You are on page 1of 1

PROGRAM OF WORKS

Item No. Scope of Work Quantity Unit


PART A FACILITIES FOR THE ENGINEER
A.1.1 (3) Construction of Field Office for the Engineer, (6m x 6m) 1.00 Lump sum
PART B OTHER GENERAL REQUIREMENTS
B.4(1) Construction Survey & Staking 1.70 km.
B.9 MOBILIZATION & DEMOBILIZATION 1.00 Lump Sum
B.5 Project Billboard/ Signboard 2.00 Each
PART C EARTHWORKS
100 (1) CLEARING AND GRUBBING 0.34 Has.
100 (3) a1 INDIVIDUAL REMOVAL OF TREES (150 - 300 mm ø) - small 124.00 Each
101 (3) b1 Removal of Actual Structures/Obstruction (0.15 m thick - PCCP) 626.60 sq.m.
102 (2) SURPLUS COMMON EXCAVATION 11,298.30 cu.m.
104 (1) a Embankment from roadway excavation (Common Soil) 6,258.79 cu.m.
105 (1) a SUBGRADE PREPARATION (COMMON MATERIAL) 5,103.00 sq.m.
PART D SUBBASE AND BASE COURSE
200 (1) Aggregate Subbase Course 4,213.36 cu.m.
PART E SURFACE COURSES
311 (1) b1 Portland Cement Concrete Pavement (Unreinforced), 0.20 m thick - 14 days 11,479.41 sq.m.
PART F 1 UNIT RCDG BRIDGE (18.00 METERS)
103 (2) a Bridge Excavation (Common Soil) 225.12 cu.m.
103 (3) FOUNDATION FILL 121.94 cu.m
103 (5) a Shoring, cribbing and related works (Shoring) 1.00 lumpsum
103 (5) b Shoring, cribbing and related works (Cribbing) 1.00 lumpsum
311 (2) e1 Portland Cement Concrete Pavement (Reinforced), 0.28 m thick - 14 days 59.04 sq.m.
401 (2) a Concrete Railing (Standard) 36.00 mtrs
404 (1) a REINFORCING STEEL (Grade 40) 1,942.79 kgs.
404 (1) b REINFORCING STEEL (Grade 60) 44,145.03 kgs.
405 (1) b3 STRUCTURAL CONCRETE, CLASS A (27.58 Mpa - 28 days) 200.16 cu.m.
407 (8) LEAN CONCRETE, Class B (16.5 Mpa) 0.42 cu.m.
506 (1) STONE MASONRY 155.95 cu.m.
PART G-1 DRAINAGE & SLOPE PROTECTION STRUCTURES (PIPE CULVERT)
101 (4) a3 Removal of Actual Structures/Obstruction, (910mmø RCPC) 28.00 ln.m.
101 (4) a5 Removal of Actual Structures/Obstruction, (1220mmø RCPC) 14.00 ln.m.
101 (4) a6 Removal of Actual Structures/Obstruction, (1520mmø RCPC) 7.00 ln.m.
103 (6) a Pipe culverts and drain excavation (Common Soil) 301.92 cu.m.
103 (1) a Structure Excavation (Common Soil) 36.36 cu.m.
103 (3) FOUNDATION FILL 15.80 cu.m
500 (1) a3 PIPE CULVERTS, 910 mm. ø (CLASS II RCPC) 60.00 ln.m.
500 (1) a6 PIPE CULVERTS, 1520 mm. ø (CLASS II RCPC) 10.00 ln.m.
506 (1) Stone Masonry 83.01 cu.m.
PART G-2 DRAINAGE & SLOPE PROTECTION STRUCTURES (LINE CANAL)
103 (1) a Structure Excavation (Common Soil) 248.40 cu.m.
405 (2) d STRUCTURAL CONCRETE, CLASS B (16.50 Mpa) 42.27 cu.m.
506 (1) Stone Masonry 73.78 cu.m.
PART G-3 DRAINAGE & SLOPE PROTECTION STRUCTURES (SLOPE PROTECTION)
103 (1) a Structure Excavation (Common Soil) 56.86 cu.m.
505 (2) a Grouted Riprap , Class A 285.50 cu.m.
PART H MISCELLANEOUS STRUCTURES
603 (3) a1 METAL GUARDRAIL (METAL BEAM) Including POST, (Single, W-Beam) 160.02 Ln.m.
603 (4) a METAL BEAM END PIECE (Fish Tail) 8.00 each
605 (1) c3 WARNING SIGNS (900 mm, W1-3C) 4.00 each
605 (1) ar1 WARNING SIGNS ( 600 mm x 400 mm , W8-1A) 1.00 each
606 (1) a1 PAVEMENT MARKINGS (Premixed Reflectorized - White) 420.55 sq.m.
605 (6) e1 HAZARD MARKERS (450x600mm - CHEVRON SIGNS ) 26.00 each

You might also like