You are on page 1of 36

BARANGAY TACAYAN, TAPAZ

CAPIZ
MESSAGE
My heart’s desire and my vision to our beloved barangay is only for
its betterment, same goes with its populace. Through this
Programs, Projects and Activities that we identified will certainly be
a factor of what we aspired. I'm looking forward for an immense
transformation as we plot for the development of our barangay. May
this undertaking will minimize the present predicament that we are
all enduring.

Thank you…
God bless us all…

HON. NONITO C. LINGAYA


Punong Barangay
Acknowledgement

 We / like to extend our profound gratitude to Mr. Vito K. Navarra


MLGOO Tapaz for his unwavering support , as well as to Mr. Aldrin C.
Falco-BOST Team Leader for the inputs, Engr./EnP. Richard T.
Gloria-MPDC for contributing one of the pieces of this undertaking, 12
IB for assisting us in every way.
 Our special thanks and outmost respect to the person who reborn
Tapaznon’s and untiring dedication to make this
undertaking feasible - Honorable Mayor
Roberto “Nonong” O. Palomar
History
 Sang unang panahon samtang ang mga kamal aman naga
obra okon ano nga tradisyon ang gina himo gina kasugtan
paagi sa pag hambal nga Tacay.

 Sang pag abot sang sang mga Katsila may isa ka pag
binuligay ang ila nalabayan kag sila nagpamankot sa isa ka
pumuluyo kung ano ini nga lugar, ang sabat sang pumuluyo
Tacay kay sila ga obra paagi sa pag bayanihan kag ang ila
tawag sa amo nga pagbinuligay Tacay
HISTORY
 TABLE OF CONTENTS
 History
 Situational Analysis
 Organizational
Philosophy
 Barangay Investment
Program
 Monitoring and
Evaluating System
Geography
BARANGAY TACAYAN

Number of
Puroks/Sitios 2 Puroks

Land Area 1,263.724 hectares


Barangay Tacayan
Nr. Of
Households 1 02 HH

Population 473

❖ Male – 267
❖ Female - 206
Name of
Brgy Hon. Nonito C. Lingaya
Chairman
Barangay Tacayan is considered as one of
the upland barangays of the Municipality of
Tapaz. It is bounded on the North by Barangay
Physical Nayawan and Brgy Lahug , in the East by
Layout Barangay Acuña, in the west by Barangay
Buri, in the South by Barangay Masaroy.
❖ Residential – 38%
❖ Agricultural – 62&
Vegetation ❖ Forested - 60%
❖ Grassland – 40%
Type of Soil Soil type is mainly compose of Loam, and
Clay Loam
GEOGRAPHICAL Municipality of Tapaz
MUNICIPALITY OF TAPAZ

Barangay Tacyan
BRGY ROOSEVELT

ACESS TO BRGY
POBLACION IS
THROUGH BRGY
MASAROY, CALINOG,
ILOILO
ECONONOMIC DATA

MAJOR CROPS 1. Banana


2. Coffee
3. Copra
4. Rice
5. Corn
6. Root Crops and other vegetables
7. Fruit Bearing Trees

LIVESTOCK Carabao, goats, swine and poultry animals

POST HARVEST Rice Thresher


FACILITY/EQUIPMENTS
SOCIAL DATA
(HEALTH FACTOR)

FACILITIES WORKERS SERVICES RENDERED


• Consultation and Referrals
• Vital Sign Taking (BP,
▪ 1 Midwife Temperature and Weighing)
▪ 5 Barangay Health • Family Planning Program
Workers (Counseling and Birth
1 Barangay Health Spacing)
▪ 1 Barangay Nutrition
Center Scholar
• Pre Natal check ups
• Nutrition Program (Feeding
Program)
• Health Education
• Immunization programs

➢ The barangay currently


has 1 unit Barangay
Health Center with 1
Midwife visiting once a
month,
➢ 5 Barangay Health
Workers who assisted
the midwife in every visit
➢ 1 Barangay Nutrition
Scholar who monitors
the nutrition of the
children
SOCIAL DATA
(EDUCATION FACTOR)
Name of Location Grade Number Number of Male Female No. of Teachers to
School Level of Classroom Pupils student ratio
Teachers s
Day Care 1 1 10 8 18 1:18

Grade 1 1 10 8 18
1 1:27
Grade 2 1 5 4 9
Tacayan Barangay
Primary Tacayan
Grade 3 1 7 3 10
School Proper
1 1:17
Grade 1 5 2 7
IV
TOTAL NUMBER OF PUPILS 62 1:62

Barangay Tacayan has a


Primary School with 3
Teachers and headed by
Mrs. Mary Joy Hernandez
TIC And 1 unit bldg of Day
Care Center with 1 teacher
Social factor ( Peace and Order)

Rechard Caspillo
CHIEF TANOD

Jerome Celeste
George Aguirre Crispin Aguirre MEMBER Welmer Celeste
MEMBER MEMBER
MEMBER

Robert Aguirre Larry Aguirre


Sherwen Diaz Larry Diaz Seldereco Diaz
MEMBER MEMBER
MEMBER MEMBER MEMBER
SOCIAL DATA
(PEACE AND ORDER FACTOR

Katarungang Pambarangay

Raffy Aguirrre
Roben Aguirre CHIEF LUPON Teodereco Diaz
MEMBER MEMBER

Modesto Aguirre Renaldo Diaz Mariano Caspillo Lito Diaz


MEMBER MEMBER MEMBER MEMBER
Remarks
❖ KPs resolve all disputes that occur in the barangay and forward to concern
government agencies if the barangay justice system fails to resolve.
INFRASTRUCTURE
FACTOR

Tacayan Primary School


Barangay Health Center

Day Care Center


Basket ball Court

Barangay Hall

❖ Habal-habal is the main means of public transport


Local Government Administration

Hon. Ginny Gelbaliga Hon.Radne Catamin


Hon. Nonito C. Lingaya Hon.Beltran Diaz Hon.Ressa Aguirre

Hon.Dailyn Catamin Hon.Ronel Celeste


Hon.Romeo Castor

Ma. Elena Aguirre


Ednel Castor
Brgy Treasurer
Brgy Secretary
Climate-related Hazards
and Issues
❑ Typhoon
❖ Most houses are built with light materials
❖ Situated along foot of the mountain
❖ Built in an open areas that are susceptible of strong winds
❑ LANDSLIDE
❖ Some houses are located along river banks and mountainous part of the barangay
❖ Agricultural areas that are located at creek banks are damage

Agriculure
sector
Economic
Sector
Infrastructure
sector

Pie slices showing percentage of affected sectors


SITUATIONAL ANALYSIS

CURRENT SITUATION DESIRED RESULT

MUDDY BARANGAY ROAD ACCESS TO ROAD IMPROVEMENT


DURING RAINY DAYS

IN ACCESSIBLE ELECTRICITY ACCESS TO ELECTRIFICATION


Situational Analysis
SITUATIONAL ANALYSIS

INFRASTRUCTURE SECTOR

PRIMARY PROBLEMS DESIRED SOLUTION

1. Unpassable barangay road ❑ Access to road improvement


during rainy days

2. In accessible electricity ❑ Access to electricity

3. No source of potable water ❑ Construction of water system


INFRASTRUCTURE SECTOR
OTHER PROBLEMS APPROPRIATE SOLUTION
1. Unpassable transport in ➢ Construction of Box Culvert
Alitugpan Creek

ECONOMIC SECTOR
1. Insufficient ➢ Conduct trainings and
knowledge about other introduce about other
farming methods farming methods
VISION

We envision the Barangay Tacayan to be more


productive and progressive, resilient, economically
stable and peaceful to live in.

MISSION

We commit to perform excellent duties and


responsibilities to carry out the plans and
objectives of the barangay through delivering
basic services by improving infrastructures,
environment and social needs of the people.
ORGANIZATIONAL PHILOSOPHY
SOCIAL SECTOR
OTHER PROBLEMS APPROPRIATE
SOLUTION
1. Lack of opportunities for empowerment ➢ Conduct Livelihood Skills Training to
and generating additional income Women, Youth, Senior Citizen and PWD
➢ Provide access to financial assistance
➢ Offer intervention programs for PWD
and Senior Citizen
2. Lack of equipment and facilities needed ➢ Construct Youth Center
for youth empowerment ➢ Procure furniture and equipment for
Youth Center

3. Insufficient equipment's and facilities ➢ Construct Tanod Outpost


needed for safety and security ➢ Provide uniform and paraphernalia of
barangay tanod
➢ Increase the allowance of Barangay
Tanod
➢ Support to the establishment of Civilian
Active Auxiliary (CAA) Detachment
➢ Support to the organization and training
of CAA
SOCIAL SECTOR
OTHER PROBLEMS APPROPRIATE SOLUTION
1. Lack of facilities and equipment's ➢ Construct evacuation center
for disaster preparedness and ➢ Procure disaster supplies and
mitigation equipment
➢ Purchase emergency kit and tools
for Emergency Response Team
2. Insufficient knowledge and skills ➢ Re-organize Emergency Response
about disaster related issues Team
➢ Train the emergency Response
Team
INSTITUTIONAL SECTOR

1. Insufficient supplies for records ➢ Purchase office supplies


management

2. Citizenries‘ passivity ➢ Revitalize Barangay Basic


Institutions
BARANGAY DEVELOPMENT PLAN
BARANGAY TACAYAN
FY 2021-2023
INFRASTRUCTURE SECTOR
GOALS:
Build sustainable and resilient infrastructures towards improved economic and social living
condition of the people
OBJECTIVE:
1. Provide adequate and responsive road system and other facilities for easy
access of goods and services
1.1 Construct/Rehabilitate/Concrete of Barangay Road
1.2 Install electricity in the barangay
1.3 Construct water system
1.4 construction of Box Culvert

ECONOMIC SECTOR (AGRICULTURE SERVICES)


GOAL:
To increase farmers income and ensure food sufficiency
OBJECTIVES:
1. Organize and improve the capacities of the farmers
1.1 Provide access to financial support to farmers
1.32Provide access to crop and livestock insurance
BARANGAY
DEVELOPMENT PLAN
SOCIAL SECTOR (EDUCATIONAL SERVICES)
GOAL:
Ensure inclusive equitable quality education and promote life-long learning opportunities
for all

OBJECTIVES:
1. Acquire educational facilities and equipment's
1.1 Purchase of learning materials and school supplies
1.2 Procure furniture and audio visual equipment
2. Empower the educators
2.1 Increase the allowance of Child Development Worker

SOCIAL SECTOR (HEALTH SERVICES)


GOAL:
To ensure good health and promote the well-being of the residents

OBJECTIVES:
1. Provide/rehabilitate medical facilities, equipment and supplies
1.1 Purchase medical supplies
1.3 Establish Botika ng Barangay
2. Educate the constituents on right nutrition and sanitation
2.1 Conduct IEC Program for the right nutrition
BARANGAY
SOCIAL SECTOR (SOCIAL WELFARE SERVICES) DEVELOPMENT PLAN
GOAL:
To improve the quality of life of the people through effective and responsive social services
OBJECTIVES:
1. Provide opportunities for empowerment and generate additional income
1.1 Provide access to financial assistance
1.2 Offer intervention programs for PWD and Senior Citizen
2. Procure equipment and facilities needed for social welfare services
2.1 Construct Youth Center
2.2 Procure furniture and equipment for the Youth Center

SOCIAL SECTOR (PROTECTIVE SERVICES)


GOAL:
Promote peaceful and inclusive societies for sustainable development
OBJECTIVES:
1. Provide equipment and facilities needed for safety and security
1.1 Construct Tanod Outpost
1.2 Support to the establishment of Civilian Active Auxiliary (CAA) Detachment
1.3 Support to the organization and training of CAA

2. Support and augment the needs of security personnel


2.1 Provide uniform and paraphernalia of barangay tanod
2.2 Increase the allowance of Barangay Tanod
BARANGAY
SOCIAL SECTOR (DISASTER PREPAREDNESS SERVICES
DEVELOPMENT PLAN
GOAL:
Enhance emergency response and disaster preparedness
OBJECTIVES:
1. To increase the capacity of the barangay by providing the necessary tools. Equipment
and facility relative to disaster preparedness and mitigation
1.1 Construct evacuation center
1.2 Procure disaster supplies and equipment
1.4 Purchase emergency kit and tools for Emergency Response Team
2. To equip the barangay with skills necessary to cope with the negative impact of the
disaster
2.1 Re-organize Emergency response Team
2.2 Train the emergency Response Team

ENVIRONMENT SECTOR
GOALS:
To ensure a stable environment and balance ecology
OBJECTIVES:
1. To maintain and preserve the natural environment
1.1 Conduct IEC Program relative to Kaingin System
2. To rehabilitate the degraded environment
2.2 Conduct reforestation initiatives
BARANGAY DEVELOPMENT AND
INVESTMENT PROGRAM
BARANGAY DEVELOPMENT PLAN
INSTITUTIONAL SECTOR
GOALS:
To deliver effective, efficient and economical services through transparent and
participatory good governance

OBJECTIVES:
1. Improve revenue collection generation
1.1 Update barangay revenue code
2. Improve barangay records management
2.1 Purchase office supplies
3. Promote active participation of the citizenry
3.1 revitalize Barangay Basic Institutions

Prepared :

MR. EDNEL G. CASTOR MRS. MA. ELINA C. AGUIRRE


Barangay Secretary Barangay Treasurer

Attested:

HON. NONITO C. LINGAYA


Punong Barangay
MONITORING AND EVALUATION
BARANGAY DEVELOPMENT AND INVESTMENT PROGRAM
For Planning Period : 2021-2026
Years Covered : 2021-2023
Barangay: TACAYAN Province of : CAPIZ
City/Municipality of: TAPAZ
Schedule of Amount
AIP Implementation (In Thousand Pesos)
Program/Pro ject/Activity Funding
Reference OPR Expected Outputs Maintenance and
Code Description Completion Source Personal Capital Outlay
Start Date Other Operating Total
Date Services (CO)
Expenses (MOOE)
Brgy Officials and Brgy Response Team will
3000-001-007-
01
Seminar Jan.1 2021 Dec.31,2021 have awareness on proper rescue guidelines 5% BDRRM 12,189.83
and dissaster related issues
PB 12,189.83
Brgy Officials and Brgy Response Team
3000-001-007-
02
Seminar jan 1,2022 Dec.31, 2022 will have awareness on proper rescue 5% BDRRM 15,000.00
PB guidelines and dissaster related issues 15,000.00
Conduct Information
3000-001-011 Seminar Jan, 2022 Dec-22 dissemination/seminar related to GAD 5% GAD 10,000.00
PB issues 10,000.00
3000-001- Leadership training nation
Sk Chairperson Jan.1,2021 Dec. 31, 2021 Active youth leader and member 10% SK fund 9,000.00
014-01 building and seminar 9,000.00
3000-001- Capability building and leadership
Sk Chairperson Jan. 2022 Dec. 2022 Active youth leader and member 10% SK fund 10,000.00
014-02 training 10,000.00
3000-001- Capability building and leadership
Sk Chairperson Jan. 2023 Dec. 2023 Active youth leader and member 10% SK fund 10,000.00
014-03 training 10,000.00
9000-01-010 Conduct IEC Program relative to IEC Program relative to Kaingin sytem
Jan. 2023 Dec. 2023 20% DF 15,000.00
Kaingin System PB conducted 15,000.00
9000-001-
000 Update barangay revenue code Jan. 2023 Dec. 2023 Improve revenue collection generation GF 5,000.00
PB 5,000.00
9000-001-
000 Purchase Office Supplies Jan. 2023 Dec. 2023 Improve barangay records management GF 30,000.00
PB 30,000.00
9000-001-
Revitalize Barangay Basic
000 Jan. 2023 Dec. 2023 Active participation of the citizenry GF 30,000.00
Institutions
PB 30,000.00
3000-002-002- PB/ Comm. External
02
Establish Botika ng Barangay Feb. 2023 Feb. 27, 2023 Botika ng Barangay established
Fund/SLP
500,000.00
Health 500,000.00
3000-002-002- Conduct IEC Program for the right IEC Program for the right nutrition and
Jan. 2023 Dec. 2023 GF 30,000.00
03 nutrition and sanitation PB sanitation conducted 30,000.00
3000-002-002-
04
Provide feeding programs Jan. 2023 Dec. 2023 Feeding program conducted GF 50,000.00
PB 50,000.00
Provision of 5pcs handcuffs to brgy tanod to
3000-002-003- Intensify peace and order in the PB/Comm. Peace
01 community and Order
Jan.1 2021 Dec.31,2021 restrain individuals from doing any harm that GF 2,000.00
may arise in the community 2,000.00

3000-002- Conduct Sympossium for Anti- PB/Comm. Peace


Jan.1 2021 Dec.31,2021 Conduct community awareness and advocacy Gf 3,000.00
003-02 Drug Awareness and Order
campaign on Alternative Development 3,000.00
Institute a peace and harmonious
3000-002- PB/Comm. Peace Peace,Anti- Drug Free and
community by Implementing Anti- Jan. 2021 Dec. 2021 GF 2,000.00
003-03 and Order progressive Barangay
Drug Awareness 2,000.00
3000-002- PB/ Comm. Installation of electricity in the SBDP-
Access to electrification July 2021 Dec. 2021 5,000,000.00
003-04 Infra barangay (ELCAC FUND) 5,000,000.00
3000-002- Conduct Sympossium for Anti- PB/Comm. Peace
Jan. 1,2022 Dec. 3, 2022 Conduct community awareness and advocacy GF 5,000.00
003-07 Drug Awareness and Order
campaign on Alternative Development 5,000.00
3000-002- PB/ Comm.
Construction of Birthing Clinic Jan. 2022 March 2022 Birthing Clinic constructed 20% DF 300,000.00
003-05 Health 300,000.00
3000-002- Support to the establishment of PB/Comm. Peace Civilian Auxillary (CAA) detachment
Civilian Auxillary (CAA) Detachment and Order
Mar-21 GF
006-01 established 2,000.00 2,000.00
3000-002-
006-02
Construction of SK Hall Sk Chairperson Jan. 2023 Dec. 2023 SK Hall constructed 10% SK fund 100,000.00
100,000.00
3000-002- External Fund-
006-04
Construction of Youth Center Sk Chairperson Jan. 2023 Dec. 2023 Youth Center constructed
Congressman
100,000.00
100,000.00
3000-002-007- Purchase Assorted goods and Standby for relief purposes in occurrence of
01 medicines PB Jan.1 2021 Dec.31,2021
calamity
5% BDRRM 25,367.07 25,367.07
3000-002-007-
02
Purchase of 1 unit solar street light
PB/Infra Jan. 1, 2021 Dec. 2021 1 unit solar street light purchased 5% BDRRM 25,000.00 25,000.00
3000-002-007- PB/Comm. Peace
03
Purchase 2 units Handheld radio
and Order
Mar-21 March 31,2021 2 units Handheld radio purchased 5% BDRRM 22,000.00
22,000.00
3000-002-007- Purchased assorted goods and PB/Comm. Peace Standby for relief purposes in
Jan-22 Dec. 2022 5% BDRRM 34,725.49
04 medicines and Order
occurrence of calamity 34,725.49
3000-002-007- Purchase 3 units Handheld radio and PB/Comm. Peace 3 units handheld radio and
05 accessories and Order
Jan. 2022 Dec. 2022 5% BDRRM 21,026.16
accessories purchased 21,026.16
3000-002-007- Purchase 1 unit generator with PB/Comm. Peace
06 dynamo and Order
Jan. 2022 Dec. 2022 5% BDRRM 45,000.00
Generator with dynamo purchased 45,000.00
3000-002-007- Provide uniform and PB/Comm. Peace Uniform and paraphernalia of brgy
Jan. 2023 Dec. 2023 GF/BDRRM 50,000.00
07 paraphernalia of Brgy Tanod and Order
tanod provided 50,000.00
3000-002-007- Increase the allowance of Brgy PB/Comm. Peace Increase of allowance of brgy tanod
Jan. 2023 Dec. 2023 GF 10,000.00
08 Tanod and Order
provided 10,000.00
3000-002-007- Procure disaster supplies and PB/Comm. Peace Disaster Supplies and equipments
Jan. 2023 Dec. 2023 5% BDRRM 40,000.00
09 equipment and Order procured 40,000.00

3000-002-007- Purchase emergency kit and tools for PB/Comm. Peace


Jan. 2023 Dec. 2023 Emergency kit and tools for Emergency 5% BDRRM 30,000.00
10 Emergency Response Team and Order
Response Team purchased 30,000.00
3000-002-009-
Purchase grocery items Oct.1, 2021 Oct.31, 2021 All Senior citizen provided with groceries 1% SC/PWD 11,194.27
01 PB 11,194.27
3000-002-009-
Purchase grocery items PB Nov. 2022 Nov. 30, 2022 All Senior citizen provided with groceries 1% SC/PWD 11,575.17 11,575.17
02
3000-002-
Purchase grocery items Oct.1, 2021 Oct.31, 2021 All PWDs provided with groceries 1% SC/PWD 11,194.27
010-01 PB 11,194.27
3000-002-
Purchase grocery items Nov. 2022 Nov. 30, 2022 All PWDs provided with groceries 1% SC/PWD 11,575.17
010-02 PB 11,575.17
3000-002- Offer intervention programs Intervention program for PWD and Senior
Jan-23 Dec. 2023 1% SC/PWD 12,000.00
010-03 for PWD and Senior Citizen PB Citizen provided 12,000.00
3000-002- construction of Footwalk going PB/Comm. On Footwalk going to Day Care Center
Mar-22 March 31,2022 5% GAD 45,751.65
011-01 to Day Care Center Educ constructed 45,751.65
3000-002- Construction of Public toiltet PB/Comm on
Apr-22 30-Apr-22 Public toilet for men and women constructed 5% GAD 40,000.00
011-02 for men and women Infra 40,000.00
3000-002- PB/Comm. On
Purchase medicines Jan-22 Dec. 2022 Medecines purchased 5% GAD 20,000.00
011-03 Healt 20,000.00
3000-002-012- Purchase school supplies for all PB/Comm.
1-Jun-21 Dec.31,2021 School items are provided to students 1% BCPC 6,500.00 6,500.00
01 students Educ
3000-002-012- PB/Comm.
02
Childrens Celebration day March 1, 2021 31-Mar-21 Vitamins purchases 1% BCPC 10,371.38 10,371.38
Educ
3000-002-012- Purchase school supplies for all PB/Comm.
1-Jun-22 Dec.31,2022 School items are provided to students 1% BCPC 23,110.33 23,110.33
03 students Educ
3000-002-014-
01
Purchase Hygiene kit for youth Sk Chairperson Jan.1 2021 Dec. 2021 Hygiene kit for youth purchased 10% SK Fund 23,000.00
23,000.00
3000-002-014-
Free school supplies Sk Chairperson Jan.1 2021 Dec. 2021 School items are provided to students 10% SK Fund 20,000.00
02 20,000.00
3000-002-014- Purchase of visual equipments
03
Sk Chairperson Jan.1 2021 Dec. 31, 2021 Visual equipments purchased 10% SK Fund 20,000.00
for students 20,000.00
3000-002-014- Purchase sports equipments
Sk Chairperson Jan.1 2021 Dec. 31, 2021 Sports equipments and supplies purchased 10% SK Fund 15,000.00
04 and supplies 15,000.00
Procure furniture and equipment for Furniture and equipments for Youth
3000-002-014
the Youth Center
Sk Chairperson Jan 2023 Dec. 2023 10% SK fund 50,000.00 50,000.00
Center procured
8000-002-004- Provide access to crop and livestock PB/ Comm. Crop and livestock insurance
insurance
Jan.1 2023 Dec. 31, 2023 GF 20,000.00
01 Agriculture provided to farmers 20,000.00
8000-002-004- Provide Access to financial support to PB/ Comm. Financial support to farmers External
Jan. 1, 2023 Dec. 31, 2023 100,000.00
02 farmers Agriculture provided Fund/SLP 100,000.00
8000-002- PB/ Comm. SBDP-
Construction of Water System 1-Aug-21 Dec. 31,2021 10,000.00 2,000,000.00
006-01 Infra Water system constructed (ELCAC FUND) 324,000.00 2,334,000.00
8000-002- Construct/ concrete of PB/ Comm. Brgy. Road constructed and SBDP-
Jul-21 Dec.31,2021 12,666,000.00
006-02 barangay road Infra concreted (ELCAC FUND) 12,666,000.00
8000-002-006- PB/ Comm.
Road maintenance jan 1,2021 Dec. 2021 20% DF 150,000.00
03 Infra 2.5km brgy road maintained 150,000.00
8000-002-006- PB/ Comm.
Road maintenance jan 1,2022 Dec. 2022 20% DF 62,206.60
04 Infra 2.5km brgy road maintained 62,206.60
9000-002-010- Tree palnting activities and PB/ Comm.
Jan 1,2021 Dec. 2022 300 trees palnted 10% SK fund 6,000.00 6,000.00
01 environment campaign Agriculture
9000-002- Conduct Reforestation PB/ Comm.
Jan. 2023 Dec. 2023 Reforestation conducted 20% DF 6,000.00 6,000.00
010-02 initiatives Agriculture

Prepared by: Attested by:

MRR. EDNEL CASTOR MRS. MA. ELENA AGUIRRE HON. NONITO C. LINGAYA
Barangay Secretary Barangay Treasurer Punong Barangay
LIST OF PRIORITY P/ P/ As for BARANGAYS
Barangay: Tacayan
City/Municipality:Tapaz
Province:
PPA COMMITMENTS Specific Location BUDGETARY REQUIREMENT ( P'000) IMPL.
IMPLEMENTING
Sitio/Barangay 2021 2022 2023 FUNDING SCHEDULE
ISSUES Programs/Projects Perfromance AGENCY/
SOURCE LGU
/Activities Indicators Municipality PS MOOE CO PS MOOE CO PS MOOE CO START END
Social
102 Household
No access to Access to Barangay Tacayan, External
electricity electrification
acess to
Tapaz,Capiz
5,000,000.00
Fund
Tapaz Aug-21 Dec-21
electrification

absence of facility to
Construction of Youth Center Barangay Tacayan
cater the needs of
Youth Center constructed Proper, Tapaz,Capiz
_ _ Jan-22 Dec-22
youth 100,000.00
Economic
construction of 1 water system
No source of potable Barangay Tacayan External
water Water system level II
Proper, Tapaz,Capiz
324,000.00 10,000.00 2,000,000.00
Fund
Tapaz Aug-21 Dec-21
level II constructed

Muddy and unpaved Concreting of brgy 3 km brgy road Barangay Tacayan, External
brgy road road concreted Tapaz,Capiz Fund
Tapaz Aug-21 Dec-21
12,666,000.00
Prepared By: Aprroved By:

MA. ELENA AGUIRRE HON. NONITO C. LINGAYA


Barangay Treasurer Punong Barangay

You might also like