHEET
SURFACE AREA FOR SHUTTERING
ANTITERMITE TREATMENT
SHUTTERING FOR LEAN CONCRETE
57.28
899.51
176.18
1,559.11
1,250.22
1,096.16
2,465.58
Tons
m3
m3
m2
m2
m2
lm
Summary*
STEEL BARS
A193 WWF
A252 WWF
GROUND SLAB
CONCRETE
HSC 400MM
HSC 200MM
LEAN CONCRETE
POLYTHENE SHEET
ANTITERMITE TREATMENT
50MM THICK SCREED (Above HCS Slab)
50.96
2,933.35
1,609.42
467.29
1,566.44
1,276.42
333.00
158.42
3,194.17
3,194.17
80.47
Tons
M2
M2
M3
M3
M2
M2
M3
M2
M2
M3
Summary*
STEEL BARS
CONCRETE
SURFACE AREA FOR SHUTTERING
ANTITERMITE TREATMENT
74.59
685.76
6,254.52
500.50
Tons
m3
m2
m2
DESCRPITION
CONCRETE WORKS
Foundation concrete
POLYTHENE SHEET
A
WATER PROOFING
A
STEEL WORKS
A
Page 7
SHUTTERING WORKS
A
250mmmBlock
200mmmBlock
150mm Block
100mm Block
PLASTER WORK
A
200mmmBlock
150mm Block
100mm Block
Page 8
TOTAL AMOUNT
176.18
M3
255
44,925.90
158.42
M3
255
40,397.10
899.51
M3
291
261,757.41
467.29
M3
291
135,981.39
685.76
M3
281
192,698.56
1,566.44
M3
281
440,169.64
80.47
M3
281
22,612.07
3,387.95
M2
2.50
8,469.88
3,194.17
M2
2.50
7,985.43
1,828.84
M2
12
21,946.08
1,329.00
M2
12
15,948.00
57.28
Tons
3,264
186,955.53
50.96
Tons
3,264
166,323.28
76.77
Tons
3,264
250,577.28
2,933.35
M2
18.80
55,146.96
1,609.42
M2
18.80
30,257.14
Page 9
AMOUNT
10,500.00
M2
42.00
441,000.00
1,846.92
M2
27.99
51,695.29
60.00
M2
36.65
2,199.00
2,187.16
M2
29.72
65,002.52
222.66
M2
28.57
6,361.40
105.73
M2
27.99
2,959.27
386.88
M2
59.75
23,116.15
2,108.01
M2
5.70
12,015.67
3,037.69
M2
5.70
17,314.86
445.32
M2
5.70
2,538.32
253.57
M2
5.70
1,445.36
791.39
M2
5.70
4,510.94
SAR
AREA(M2)
RATE/M2
Page 10
2,512,310.43
3,860.00
650.86
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
CONCRETE WORKS
1
150
M3
366.00
155
M3
350.00
5% Micro Silica
15
M3
40.00
Mass concrete > 100mm below footings & ground beams (truck measured)
M3
280.00
SUB-TOTAL
SAR
160
380
85
12
M3
M3
M3
M3
620.00
620.00
900.00
1,125.00
125
M3
1,100.00
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
450
M3
455.00
5,000
M2
3.00
Damp Proofing
3,500
M2
6.00
5% Micro Silica
65
M3
50.00
SUB-TOTAL
SAR
Page 12 of 40
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Super-structure works 30 MPA-OPC (Height as per drawings & spec max 4.5M)
1
Column/Beams/Walls
460
M3
1,050.00
140
M3
1,250.00
500
M3
975.00
20
M3
1,200.00
Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)
110
M2
135.00
Concrete Screed
95
M3
550.00
Concrete Parapet
10
M3
1,050.00
750
LM
130.00
Mechanical Pad
20
M3
600.00
SUB-TOTAL
SAR
Page 13 of 40
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above
330
Ton
3,850.00
Ton
825.00
Ton
675.00
4*
Ton
3,175.00
SUB-TOTAL
SAR
2,600
M2
95.00
190
M2
90.00
1,650
M2
85.00
Page 14 of 40
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.
100
M2
20.00
1,700
LM
55.00
PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1
5,000
M2
42.00
5,500
M2
46.00
1,000
LM
15.00
SUB-TOTAL
SAR
GRAND TOTAL
SAR
Page 15 of 40
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
54,900.00
54,250.00
600.00
109,750.00
99,200.00
235,600.00
76,500.00
13,500.00
137,500.00
Page 16 of 40
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
204,750.00
15,000.00
21,000.00
3,250.00
806,300.00
Page 17 of 40
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
483,000.00
175,000.00
487,500.00
24,000.00
14,850.00
52,250.00
10,500.00
97,500.00
12,000.00
1,356,600.00
Page 18 of 40
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
1,270,500.00
Current
Total
Amount(SAR)
Total
1,270,500.00
247,000.00
17,100.00
140,250.00
Page 19 of 40
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
2,000.00
93,500.00
210,000.00
253,000.00
15,000.00
977,850.00
4,521,000.00
Page 20 of 40
Remarks
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
CONCRETE WORKS
1
130
M3
366.00
60
M3
350.00
5% Micro Silica
10
M3
40.00
Mass concrete > 100mm below footings & ground beams (truck measured)
M3
280.00
SUB-TOTAL
SAR
200
220
25
M3
M3
M3
M3
620.00
620.00
900.00
1,125.00
M3
1,100.00
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
425
M3
455.00
3,370
M2
3.00
Damp Proofing
2,510
M2
6.00
5% Micro Silica
45
M3
50.00
SUB-TOTAL
SAR
Page 22 of 40
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Super-structure works 30 MPA-OPC (Height as per drawings & spec max 4.5M)
1
Column/Beams/Walls
180
M3
1,050.00
M3
1,250.00
510
M3
975.00
25
M3
1,200.00
Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)
220
M2
135.00
Concrete Screed
M3
550.00
Concrete Parapet
M3
1,050.00
480
LM
130.00
Mechanical Pad
20
M3
600.00
SUB-TOTAL
SAR
Page 23 of 40
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above
230
Ton
3,850.00
Ton
825.00
Ton
675.00
4*
Ton
3,175.00
SUB-TOTAL
SAR
3,200
M2
95.00
1,700
M2
90.00
920
M2
85.00
Page 24 of 40
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.
M2
20.00
2,150
LM
55.00
PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1
8,660
M2
42.00
3,750
M2
46.00
LM
15.00
SUB-TOTAL
SAR
GRAND TOTAL
SAR
Page 25 of 40
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
47,580.00
21,000.00
400.00
68,980.00
124,000.00
198,000.00
28,125.00
-
Page 26 of 40
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
193,375.00
10,110.00
15,060.00
2,250.00
570,920.00
Page 27 of 40
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
189,000.00
Current
Total
Amount(SAR)
Total
497,250.00
30,000.00
29,700.00
62,400.00
12,000.00
820,350.00
Page 28 of 40
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
885,500.00
Current
Total
Amount(SAR)
Total
885,500.00
304,000.00
153,000.00
78,200.00
Page 29 of 40
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
-
Current
Total
Amount(SAR)
Total
-
118,250.00
363,720.00
172,500.00
1,189,670.00
3,535,420.00
Page 30 of 40
Remarks
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
CONCRETE WORKS
1
30
M3
366.00
20
M3
350.00
5% Micro Silica
M3
40.00
Mass concrete > 100mm below footings & ground beams (truck measured)
M3
280.00
SUB-TOTAL
SAR
55
65
5
M3
M3
M3
M3
620.00
640.00
950.00
1,250.00
M3
1,150.00
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
85
M3
480.00
745
M2
3.00
Damp Proofing
675
M2
6.00
5% Micro Silica
10
M3
60.00
SUB-TOTAL
SAR
Page 32 of 40
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Super-structure works 30 MPA-OPC (Height as per drawings & spec max 4.5M)
1
Column/Beams/Walls
45
M3
1,150.00
M3
1,400.00
60
M3
1,050.00
12
M3
1,350.00
Fair face finish for Concrete Ramps, Steps & Landing (Saeled Concrete)
50
M2
135.00
Concrete Screed
M3
600.00
Concrete Parapet
M3
1,150.00
120
LM
140.00
Mechanical Pad
M3
600.00
SUB-TOTAL
SAR
Page 33 of 40
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Supply, Cut, Bend & Install of Straight Reinf bars For 8 & 10,12,14,16mm & above
50
Ton
4,300.00
Ton
915.00
Ton
750.00
4*
Ton
3,550.00
SUB-TOTAL
SAR
490
M2
95.00
270
M2
90.00
290
M2
85.00
Page 34 of 40
SI.NO
DESCRPITION
Qty
Unit
Installation
unit
rate
SAR
Supply & Apply Backing rod (3cm thick) and fire rated seleant above block walls.
M2
20.00
400
LM
55.00
PLASTER WORKS, including materials, angle beds, wire mesh & all related
accessories and curing.Etc.
1
1,175
M2
42.00
905
M2
46.00
LM
15.00
SUB-TOTAL
SAR
GRAND TOTAL
SAR
Page 35 of 40
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
10,980.00
7,000.00
120.00
18,100.00
34,100.00
61,750.00
6,250.00
-
Page 36 of 40
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
Current
Total
Amount(SAR)
Total
40,800.00
2,235.00
4,050.00
600.00
149,785.00
Page 37 of 40
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
51,750.00
Current
Total
Amount(SAR)
Total
63,000.00
16,200.00
6,750.00
4,800.00
16,800.00
2,400.00
161,700.00
Page 38 of 40
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
215,000.00
Current
Total
Amount(SAR)
Total
215,000.00
46,550.00
24,300.00
24,650.00
Page 39 of 40
Remarks
COST SUMMARY
Works Executed
Total Installation
Amount(SAR)
Previous
-
Current
Total
Amount(SAR)
Total
-
22,000.00
49,350.00
41,630.00
208,480.00
753,065.00
Page 40 of 40
Remarks